Physics beyond 10 34 (p. 1) |
by Sanda, I |
Status and Future Plans of the PEP-II B-Factory (p. 7) |
by Seeman, J T |
Commissioning Of The Kekb B-factory (p. 12) |
by Akai, K |
CESR performance and upgrade status (p. 17) |
by Henderson, S |
DA NE performance with the experimental detector (p. 24) |
by Zobov, M |
BEPC upgrades and Bejing Tau-Charm factory design (p. 31) |
by Wang, D |
Present activities at colliders of BINP (p. 37) |
by Nikitin, S |
Running LEP at 100 GeV (p. 45) |
by Cornelis, K |
The ARES cavity for KEKB (p. 49) |
by Kageyama, T |
Commissioning of the SC cavities for KEKB (p. 55) |
by Furuya, T |
Bunch Lengthening (p. 59) |
by Greenwald, Z |
Performance Of The Upgraded Injector Linac For Kekb (p. 64) |
by Ogawa, Y |
Beam conditioning in the CESR Arc and IR regions (p. 70) |
by Li, Y |
Characteristics of KEKB vacuum system (p. 79) |
by Suetsugu, Y |
PEP-II LER Nonlinear vacuum pressure increase with current (p. 83) |
by Heifets, S |
The Kekb Bunch Oscillation Recorder (p. 101) |
by Kikutani, E |
Single and multibunch dynamics study during the DA NE main ring commissioning (p. 105) |
by Gallo, A |
Beam diagnostics and correction at CESR (p. 114) |
by Henderson, S |
Bunch-by-bunch feedback systems for KEKB rings (p. 120) |
by Tobiyama, M |
Beam instrumentation for commissioning PEP-II with BaBar (p. 124) |
by Fisher, A |
Beam position monitor system for KEKB (p. 131) |
by Tejima, M |
A Design Of Synchrotron Radiation Monitor For Kek B-factory (p. 134) |
by Mitsuhashi, T |
Beam coupling impedance measurements of the DA NE vacuum chamber components (p. 139) |
by Marcellini, F |
DA NE Injection kicker: Electromagnetic analysis of trapped modes and damping antenna design (p. 146) |
by Alesini, D |
Experience With Multibunch Beam Stability At Pep-II (p. 160) |
by Minty, Michiko G |
Normal-form approach for 1-D beam-beam interaction (p. 167) |
by Xu, G |
Possible coherent beam-beam instability of the head-tail type (p. 171) |
by Perevedentsev, E A |
Effect of linearized beam-beam interaction on radiation emittance (p. 178) |
by Perevedentsev, E A |
Beam-beam interactions in DA NE: numerical simulation and experimental results (p. 181) |
by Boscolo, M |
Simulation Of The Beam-beam Effect In Kekb (p. 187) |
by Ohmi, K |
Round colliding beam activities at BINP (p. 202) |
by Perevedentsev, E A |
Installation And Alignment Of Kekb Magnets (p. 213) |
by Sugahara, R |
The performance of the superconducting magnet system in the KEKB interaction region (p. 217) |
by Ohuchi, N |
Construction of special quadrupole magnets for KEKB interaction region (p. 221) |
by Tawada, M |
Beam background in the BELLE detector (p. 237) |
by Haba, J |
Calculation of pressure profiles in the CESR hardbend and IR regions (p. 242) |
by Li, Y |
Main features of DA NE optics (p. 248) |
by Guiducci, S |
Correction of optical functions in the KEKB rings (p. 253) |
by Koiso, H |
Optics Correction In Kekb Commissioning (p. 256) |
by Ohnishi, Y |
Model independent analysis and its application at the KEKB injector Linac (p. 261) |
by Xiao, A |
The PEP-II interaction region with the BaBar solenoid (p. 264) |
by Sullivan, M |
Beam-based solenoid compensation for the PEP-II (p. 267) |
by Cai, Y |
Optimization of specific luminosity in CESR (p. 271) |
by Rice, D |
Beam-beam performance and luminosity optimization at KEKB (p. 276) |
by Funakoshi, Y |
Very high luminosity collider at Cornell (p. 283) |
by Rice, D |
Factories beyond today's sensitivity frontier (p. 289) |
by Tigner, M |
Beam-Beam experience at the PEP-II B-factory (no pagination) |
by Kozanecki, Witold |
A mini-TPC for SLAC PEP-II commissioning |
by Cizeron, R |
Experimental Investigations of the Electron Cloud Key Parameters |
by Anashin, V V |
Vacuum Stability for Ion Induced Gas Desorption |
by Collins, I R |
Beam Lifetime and Beam Tails in LEP |
by Burkhardt, H |