CERN Accelerating science

CERN Document Server 9 záznamov nájdených  Hľadanie trvalo 0.89 sekúnd. 
1.
CERN Yellow Report Front Cover High-Luminosity Large Hadron Collider (HL-LHC): Technical design report / Aberle, O. ; Béjar Alonso, I (ed.) ; Brüning, O (ed.) ; Fessia, P (ed.) ; Rossi, L (ed.) ; Tavian, L (ed.) ; Zerlauth, M (ed.)
The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built [...]
CERN-2020-010. - Geneva : CERN, 2020. - 390 p. (CERN Yellow Reports: Monographs ; 10/2020)


ebook
2.
CERN Yellow Report Front Cover Linac4 design report / Vretenar, Maurizio (ed.)
Linear accelerator 4 (Linac4) is designed to accelerate negative hydrogen ions for injection into the Proton Synchrotron Booster (PSB) [...]
CERN-2020-006. - Geneva : CERN, 2020. - 137 p. (CERN Yellow Reports: Monographs ; 6/2020)


ebook
3.
Progress in the Construction of Linac4 at CERN / Vretenar, M (CERN) ; Arnaudon, L (CERN) ; Baudrenghien, P (CERN) ; Bertone, C (CERN) ; Body, Y (CERN) ; Broere, J (CERN) ; Brunner, O (CERN) ; Bellodi, G (CERN) ; Buzio, M (CERN) ; Carli, C (CERN) et al.
As first step of the LHC luminosity upgrade program CERN is building a new 160 MeV H¯ linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the PS Booster (PSB). Linac4 is an 86-m long normalconducting linac made of a 3 MeV injector followed by 22 accelerating cavities of three different types. [...]
2013 - 3 p. - Published in : Conf. Proc.: C120909 (2012) , pp. THPB010 External link: Published version from JaCoW
In : 26th International Linear Accelerator Conference, Tel Aviv, Israel, 9 - 14 Sep 2012, pp.864-866
4.
The LINAC4 Project at CERN / Arnaudon, L (CERN) ; Baudrenghien, P (CERN) ; Bertone, C (CERN) ; Body, Y (CERN) ; Broere, J (CERN) ; Brunner, O (CERN) ; Buzio, M (CERN) ; Carli, C (CERN) ; Caspers, F (CERN) ; Corso, JP (CERN) et al.
As the first step of a long-term programme aiming at an increase in the LHC luminosity, CERN is building a new 160 MeV H¯ linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the PS Booster (PSB). Linac4 is an 86-m long normal-conducting linac made of an H¯ source, a Radio Frequency Quadrupole (RFQ), a chopping line and a sequence of three accelerating structures: a Drift-Tube Linac (DTL), a Cell-Coupled DTL (CCDTL) and a Pi-Mode Structure (PIMS). [...]
CERN-ATS-2011-041.- Geneva : CERN, 2011 - 4 p. Fulltext: PDF; External link: Published version from JACoW
In : 2nd International Particle Accelerator Conference, San Sebastian, Spain, 4 - 9 Sep 2011, pp.TUOAA03
5.
CV activities on the LHC complex during the long shutdown / Deleval, S (CERN) ; Nonis, M (CERN) ; Body, Y (CERN) ; Obrecht, M (CERN) ; Moccia, S (CERN) ; Peon, G (CERN)
The presentation gives an overview of the major projects and work foreseen to be performed during next long shutdown on cooling and ventilation plants. Several projects are needed following the experience of the last years when LHC was running, in particular the modifications in the water cooling circuits presently in overflow. [...]
2011 - Published in : 10.5170/CERN-2011-005.130 Published version from CERN: PDF; Slides: PDF;
In : Chamonix 2011 Workshop on LHC Performance, pp.130-133
6.
Linac4 Technical Design Report / Arnaudon, L ; Baudrenghien, P ; Baylac, M ; Bellodi, G ; Body, Y ; Borburgh, J ; Bourquin, P ; Broere, J ; Brunner, O ; Bruno, L et al.
Linac4 is an H- linear accelerator, intended to replace Linac2 as injector to the PS Booster (PSB). [...]
CERN-AB-2006-084 ; CARE-Note-2006-022-HIPPI.
- 2006. - 141 p.
Access to fulltext document - Fulltext
7.
The SPL (II) at CERN, a Superconducting 3.5 GeV H- Linac / Gerigk, F ; Baylac, M ; Bellodi, G ; Benedico-Mora, E ; Body, Y ; Caspers, Friedhelm ; Chel, S ; De Conto, J M ; Duperrier, R ; Froidefond, E et al.
A revision of the physics needs and recent progress in the technology of superconducting (SC) RF cavities have triggered major changes in the design of a SC H-linac at CERN. [...]
CERN-AB-2006-081.
- 2006. - 4 p.
Access to fulltext document
8.
Construction progress of the cooling & ventilation in the LHC project / Body, Y ; Jena, H ; Josa, F ; Monsted, A ; Pirollet, B
After the LEP dismantling Phase the Cooling and Ventilation Group has started the LHC construction work. Year 2001 through to 2004 will certainly be the most important period of activity for the CV group in the erection phase The author will report on the current works that are in progress on the different LHC Points distinguishing between the Ventilation and the Water Cooling installations. [...]
ST-Note-2002-035-CV.- Geneva : CERN, 2002 Access to document: PDF;
In : 5th ST Workshop, Echenevex, France, 28 - 30 Jan 2002, pp.431-435
9.
Control System Implementation and Follow-up within the Cooling and Ventilation Contracts for the LHC / Body, Y ; Jena, H ; Morodo, M C
The control system implementation for the cooling and ventilation facilities connected to the LHC Project relies on the technical and human resources that are organised within large-size industrial contracts. Beside the technical aspects, the follow-up of the implementation activities in the framework of such contracts also involves a managerial effort in order to achieve a flexible and coherent control system. [...]
CERN-ST-2001-021.- Geneva : CERN, 2001 - 9 p. Access to fulltext document: DOC PDF;
In : 4th ST Workshop, Chamonix, France, 30 Jan - 2 Feb 2001, pp.233-242 - CERN library copies

Viď tiež: podobné mená autorov
2 Body, Y.
Prajete si byť pravidelne informovaný o výsledkoch tohto hľadania?
Založte si osobný email alert alebo použite RSS feed.
Nenašli ste čo ste hľadali? Skúste Vašu otázku na iných serveroch:
Body, Y v Amazon
Body, Y v CERN EDMS
Body, Y v CERN Intranet
Body, Y v CiteSeer
Body, Y v Google Books
Body, Y v Google Scholar
Body, Y v Google Web
Body, Y v IEC
Body, Y v IHS
Body, Y v INSPIRE
Body, Y v ISO
Body, Y v KISS Books/Journals
Body, Y v KISS Preprints
Body, Y v NEBIS
Body, Y v SLAC Library Catalog
Body, Y v Scirus