CERN Accelerating science

CERN Document Server 8 records found  Search took 0.64 seconds. 
1.
LHC abort gap monitor electronics upgrade / Pacner, Petr (CERN) ; Belohrad, David (CERN) ; Martin Nieto, Miguel (CERN) ; Mazzoni, Stefano (CERN) ; Bart Pedersen, Stephane (CERN)
The LHC Abort Gap Monitor (AGM) is part of the LHC machine protection system (MPS) and is designed to measure the particle population in a 3µs wide region known as the "abort gap." This region needs to be kept empty to ensure safe beam dumps. The AGM captures the synchrotron light generated in the visible part of the spectra and converts it into an electric signal. [...]
2024 - 4 p. - Published in : JACoW IPAC 2024 (2024) TUPR78 Fulltext: PDF;
In : 15th International Particle Accelerator Conference (IPAC 2024), Nashville, TN, United States, 19 - 24 May 2024, pp.TUPR78
2.
SPS Fast Spill Monitor Characterisation and Evaluation Throughout 2023 / Benitez Berrocal, Sara (CERN) ; Belohrad, David (CERN) ; Burger, Stephane (CERN) ; Goldblatt, Aurelie Noelle (CERN) ; Martin Nieto, Miguel (CERN) ; Mazzoni, Stefano (CERN) ; Roncarolo, Federico (CERN)
Monitoring the intensity of protons extracted from the CERN Super Proton Synchrotron )SPS) ring towards the North Area (NA) facility at a high rate is of utmost importance, with increasing challenges, for the the current facility operation, the ongoing NA consolidation, and the future Physics Beyond Colliders (PBC) projects. Various instruments are being developed to measure beam current fluctuations across a broad range of frequencies, from a few hundred Hz to several hundred MHz. [...]
CERN-PBC-Notes-2024-005.- Geneva : CERN, 2023 - 14. Fulltext: PDF;
3.
The Digital Signal Processing Chain of the CERN LIU BWS / Belohrad, David (CERN) ; Emery, Jonathan (CERN) ; Esteban Felipe, Jose (CERN) ; Goldblatt, Aurélie (CERN) ; Guerrero, Ana (CERN) ; Martin Nieto, Miguel (CERN) ; Roncarolo, Federico (CERN)
Between 2019 and 2023, as part of the LHC Injectors Upgrade (LIU), a major renovation of the CERN wire scanners (BWS) was performed. The main driving force was to prepare the wire scanners for the High-Luminosity LHC (HL-LHC), during which the instantaneous luminosity is expected to double, to around 5× 10³⁴cm⁻²s⁻¹. [...]
2023 - 5 p. - Published in : JACoW IBIC 2023 (2023) 288-292 Fulltext: PDF;
In : 12th International Beam Instrumentation Conference (IBIC 2023), Saskatoon, Canada, 10 - 14 Sep 2023, pp.288-292
4.
Experimental Investigation of Gold Coated Tungsten Wires Emissivity for Applications in Particle Accelerators / Navarro Fernandez, Araceli (CERN) ; Martin Nieto, Miguel (CERN) ; Roncarolo, Federico (CERN)
The operation of wire grids and wire scanners as beam profile monitors can be heavily affected, both in terms of measurement accuracy and wire integrity, by the thermal response of the wires to the energy deposited by the charged particles. Accurate measurements of material emissivity are crucial, as Radiative Cooling represent the most relevant cooling process. [...]
2022 - 5 p. - Published in : JACoW IBIC 2022 (2022) 438-442 Fulltext: PDF;
In : 11th International Beam Instrumentation Conference (IBIC 2022), Cracow, Poland, 11 - 15 Sep 2022, pp.438-442
5.
Assessing the Performance of the New Beam Wire Scanners for the CERN LHC Injectors / Di Carlo, Salvatore (CERN) ; Andreazza, William (CERN) ; Belohrad, David (CERN) ; Emery, Jonathan (CERN) ; Esteban Felipe, Jose (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Guerrero, Ana (CERN) ; Jackson, Stephen (CERN) ; Lacarrere, Guillaume (CERN) et al.
Reliably measuring the transverse beam profile in the LHC injector chain is essential for the operation of the CERN accelerator complex. This report aims to assess the reliability, stability, and reproducibility of a new generation of beam wire scanners developed at CERN in the framework of the LHC Injectors Upgrade (LIU). [...]
