CERN Accelerating science

CERN Document Server 56 Datensätze gefunden  1 - 10nächsteEnde  gehen zum Datensatz: Die Suche hat 0.67 Sekunden gedauert. 
1.
PLAN - from LS2 to RUN3-LS3 and outcomes from the first RUN3-LS3 PLAN exercise / Dos Santos Pedrosa, Fernando (CERN) ; Borglund, Ayla (CERN) ; Daudin, Benoit (CERN) ; Vergara Fernandez, Estrella (CERN) ; Tock, Jean-Philippe (CERN) ; Foraz, Katy (CERN) ; Bernardini, Marzia (CERN) ; Lanza Herrero, Rodrigo (CERN)
The CERN-wide coordination of the programmed stops requires a tool to centralize and collect all the activities at a macroscopic scale. It includes the activities foreseen during Long Shutdowns (LS) and Year End Technical Stops (YETS).The CERN tool named PLAN centralises all the activities foreseen by the Groups, to have a global strategic view, assessing priorities across CERN. [...]
2023 - Published in : JACoW IPAC 2023 (2023) TUPM074 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.TUPM074
2.
Questions and answers / Jones, Rhodri (speaker) (CERN) ; Jimenez, Jose Miguel (speaker) (CERN) ; Goddard, Brennan (speaker) (CERN) ; Foraz, Katy (speaker) (CERN) ; Meddahi, Malika (speaker) (CERN) ; Lamont, Mike (speaker) (CERN)
2023 - 853. A&T Sector; Accelerators and technology sector New Year 2023 External links: Talk details; Event details In : Accelerators and technology sector New Year 2023
3.
Processes and Tools to Manage CERN Programmed Stops Applied to the Second Long Shutdown of the Accelerator Complex / Vergara Fernandez, Estrella (CERN) ; Ansel, Antoine (CERN) ; Barberan Marin, Maria (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Hay, David (CERN) ; Jimenez, José (CERN) ; Mcfarlane, David (CERN) et al.
The preparation and follow-up of CERN accelerator complex programmed stops require clear processes and methodologies. The LHC and its Injectors were stopped in December 2018, to maintain, consolidate and upgrade the different equipment of the accelerator chain. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2048-2051 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2048-2051
4.
The Second Long Shutdown of the LHC and Its Injectors: Feedback from the Accelerator Coordination and Engineering Group / Perrot, Anne-Laure (CERN) ; Bernardini, Marzia (CERN) ; Chemli, Samy (CERN) ; Corso, Jean-Pierre (CERN) ; Coupard, Julie (CERN) ; Dos Santos Pedrosa, Fernando (CERN) ; Etheridge, John (CERN) ; Foraz, Katy (CERN) ; Grillot, Serge (CERN) ; Jimenez, José (CERN) et al.
The operation of the Large Hadron Collider (LHC) at CERN started in September 2008. Every 5 or 6 years, Long Shutdowns (LS) are programmed to execute time-intensive ordinary and extra-ordinary maintenance of the LHC and its injectors [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2052-2055 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2052-2055
5.
Questions and answers / Jones, Rhodri (speaker) (CERN) ; Jimenez, Jose Miguel (speaker) (CERN) ; Goddard, Brennan (speaker) (CERN) ; Foraz, Katy (speaker) (CERN) ; Meddahi, Malika (speaker) (CERN) ; Lamont, Mike (speaker) (CERN)
2022 - 1900. A&T Sector; Accelerators and technology sector New Year webcast 2022 External links: Talk details; Event details In : Accelerators and technology sector New Year webcast 2022
6.
Chapter 17: Technical infrastructure / Tavian, L (CERN) ; Battistin, M (CERN) ; Bertolasi, S (CERN) ; Bertone, C (CERN) ; Di Girolamo, B (CERN) ; Dos Santos, N (CERN) ; Foraz, K (CERN) ; Hakulinen, T (CERN) ; Mattelaer, P (CERN) ; Muffat, P (CERN) et al.
The HL-LHC technical infrastructure includes the civil engineering, the electrical distribution, the cooling & ventilation, the access & alarm system, the technical monitoring, the transport, the logistics, the storage, and the operational safety..
2020 - 28 p. - Published in : 10.23731/CYRM-2020-0010.295 Fulltext: PDF;
In : High-Luminosity Large Hadron Collider (HL-LHC): Technical design report, pp.295-322
7.
CERN Yellow Report Front Cover High-Luminosity Large Hadron Collider (HL-LHC): Technical design report / Aberle, O. ; Béjar Alonso, I (ed.) ; Brüning, O (ed.) ; Fessia, P (ed.) ; Rossi, L (ed.) ; Tavian, L (ed.) ; Zerlauth, M (ed.)
The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built [...]
CERN-2020-010. - Geneva : CERN, 2020. - 390 p. (CERN Yellow Reports: Monographs ; 10/2020)


