Hlavná stránka > Safety Management for the Cryogenic System of Superconducting RF System |
Article | |
Title | Safety Management for the Cryogenic System of Superconducting RF System |
Author(s) | Kao, Sheau-Ping ; Chen Chien Rong ; Hsiao, Feng-Zone ; Wang, Jau-Ping |
Affiliation | (NSRRC, Hsinchu) |
Publication | 2005 |
In: | 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.832 |
Subject category | Accelerators and Storage Rings |
Abstract | The installation of the helium cryogenic system for the superconducting RF cavity and magnet were finished in the National Synchrotron Radiation Research Center (NSRRC) at the end of October 2002. The first phase of this program will be commissioned at the end of 2004. This was the first large scale cryogenic system in Taiwan. The major hazards to personnel are cryogenic burn and oxygen deficient. To avoid the injury of the operators and meet the requirements of local laws and regulations, some safety measures must be adopted. This paper will illustrate the methods of risk evaluation and the safety control programs taken at NSRRC to avoid and reduce the hazards from the cryogenic system of the superconducting RF cavity and magnet system. |