Title Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string
Author(s) Bazin, Nicolas (CEA, DSM, Saclay ; IRFU, Saclay) ; Chambrillon, Janic Kevin (CERN) ; Devanz, Guillaume (CEA, DSM, Saclay ; IRFU, Saclay) ; Dzitko, Hervé (IRFU, Saclay) ; Hardy, Philippe (CEA, DSM, Saclay ; IRFU, Saclay) ; Neyret, Jerome (IRFU, Saclay) ; Servouin, Christophe (CEA, DSM, Saclay ; IRFU, Saclay) ; Toral, Fernando (Madrid, CIEMAT)
Publication 2015
Number of pages 4
In: 17th International Conference on RF Superconductivity, Whistler, Canada, 13 - 18 Sep 2015, pp.TUPB107
DOI 10.18429/JACoW-SRF2015-TUPB107
Subject category Accelerators and Storage Rings
Abstract The IFMIF LIPAc cryomodule houses eight half-wave resonators and eight solenoids which will be assembled on a support frame in clean room. Due to the short lattice defined by beam dynamics constraints, there is not much room between two elements for the operators’ hands to connect them. In order to test, optimize and validate the clean room assembly procedures and the associated tools, a test bench, consisting of a frame, a little bigger than one eight of the final support has been manufactured. In order to start the tests before the delivery of the actual key components of the cryomodule, a dummy cavity, solenoid and coupler were manufactured and will be used to perform tests outside and inside the clean room to validate the assembly procedure and the tools. The mock-up will then be used to train the operators for the assembly of the whole string.
Copyright/License CC-BY-3.0