CERN Accelerating science

CERN Document Server 4 εγγραφές βρέθηκαν  Η έρευνα πήρε 0.87 δευτερόλεπτα. 
1.
The First Beam Recirculation and Beam Tuning in the Compact ERL at KEK / Sakanaka, Shogo ; Adachi, Masahiro ; Adachi, Shin-ichi ; Akemoto, Mitsuo ; Arakawa, Dai ; Asaoka, Seiji ; Enami, Kazuhiro ; Endo, Kuninori ; Fukuda, Shigeki ; Furuya, Takaaki et al.
Superconducting(SC)-linac-based light sources, which can produce ultra-brilliant photon beams in CW operation, are attracting worldwide attention. In KEK, we have been conducting R&D; efforts towards the energy-recovery-linac(ERL)-based light source* since 2006. [...]
CERN-ACC-2014-380.- 2014 - 4 p. - Published in : (2014) , pp. TUPP075 Fulltext: tupp075 - PDF; tupp075_2 - PDF; External link: JACoW server
In : 27th Linear Accelerator Conference, Geneva, Switzerland, 31 Aug - 5 Sep 2014, pp.TUPP075
2.
Induction Acceleration of a Single RF Bunch in the KEK PS / Takayama, Ken ; Arakawa, Dai ; Arakida, Yoshio ; Horioka, Kazuhiko ; Igarashi, Susumu ; Iwashita, Taiki ; Kawasaki, Atsushi ; Kishiro, Junichi ; Kono, Tadaaki ; Koseki, Kunio et al.
A single bunch trapped in an RF bucket was accelerated by induction devices from 500 MeV to 8GeV beyond transition energy in the KEK-PS. This is the first demonstration of induction acceleration in a high energy circular ring. [...]
2005 External link: Published version from JACoW
In : 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.1679
3.
Beam Diagnostics for the J-PARC Main Ring Synchrotron / Toyama, Takeshi ; Arakawa, Dai ; Hashimoto, Yoshinori ; Hayashi, Naoki ; Kishiro, Junichi ; Lee, Seishu ; Miura, Takako ; Muto, Suguru ; Toyokawa, Ryoji
Beam diagnostics: beam intensity monitors (DCCT, SCT, FCT, WCM), beam position monitors (ESM), beam loss monitors (proportional chamber, air ion chamber), beam profile monitors (secondary electron emission, gas-sheet) have been designed, tested, and will be installed for the Main Ring synchrotron of J-PARC (Japan Proton Accelerator Research Complex). This paper describes the basic design principle and specification of each monitor, with a stress on how to cope with high power beam (average circulation current of ~12 A) and low beam loss operation (less than 1 W/m except a collimator region). [...]
2005 External link: Published version from JACoW
In : 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.958
4.
Development of the Beam Diagnostics System for the J-PARC Rapid-Cycling Synchrotron / Hayashi, Naoki ; Arakawa, Dai ; Hiroki, Seiji ; Kishiro, Junichi ; Lee, Seishu ; Miura, Takako ; Teruyama, Yuzou ; Toyama, Takeshi ; Toyokawa, Ryoji
Development of the beam diagnostics system for the J-PARC (Japan Proton Accelerator Research Complex) Rapid-Cycling Synchrotron is described. The system consists of Beam Position Monitor (BPM), Beam Loss Monitor (BLM), Current monitors (DCCT, SCT, MCT, FCT, WCM), Tune meter system, 324MHz-BPM, Profile monitor, and Halo monitor. [...]
2005 External link: Published version from JACoW
In : 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.299

Δείτε ακόμη: παρόμοια ονόματα συγγραφέων
27 Arakawa, D
3 Arakawa, D A
Ενδιαφέρεστε να ενημερώνεστε για νέα αποτελέσματα σχετικά με το ερώτημα αυτό;
Δημιουργήστε ένα προσωπικό email alert ή εγγραφείτε στο RSS feed.
Δεν βρήκατε αυτό που αναζητούσατε; Δοκιμάστε την έρευνά σας σε άλλους servers:
Arakawa, Dai σε Amazon
Arakawa, Dai σε CERN EDMS
Arakawa, Dai σε CERN Intranet
Arakawa, Dai σε CiteSeer
Arakawa, Dai σε Google Books
Arakawa, Dai σε Google Scholar
Arakawa, Dai σε Google Web
Arakawa, Dai σε IEC
Arakawa, Dai σε IHS
Arakawa, Dai σε INSPIRE
Arakawa, Dai σε ISO
Arakawa, Dai σε KISS Books/Journals
Arakawa, Dai σε KISS Preprints
Arakawa, Dai σε NEBIS
Arakawa, Dai σε SLAC Library Catalog
Arakawa, Dai σε Scirus