Abstract
| For the MedAustron facility under construction in Wiener Neustadt/Austria, two electrostatic septa are built in collaboration with CERN. These septa will be used for the multi-turn injection of protons and ions, as well as for the slow extraction from the synchrotron. The power supplies are designed to combine the required precision with the capability to cycle sufficiently fast to keep up with the machine cycle. The septa are being assembled at CERN. Initial tests have been done on the remote displacement system to validate its precision and communication protocol with the MedAustron control system. Subsequently the septa are tested for vacuum performance and then HV conditioned. The construction of the septa, the requirements of the power supplies and the high voltage circuit will be described. Results of the initial laboratory tests, prior to installation in the accelerator, will be given. |