ebook
8.
Schedule Evolution of the Linac4 Installation During the Lifetime of the Linac4 Project and Connection Forecast / Coupard, Julie (CERN) ; Berjillos, Aurelio (CERN) ; Corso, Jean-Pierre (CERN) ; Foraz, Katy (CERN) ; Nicquevert, Bertrand (CERN) ; Paulat, Emmanuel (CERN) ; Vretenar, Maurizio (CERN)
The new CERN linear accelerator Linac4 started the installation phase in 2010 after the delivery of the new building and tunnel by the civil engineering and was inaugurated six years later. It will be connected to the CERN accelerators chain and replace the current proton linear accelerator, Linac2, during the second long shut-down (LS2) of the Large Hadron Collider (LHC) in 2019. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF044
9.
New Coordination Tools to Prepare the Programmed Stops in the LHC and its Injectors / Chemli, Samy (CERN) ; Bernardini, Marzia (CERN) ; Birtwistle, Thomas (CERN) ; Bolognesi, Andrea (CERN) ; Brito de Palma, Bernardo (CERN) ; Bustamante, Sebastien (CERN) ; Coupard, Julie (CERN) ; Foraz, Katy (CERN) ; Kleszcz, Emil (CERN) ; Kotsolakos, Nikitas (CERN) et al.
The LHC and its Injectors are submitted to an overall lifecycle of three to four years of physics delivery to Experiments with a two-year long stop, also known as Long Shutdown (LS). The years of physics delivery are ended by a programmed stop for the immediate preventive and corrective maintenance, also known as (Extended)-Year-End Technical Stop - (E)YETS. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-MOPMF044 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.MOPMF044
10.
CERN Yellow Report Front Cover The Compact Linear Collider (CLIC) - 2018 Summary Report / Burrows, P.N. ; Catalan Lasheras, N. (ed.) ; Linssen, L. (ed.) ; Petrič, M. (ed.) ; Robson, A. (ed.) ; Schulte, D. (ed.) ; Sicking, E. (ed.) ; Stapnes, S. (ed.)
The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear $e^+e^−$ collider under development at CERN [...]
arXiv:1812.06018 ; CERN-2018-005-M ; CERN-2018-005 CERN-2018-005-M ; CERN-2018-005. - 2018-12-14 - 112. (CERN Yellow Reports: Monographs ; 2/2018)


Publication

CERN Document Server : 56 Datensätze gefunden   1 - 10nächsteEnde  gehen zum Datensatz:
Sehen Sie auch: ähnliche Autornamen
4 FORAZ, K.
4 Foraz, K.
23 Foraz, Katy
Sind Sie interessiert über neue Ergebnisse zu dieser Suchabfrage informiert zu werden?
Definieren Sie eine persönliche E-Mail-Benachrichtigung oder abonnieren Sie den RSS Feed.
Haben Sie nicht gefunden was Sie suchten? Versuchen Sie Ihre Suche auf anderen Servern:
Foraz, K in Amazon
Foraz, K in CERN EDMS
Foraz, K in CERN Intranet
Foraz, K in CiteSeer
Foraz, K in Google Books
Foraz, K in Google Scholar
Foraz, K in Google Web
Foraz, K in IEC
Foraz, K in IHS
Foraz, K in INSPIRE
Foraz, K in ISO
Foraz, K in KISS Books/Journals
Foraz, K in KISS Preprints
Foraz, K in NEBIS
Foraz, K in SLAC Library Catalog
Foraz, K in Scirus