2022 - 4 p. - Published in : JACoW IBIC 2022 (2022) 443-446 Fulltext: PDF;
In : 11th International Beam Instrumentation Conference (IBIC 2022), Cracow, Poland, 11 - 15 Sep 2022, pp.443-446
6.
Fast Spill Monitor Studies for the SPS Fixed Target Beams / Roncarolo, Federico (CERN) ; Arrutia Sota, Pablo Andreas (CERN) ; Belohrad, David (CERN) ; Bergamaschi, Michele (CERN) ; Calvo Giraldo, Eva (CERN) ; Effinger, Ewald (CERN) ; Fraser, Matthew (CERN) ; Kain, Verena (CERN) ; Martin Nieto, Miguel (CERN) ; Mazzoni, Stefano (CERN) et al.
At the CERN Super Proton Synchrotron (SPS) the proton beam is supplied to the fixed target experiments in the North Area facility (NA) via a slow extraction process, taking place at 400 GeV. The monitoring of the spill quality during the extraction, lasting 4.8 seconds with the present SPS setup, is of high interest for minimising beam losses and providing the users with uniform proton-on-target rates. [...]
2022 - 5 p. - Published in : JACoW IBIC 2022 (2022) 522-526 Fulltext: PDF;
In : 11th International Beam Instrumentation Conference (IBIC 2022), Cracow, Poland, 11 - 15 Sep 2022, pp.522-526
7.
A New Luminosity Monitor for the LHC Run 3 / Mazzoni, Stefano (CERN) ; Andreazza, William (CERN) ; Balci, Elif (CERN) ; Belohrad, David (CERN) ; Bravin, Enrico (CERN) ; Chritin, Nicolas (CERN) ; Esteban Felipe, Jose (CERN) ; Lefèvre, Thibaut (CERN) ; Martin Nieto, Miguel (CERN) ; Palm, Marcus (CERN)
The Beam Rate of Neutrals (BRAN) is a monitor that provides a relative luminosity measurement for the four LHC experiments. BRANs are used during operations as a tool to find and optimise collision and to cross-check experiments luminosity monitors. [...]
2022 - 5 p. - Published in : JACoW IBIC 2022 (2022) 163-167 Fulltext: PDF;
In : 11th International Beam Instrumentation Conference (IBIC 2022), Cracow, Poland, 11 - 15 Sep 2022, pp.163-167
8.
Commissioning of the LHC Injectors BWS Upgrade / Emery, Jonathan (CERN) ; Andreazza, William (CERN) ; Belohrad, David (CERN) ; Di Carlo, Salvatore (CERN) ; Esteban Felipe, Jose C (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Guerrero, Ana (CERN) ; Jackson, Stephen (CERN) ; Lacarrere, Guillaume O (CERN) et al.
A novel generation of fast Beam Wire Scanners (BWS), developed in the framework of the LHC Injectors Upgrade (LIU), has been recently deployed in the 3 LHC injector synchrotrons, accelerating protons from 160 MeV to 450 GeV, during the 2019-2020 LHC long shutdown. The monitors feature high precision motor controller, high resolution wire position monitoring and wide dynamic range secondary particles detectors. [...]
JACoW, 2021 - 5 p. - Published in : JACoW IBIC 2021 (2021) 239-243 Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.239-243

Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Haven't found what you were looking for? Try your search on other servers:
Martin Nieto, Miguel em Amazon
Martin Nieto, Miguel em CERN EDMS
Martin Nieto, Miguel em CERN Intranet
Martin Nieto, Miguel em CiteSeer
Martin Nieto, Miguel em Google Books
Martin Nieto, Miguel em Google Scholar
Martin Nieto, Miguel em Google Web
Martin Nieto, Miguel em IEC
Martin Nieto, Miguel em IHS
Martin Nieto, Miguel em INSPIRE
Martin Nieto, Miguel em ISO
Martin Nieto, Miguel em KISS Books/Journals
Martin Nieto, Miguel em KISS Preprints
Martin Nieto, Miguel em NEBIS
Martin Nieto, Miguel em SLAC Library Catalog
Martin Nieto, Miguel em Scirus