CERN Accelerating science

CERN Document Server 2,049 záznamov nájdených  1 - 10ďalšíkoniec  skoč na záznam: Hľadanie trvalo 0.46 sekúnd. 
1.
Construction and RF Conditioning of the Cell-Coupled Drift Tube Linac (CCDTL) for Linac4 at CERN / Tribendis, Alexey ; Biryuchevsky, Yuri ; Kendjebulatov, Ermek ; Kruchkov, Yaroslav ; Rotov, Evgeniy ; Zhukov, Alexandr ; Cuvet, Yves (CERN) ; Dallocchio, Alessandro (CERN) ; Fuchs, Jean-Frederic (CERN) ; Gerigk, Frank (CERN) et al.
This paper reports on the construction experience of the Linac4 CCDTL, which took place in two Russian institutes in the framework of three ISTC projects in close collaboration with CERN. The tanks were constructed at VNIITF, Snezhinsk, while the drift tubes and supports were made at BINP, Novosibirsk. [...]
CERN-ACC-2014-377.- 2014 - 5 p. - Published in : (2014) , pp. WEIOA01 Fulltext: weioa01_2 - PDF; weioa01 - PDF; External link: JACoW server
In : 27th Linear Accelerator Conference, Geneva, Switzerland, 31 Aug - 5 Sep 2014, pp.WEIOA01
2.
Experience with the conditioning of Linac4 RF cavities / Papadopoulos, Sotirios (CERN) ; Gerigk, Frank (CERN) ; Giguet, Jean-Michel (CERN) ; Hansen, Jan (CERN) ; Marques Balula, Jose (CERN) ; Michet, Alice (CERN) ; Ramberger, Suitbert (CERN) ; Thaus, Nicolas (CERN) ; Wegner, Rolf (CERN)
Linac4, the future H⁻ injector of the PS complex at CERN has reached the hardware and beam commissioning phase. This paper summarizes the experience gained in RF conditioning of the DTL, CCDTL and PIMS cavities. [...]
CERN-ACC-2017-344.- 2017 - 4 p. - Published in : 10.18429/JACoW-LINAC2016-THPLR060 Fulltext: PDF;
In : 28th Linear Accelerator Conference, East Lansing, Michigan, 25 - 30 Sep 2016, pp.THPLR060
3.
CCDTL design update for Linac4 / Pasini, M
CARE-NOTE-2005-014-HIPPI.
- 2005.
Fulltext
4.
Linac4: From Initial Design to Final Commissioning / Lombardi, Alessandra (CERN)
This talk reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shut down (LS2) and will then replace the ageing Linac2..
CERN-ACC-2017-191.- 2017 - 6 p. - Published in : 10.18429/JACoW-IPAC2017-TUYA1 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.TUYA1
5.

CERN-PHOTO-201402-030
© 2014-2022 CERN
Linac4 PIMS
LINAC4 PIMS
17-02-2014
More >>
6.

CERN-AC-1210210
© 2012-2024 CERN
Module CCDTL Linac4 tested in the SM18
08 Oct 2012
More >>
7.
Performance of Linac-4 instrumentation during commissioning / Raich, Uli (CERN)
Linac-4 is CERN’s new H⁻ Linac, which will replace the aging Linac-2 proton machine. Linac-4 is being built and commissioned in stages. [...]
2016 - 6 p. - Published in : 10.18429/JACoW-HB2016-WEPM1X01 Fulltext: PDF;
In : 57th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams, Malmö, Sweden, 3 - 8 Jul 2016, pp.WEPM1X01
8.
LINAC4 Commissioning / Lombardi, Alessandra (CERN) /Linac4
This paper reviews the design, construction, and commissioning effort of CERN's new proton linear accelerator, Linac4, which has recently been commissioned and which is presently undergoing a reliability run. Linac4 will be connected to the LHC proton injector chain during the next long LHC shutdown (LS2) and will then replace the ageing Linac2..
CERN-ACC-2018-196.- 2018 - 5 p. - Published in : 10.18429/JACoW-LINAC2018-TH1P01 Fulltext: th1p01 - PDF; th1p01_2 - PDF;
In : 29th International Linear Accelerator Conference, Beijing, China, 16 - 21 Sep 2018, pp.TH1P01
9.
Beam Instrumentation Performance during Commissioning of CERN's Linac-4 to 50 MeV and 100 MeV / Raich, Uli (CERN) ; Hofmann, Thomas (CERN) ; Roncarolo, Federico (CERN)
Linac-4, a 140 MeV H-linear accelerator is designed to replace the aging 50 MeV proton Linac. It will consist of an H-source and 45 keV LEBT, an RFQ and 3 MeV MEBT with a chopper, 3 drift tube linac (DTL) tanks accelerating the beam to 12, 30 and 50 Mev, cavity coupled structures (CCDTL) accelerating it to 100 MeV and a pi mode structure bringing it to its design energy of 160 MeV. [...]
CERN-ACC-2016-313.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-MOPMR026 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.MOPMR026
10.
Beam Commissioning of Linac4 up to 12 MeV / Dimov, Veliko (CERN) ; Belli, Eleonora (CERN) ; Bellodi, Giulia (CERN) ; Lallement, Jean-Baptiste (CERN) ; Lombardi, Alessandra (CERN) ; Yarmohammadi Satri, Masoomeh (IPM, Tehran)
CERN Linac4 is made of a 3 MeV front end including a 45 keV source , a 3 MeV Radio Frequency Quadrupole (RFQ) and a fast chopper, followed by a 50 MeV Drift Tube Linac (DTL), a 100 MeV Cell-Coupled Drift Tube Linac (CCDTL) and a 160 MeV Pi-Mode Structure (PIMS). The Linac4 beam commissioning is performed in 6 stages of increasing energy. [...]
CERN-ACC-2015-016.- 2015 - 4 p. - Published in : (2015) , pp. THPF085 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF085

Nenašli ste čo ste hľadali? Skúste Vašu otázku na iných serveroch:
recid:2062607 v Amazon
recid:2062607 v CERN EDMS
recid:2062607 v CERN Intranet
recid:2062607 v CiteSeer
recid:2062607 v Google Books
recid:2062607 v Google Scholar
recid:2062607 v Google Web
recid:2062607 v IEC
recid:2062607 v IHS
recid:2062607 v INSPIRE
recid:2062607 v ISO
recid:2062607 v KISS Books/Journals
recid:2062607 v KISS Preprints
recid:2062607 v NEBIS
recid:2062607 v SLAC Library Catalog