CERN Accelerating science

CERN Document Server 6 záznamov nájdených  Hľadanie trvalo 0.68 sekúnd. 
1.
Configuration Management Best Practices / Feral, Bruno (CERN) ; Bartolome Jimenez, Sonia (CERN) ; Birtwistle, Thomas William (CERN) ; Musso, Andrea (CERN) ; Perrot, Anne-Laure (CERN)
Configuration management (CM) is used for the configuration of complex systems in many fields, such as IT, aeronautics, shipbuilding, space systems, nuclear power plants, etc. [...]
CERN-ACC-NOTE-2022-0033.
- 2022. - 5 p.
Full text
2.
360 Degree Panoramic Photographs During the Long Shutdown 2 of the CERN Machines and Facilities / Birtwistle, Thomas (CERN) ; Ansel, Antoine (CERN) ; Bartolomé Jiménez, Sonia (CERN) ; Feral, Bruno (CERN) ; Lacerda, Gil (CERN) ; Perrot, Anne-Laure (CERN) ; Piñera Ovejero, Juan F (CERN)
Studies and preparation of activities are key to the success of short technical stops and longer shutdowns in CERN’s accelerator complex. The ’Panorama’ tool offers a virtual tour of our facilities, and thanks to integration with other CERN tools, further complementary information can be easily retrieved, including layout information, equipment detail, and a history of changes. [...]
Geneva : JACoW, 2021 - 3 p. - Published in : JACoW IPAC '21 (2021) 3410-3412 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3410-3412
3.
New Coordination Tools to Prepare the Programmed Stops in the LHC and its Injectors / Chemli, Samy (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Bolognesi, Andrea (CERN) ; Brito de Palma, Bernardo (CERN) ; Bustamante, Sebastien (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Kleszcz, Emil (CERN) ; Kotsolakos, Nikitas (CERN) et al.
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics delivery to Experiments with a two-year long stop, also known as Long Shutdown (LS). The years of physics delivery are ended by a programmed stop for the immediate preventive and corrective maintenance, also known as (Extended)-Year-End Technical Stop - (E)YETS. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF044
4.
CERN Accelerators Topology Configuration: Facing the Next Long Shutdown / Bartolome-Jimenez, Sonia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Gilbert, Nicolas (CERN) ; Perrot, Anne-Laure (CERN) ; Piar, Juraj (CERN) ; Simetka, Vojtech (CERN) ; Vazquez de Prada Planas, Blanca (CERN)
The Configuration and Layout (CL) team at CERN ensures that there is a clear and coherent representation of the status of the CERN underground facilities (about 60 km of equipment) and main accelerator projects at a given point in time. In view of the major equipment changes to be carried out during the extended end of year technical stop (EYETS), the next Long Shutdown (LS2), and to facilitate the associated preparatory work of multiple CERN groups, the CL team has developed an immersive visualisation tool, displaying 360 degree panoramic images of CERN underground facilities. [...]
CERN-ACC-2017-235.- 2017 - 3 p. - Published in : 10.18429/JACoW-IPAC2017-THPAB145 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.THPAB145
5.
Integration, Configuration and Coordination: from Project to Reality, at CERN / Barberan Marin, Maria (CERN) ; Bartolome-Jimenez, Sonia (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Muttoni, Yvon (CERN) et al.
The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. [...]
CERN-ACC-2016-267.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-TUPMW003 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.TUPMW003
6.
Status and Plans for the Upgrade of the CERN PS Booster / Hanke, Klaus (CERN) ; Aguglia, Davide (CERN) ; Angoletta, Maria Elena (CERN) ; Bartmann, Wolfgang (CERN) ; Bedel, Cyrille (CERN) ; Benedetto, Elena (CERN) ; Bertolasi, Stefano (CERN) ; Bertone, Caterina (CERN) ; Betz, Jochen (CERN) ; Birtwistle, Thomas (CERN) et al.
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. [...]
CERN-ACC-2015-011.- 2015 - 3 p. - Published in : (2015) , pp. THPF090 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF090

Viď tiež: podobné mená autorov
1 Birtwistle, T
2 Birtwistle, Thomas William
Prajete si byť pravidelne informovaný o výsledkoch tohto hľadania?
Založte si osobný email alert alebo použite RSS feed.
Nenašli ste čo ste hľadali? Skúste Vašu otázku na iných serveroch:
Birtwistle, Thomas v Amazon
Birtwistle, Thomas v CERN EDMS
Birtwistle, Thomas v CERN Intranet
Birtwistle, Thomas v CiteSeer
Birtwistle, Thomas v Google Books
Birtwistle, Thomas v Google Scholar
Birtwistle, Thomas v Google Web
Birtwistle, Thomas v IEC
Birtwistle, Thomas v IHS
Birtwistle, Thomas v INSPIRE
Birtwistle, Thomas v ISO
Birtwistle, Thomas v KISS Books/Journals
Birtwistle, Thomas v KISS Preprints
Birtwistle, Thomas v NEBIS
Birtwistle, Thomas v SLAC Library Catalog
Birtwistle, Thomas v Scirus