Abstract Large amount of beam monitors will be installed in J-PARC linac. Electrostatic computations are used to adjust the BPM cross-section parameters to obtain 50 &#8486; transmission lines. BPMs are designed to control the offset between quadrupole magnet and BPM electrical centers less than 0.1mm. We present a procedure of beam based calibration/alignment (BBC/BBA) method to confirm the displacement of linac BPMs. The fast current transformer (FCT) has response of relative bunch phase &lt;1%. To measure the beam energy at every accelerator tank and injection point of 3 GeV RCS, phase difference of FCT pairs are used, and 10<sup><font size="-1">-4



 Rekord stworzony 2006-01-31, ostatnia modyfikacja 2024-02-23


Link zewnętrzny:
Pobierz pełny tekst
Published version from JACoW