CERN Accelerating science

CERN Document Server 6 record trovati  La ricerca ha impiegato 0.74 secondi. 
1.
Configuration Management Best Practices / Feral, Bruno (CERN) ; Bartolome Jimenez, Sonia (CERN) ; Birtwistle, Thomas William (CERN) ; Musso, Andrea (CERN) ; Perrot, Anne-Laure (CERN)
Configuration management (CM) is used for the configuration of complex systems in many fields, such as IT, aeronautics, shipbuilding, space systems, nuclear power plants, etc. [...]
CERN-ACC-NOTE-2022-0033.
- 2022. - 5 p.
Full text
2.
360 Degree Panoramic Photographs During the Long Shutdown 2 of the CERN Machines and Facilities / Birtwistle, Thomas (CERN) ; Ansel, Antoine (CERN) ; Bartolomé Jiménez, Sonia (CERN) ; Feral, Bruno (CERN) ; Lacerda, Gil (CERN) ; Perrot, Anne-Laure (CERN) ; Piñera Ovejero, Juan F (CERN)
Studies and preparation of activities are key to the success of short technical stops and longer shutdowns in CERN’s accelerator complex. The ’Panorama’ tool offers a virtual tour of our facilities, and thanks to integration with other CERN tools, further complementary information can be easily retrieved, including layout information, equipment detail, and a history of changes. [...]
Geneva : JACoW, 2021 - 3 p. - Published in : JACoW IPAC '21 (2021) 3410-3412 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3410-3412
3.
New Coordination Tools to Prepare the Programmed Stops in the LHC and its Injectors / Chemli, Samy (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Bolognesi, Andrea (CERN) ; Brito de Palma, Bernardo (CERN) ; Bustamante, Sebastien (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Kleszcz, Emil (CERN) ; Kotsolakos, Nikitas (CERN) et al.
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics delivery to Experiments with a two-year long stop, also known as Long Shutdown (LS). The years of physics delivery are ended by a programmed stop for the immediate preventive and corrective maintenance, also known as (Extended)-Year-End Technical Stop - (E)YETS. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF044
4.
CERN Accelerators Topology Configuration: Facing the Next Long Shutdown / Bartolome-Jimenez, Sonia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Gilbert, Nicolas (CERN) ; Perrot, Anne-Laure (CERN) ; Piar, Juraj (CERN) ; Simetka, Vojtech (CERN) ; Vazquez de Prada Planas, Blanca (CERN)
The Configuration and Layout (CL) team at CERN ensures that there is a clear and coherent representation of the status of the CERN underground facilities (about 60 km of equipment) and main accelerator projects at a given point in time. In view of the major equipment changes to be carried out during the extended end of year technical stop (EYETS), the next Long Shutdown (LS2), and to facilitate the associated preparatory work of multiple CERN groups, the CL team has developed an immersive visualisation tool, displaying 360 degree panoramic images of CERN underground facilities. [...]
CERN-ACC-2017-235.- 2017 - 3 p. - Published in : 10.18429/JACoW-IPAC2017-THPAB145 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.THPAB145
5.
Integration, Configuration and Coordination: from Project to Reality, at CERN / Barberan Marin, Maria (CERN) ; Bartolome-Jimenez, Sonia (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Muttoni, Yvon (CERN) et al.
The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. [...]
CERN-ACC-2016-267.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-TUPMW003 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.TUPMW003
6.
Status and Plans for the Upgrade of the CERN PS Booster / Hanke, Klaus (CERN) ; Aguglia, Davide (CERN) ; Angoletta, Maria Elena (CERN) ; Bartmann, Wolfgang (CERN) ; Bedel, Cyrille (CERN) ; Benedetto, Elena (CERN) ; Bertolasi, Stefano (CERN) ; Bertone, Caterina (CERN) ; Betz, Jochen (CERN) ; Birtwistle, Thomas (CERN) et al.
CERN’s Proton Synchrotron Booster (PSB) is undergoing a major upgrade program in the frame of the LHC Injectors Upgrade (LIU) project. During the first long LHC shutdown (LS1) some parts of the upgrade have already been implemented, and the machine has been successfully re-commissioned. [...]
CERN-ACC-2015-011.- 2015 - 3 p. - Published in : (2015) , pp. THPF090 Published version from JACoW: PDF; External link: JACOW
In : 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF090

Vedi anche: autori con nomi simili
1 Birtwistle, T
2 Birtwistle, Thomas William
Sei interessato ad essere notificato su nuovi risultati di questa ricerca?
Imposta un avviso via mail personale o iscriviti al feed RSS.
Non hai trovato quello che cercavi? Prova la ricerca su altri server:
Birtwistle, Thomas in Amazon
Birtwistle, Thomas in CERN EDMS
Birtwistle, Thomas in CERN Intranet
Birtwistle, Thomas in CiteSeer
Birtwistle, Thomas in Google Books
Birtwistle, Thomas in Google Scholar
Birtwistle, Thomas in Google Web
Birtwistle, Thomas in IEC
Birtwistle, Thomas in IHS
Birtwistle, Thomas in INSPIRE
Birtwistle, Thomas in ISO
Birtwistle, Thomas in KISS Books/Journals
Birtwistle, Thomas in KISS Preprints
Birtwistle, Thomas in NEBIS
Birtwistle, Thomas in SLAC Library Catalog
Birtwistle, Thomas in Scirus