CERN Accelerating science

Article
Title Construction and Power Test of the Extraction Kicker Magnet for the Spallation Neutron Source Accumulator Ring
Author(s) Pai, Chien ; Hahn, Harald ; Hseuh Hsiao Chaun ; Meng, Wuzheng ; Mi, Jian-Lin ; Raparia, Deepak ; Sandberg, Jon ; Todd, Robert J ; Tsoupas, Nicholaos ; Tuozzolo, Joseph ; Warburton, David S ; Wei, Jie ; Weiss, Daniel ; Yung Lee, Yong ; Zhang, Wu
Affiliation (BNL, Upton, Long Island, New York)
Publication 2005
In: 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.3831
Subject category Accelerators and Storage Rings
Abstract Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated in BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 PFN power supplies have been built, tested and delivered to ORNL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TiN coating of the magnets, the installation procedure of the magnets and the full power test of the kicker with the PFN power supply.



 Element opprettet 2006-02-07, sist endret 2024-02-23