CERN Accelerating science

CERN Document Server 32 records found  1 - 10nextend  jump to record: Search took 0.66 seconds. 
1.
Cooling and Ventilation Studies for the CLIC / Cabral, Pedro (CERN (CH), Instituto Superior Tecnico (PT))) ; Nonis, Mauro (CERN)
The CLiC is composed of a large-scale complex requiring cooling and ventilation infrastructures in surface buildings and in underground tunnels [...]
CERN-ACC-2020-0025 ; CLIC-Note-1164.
- 2019 - 43.
Full text
2.
CERN Yellow Report Front Cover A primary electron beam facility at CERN —eSPS : Conceptual design report / Aicheler, M. ; Akesson, T. (ed.) ; Stapnes, S. (ed.)
The design of a primary electron beam facility at CERN is described [...]
arXiv:2009.06938 ; CERN-2020-008 CERN-2020-008 ; CERN-PBC-REPORT-2021-004. - 2020-12. - 175 p. (CERN Yellow Reports: Monographs ; 8/2020)


Publication
3.
LHC Full Energy Exploitation Study: Operation at Ultimate Energy of 7.5 TeV / Bruning, Oliver (CERN) ; Antipov, Sergey (CERN) ; Amorim, David (Universite Grenoble-Alpes (FR)) ; Arduini, Gianluigi (CERN) ; Apollonio, Andrea (CERN) ; Ball, Austin (CERN) ; Baglin, Vincent (CERN) ; Bartmann, Wolfgang (CERN) ; Battistin, Michele (CERN) ; Biancacci, Nicolo (CERN) et al.
This report discusses the feasibility and limitations for operating the LHC and HL-LHC at the ultimate beam energy of 7.5 TeV, corresponding to a main dipole magnetic field of 8.93 T and an operating current of 12748 A..
CERN-ACC-2019-0015.
- 2019. - 57 p.
Full text
4.
CERN Yellow Report Front Cover The Compact Linear Collider (CLIC) - 2018 Summary Report / Burrows, P.N. ; Catalan Lasheras, N. (ed.) ; Linssen, L. (ed.) ; Petrič, M. (ed.) ; Robson, A. (ed.) ; Schulte, D. (ed.) ; Sicking, E. (ed.) ; Stapnes, S. (ed.)
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^−$ collider under development at CERN [...]
arXiv:1812.06018 ; CERN-2018-005-M ; CERN-2018-005 CERN-2018-005-M ; CERN-2018-005. - 2018-12-14 - 112. (CERN Yellow Reports: Monographs ; 2/2018)


