Hlavná stránka > Construction and RF Conditioning of the Cell-Coupled Drift Tube Linac (CCDTL) for Linac4 at CERN |
Published Articles | |
Report number | CERN-ACC-2014-377 |
Title | Construction and RF Conditioning of the Cell-Coupled Drift Tube Linac (CCDTL) for Linac4 at CERN |
Author(s) | Tribendis, Alexey ; Biryuchevsky, Yuri ; Kendjebulatov, Ermek ; Kruchkov, Yaroslav ; Rotov, Evgeniy ; Zhukov, Alexandr ; Cuvet, Yves (CERN) ; Dallocchio, Alessandro (CERN) ; Fuchs, Jean-Frederic (CERN) ; Gerigk, Frank (CERN) ; Giguet, Jean-Michel (CERN) ; Hansen, Jan (CERN) ; Muranaka, Tomoko (CERN) ; Page, Eric (CERN) ; Riffaud, Benoit (CERN) ; Thaus, Nicolas (CERN) ; Tortrat, Monique (CERN) ; Vretenar, Maurizio (CERN) ; Wegner, Rolf (CERN) ; Naumenko, Mikhail |
Publication | 2014 |
Number of pages | 5 |
In: | 27th Linear Accelerator Conference, Geneva, Switzerland, 31 Aug - 5 Sep 2014, pp.WEIOA01 |
Subject category | Accelerators and Storage Rings |
Abstract | This paper reports on the construction experience of the Linac4 CCDTL, which took place in two Russian institutes in the framework of three ISTC projects in close collaboration with CERN. The tanks were constructed at VNIITF, Snezhinsk, while the drift tubes and supports were made at BINP, Novosibirsk. All structures were then assembled and tuned at BINP before shipment to CERN where the high-power conditioning took place. The tuning principles, quality checks and conditioning results are presented. |