Title Operational Availability of the SNS During Commissioning
Author(s) Dodson, George W ; Williams, Theodore L
Affiliation (ORNL/SNS, Oak Ridge, Tennessee)
Publication 2005
In: 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.2289
Subject category Accelerators and Storage Rings
Abstract The SNS Front End, Drift Tube Linac and most of the Coupled Cavity Linac have been operated during commissioning. Operating statistics were taken and used by system owners to target developments to improve accelerator availability. This progression will be shown along with the overall availability goals of the SNS and a RAM calculation showing the system and subsystem availability required to meet these goals.