Publication
5.
Electrical Power Budget for FCC-ee / Aull, S. (CERN) ; Benedikt, M. (CERN) ; Bozzini, D. (CERN) ; Brunner, O. (CERN) ; Burnet, J.-P. (CERN) ; Butterworth, A. (CERN) ; Calaga, R. (CERN) ; Jensen, E. (CERN) ; Mertens, V. (CERN) ; Milanese, A. (CERN) et al.
We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D; on highly efficient RF power sources. [...]
CERN-ACC-2016-0080; CERN-ACC-2016-0065.- Geneva : CERN, 2016 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.THPOR024
6.
Final report on the Controlled Cold Helium Spill Test in the LHC tunnel at CERN / Dufay-Chanat, L (CERN) ; Bremer, J (CERN) ; Casas-Cubillos, J (CERN) ; Chorowski, M (Wroclaw Tech. U.) ; Grabowski, M (Wroclaw Tech. U.) ; Jedrusyna, A (Wroclaw Tech. U.) ; Lindell, G (CERN) ; Nonis, M (CERN) ; Koettig, T (CERN) ; Vauthier, N (CERN) et al.
The 27 km circumference LHC underground tunnel is a space in which the helium cooled LHC magnets are installed. The vacuum enclosures of the superconducting magnets are protected by over-pressure safety relief devices that open whenever cold helium escapes either from the magnet cold enclosure or from the helium supply headers, into this vacuum enclosure. [...]
2015 - Published in : IOP Conf. Ser. Mater. Sci. Eng. 101 (2015) 012123 IOP Open Access article: PDF;
In : Advances in Cryogenic Engineering: Cryogenic Engineering Conference, Tucson, AZ, USA, 28 Jun - 2 Jul 2015, pp.012123
7.
Controlled Cold Helium Spill Test in the LHC Tunnel at CERN / Koettig, T (CERN) ; Casas-Cubillos, J (CERN) ; Chorowski, M (Wroclaw Tech. U.) ; Dufay-Chanat, L (CERN) ; Grabowski, M (Wroclaw Tech. U.) ; Jedrusyna, A (Wroclaw Tech. U.) ; Lindell, G (CERN) ; Nonis, M (CERN) ; Vauthier, N (CERN) ; van Weelderen, R (CERN) et al.
The helium cooled magnets of the LHC particle accelerator are installed in a confined space, formed by a 27 km circumference 3.8 m diameter underground tunnel. The vacuum enclosures of the superconducting LHC magnets are protected by a lift plate against excessive overpressure created by eventual leaks from the magnet helium bath, or from the helium supply headers. [...]
2015 - 9 p. - Published in : Phys. Procedia 67 (2015) 1074-1082 Elsevier Open Access article: PDF;
In : 25th International Cryogenic Conference & International Cryogenic Materials Conference 2014, Twente U., Enschede, The Netherlands, 07 - 11 Jul 2014, pp.1074-1082
8.
Some Ideas Towards Energy Optimization at CERN / Burckhart, Helfried (CERN) ; Burnet, Jean-Paul (CERN) ; Caspers, Fritz (CERN) ; Doré, Vincent (CERN) ; Gatignon, Laurent (CERN) ; Martel, Christophe (CERN) ; Nonis, Mauro (CERN) ; Tommasini, Davide (CERN)
The paper presents the efforts of CERN to optimize its energy usage. Work is proceeding in 3 areas: accelerators, campus and infrastructure, and re-use of thermal “waste” energy. [...]
2013 - 3 p. - Published in : (2013) , pp. THPFI050 Fulltext: PDF; External link: Published version from JACoW
In : 4th International Particle Accelerator Conference, Shanghai, China, 12 - 17 May 2013, pp.3400
9.
Optimization of the Energy Usage at CERN / Burckhart, H J (CERN) ; Burnet, J P (CERN) ; Caspers, F (CERN) ; Doré, V (CERN) ; Gatignon, L (CERN) ; Martel, C (CERN) ; Nonis, M (CERN) ; Tommasini, D (CERN)
Some of the efforts of CERN to optimize its energy usage are presented. Work is proceeding in several areas: campus and infrastructure, accelerators and beam lines, as well as R&D; for future accelerators. [...]
CERN-ACC-2013-0182.- Geneva : CERN, 2013 - 3 p. Fulltext: PDF;
In : 4th International Particle Accelerator Conference, Shanghai, China, 12 - 17 May 2013, pp.3400
10.
EN-CV during LS1: upgrade, consolidation, maintenance, operation / Nonis, M (CERN)
The Cooling and Ventilation (CV) Group in the Engineering Department (EN) will be heavily involved in several projects and activities during the long shutdown in 2013 and 2014 (LS1) within a timeframe limited to around twelve months. According to the requests received so far, most projects are related to the upgrade of users' equipment, consolidation work, and the construction of new plants. [...]
CERN, 2012 - 4 p. - Published in : 10.5170/CERN-2012-006.252 Published version from CERN: PDF; Slides: PDF;
In : Chamonix 2012 Workshop on LHC Performance, pp.252-255

CERN Document Server : 32 records found   1 - 10nextend  jump to record:
See also: similar author names
6 NONIS, M.
30 Nonis, M
4 Nonis, Mauro
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Haven't found what you were looking for? Try your search on other servers:
Nonis, M. in Amazon
Nonis, M. in CERN EDMS
Nonis, M. in CERN Intranet
Nonis, M. in CiteSeer
Nonis, M. in Google Books
Nonis, M. in Google Scholar
Nonis, M. in Google Web
Nonis, M. in IEC
Nonis, M. in IHS
Nonis, M. in INSPIRE
Nonis, M. in ISO
Nonis, M. in KISS Books/Journals
Nonis, M. in KISS Preprints
Nonis, M. in NEBIS
Nonis, M. in SLAC Library Catalog
Nonis, M. in Scirus