CERN Accelerating science

Conference
Report number KEK-Proceedings-99-24
Conference title International Workshop on Performance Improvement of Electron-Positron Collider Particle Factories
Related conference title(s) e+e- Factories '99
Date(s), location 21 - 24 Sep 1999, Tsukuba, Japan
Editor(s) Akai, K (ed.)
Imprint Tsukuba : KEK, 2000
Subject category Accelerators and Storage Rings
Free keywords CESR ; KEKB ; beam physics

Corresponding record in: KEK
Contributions in Inspire: C99-09-21.1
To loan this literature, see Library holdings in the CERN Library Catalogue website.

External link:
Download fulltext
Fulltext from KEK

Contributions to this conference in CDS

Physics beyond 10 34 (p. 1)
by Sanda, I
Status and Future Plans of the PEP-II B-Factory (p. 7)
by Seeman, J T
Commissioning Of The Kekb B-factory (p. 12)
by Akai, K
CESR performance and upgrade status (p. 17)
by Henderson, S
DA NE performance with the experimental detector (p. 24)
by Zobov, M
BEPC upgrades and Bejing Tau-Charm factory design (p. 31)
by Wang, D
Present activities at colliders of BINP (p. 37)
by Nikitin, S
Running LEP at 100 GeV (p. 45)
by Cornelis, K
The ARES cavity for KEKB (p. 49)
by Kageyama, T
Commissioning of the SC cavities for KEKB (p. 55)
by Furuya, T
Bunch Lengthening (p. 59)
by Greenwald, Z
Performance Of The Upgraded Injector Linac For Kekb (p. 64)
by Ogawa, Y
Beam conditioning in the CESR Arc and IR regions (p. 70)
by Li, Y
Characteristics of KEKB vacuum system (p. 79)
by Suetsugu, Y
PEP-II LER Nonlinear vacuum pressure increase with current (p. 83)
by Heifets, S
The Kekb Bunch Oscillation Recorder (p. 101)
by Kikutani, E
Single and multibunch dynamics study during the DA NE main ring commissioning (p. 105)
by Gallo, A
Beam diagnostics and correction at CESR (p. 114)
by Henderson, S
Bunch-by-bunch feedback systems for KEKB rings (p. 120)
by Tobiyama, M
Beam instrumentation for commissioning PEP-II with BaBar (p. 124)
by Fisher, A
Beam position monitor system for KEKB (p. 131)
by Tejima, M
A Design Of Synchrotron Radiation Monitor For Kek B-factory (p. 134)
by Mitsuhashi, T
Beam coupling impedance measurements of the DA NE vacuum chamber components (p. 139)
by Marcellini, F
DA NE Injection kicker: Electromagnetic analysis of trapped modes and damping antenna design (p. 146)
by Alesini, D
Experience With Multibunch Beam Stability At Pep-II (p. 160)
by Minty, Michiko G
Normal-form approach for 1-D beam-beam interaction (p. 167)
by Xu, G
Possible coherent beam-beam instability of the head-tail type (p. 171)
by Perevedentsev, E A
Effect of linearized beam-beam interaction on radiation emittance (p. 178)
by Perevedentsev, E A
Beam-beam interactions in DA NE: numerical simulation and experimental results (p. 181)
by Boscolo, M
Simulation Of The Beam-beam Effect In Kekb (p. 187)
by Ohmi, K
Round colliding beam activities at BINP (p. 202)
by Perevedentsev, E A
Installation And Alignment Of Kekb Magnets (p. 213)
by Sugahara, R
The performance of the superconducting magnet system in the KEKB interaction region (p. 217)
by Ohuchi, N
Construction of special quadrupole magnets for KEKB interaction region (p. 221)
by Tawada, M
Beam background in the BELLE detector (p. 237)
by Haba, J
Calculation of pressure profiles in the CESR hardbend and IR regions (p. 242)
by Li, Y
Main features of DA NE optics (p. 248)
by Guiducci, S
Correction of optical functions in the KEKB rings (p. 253)
by Koiso, H
Optics Correction In Kekb Commissioning (p. 256)
by Ohnishi, Y
Model independent analysis and its application at the KEKB injector Linac (p. 261)
by Xiao, A
The PEP-II interaction region with the BaBar solenoid (p. 264)
by Sullivan, M
Beam-based solenoid compensation for the PEP-II (p. 267)
by Cai, Y
Optimization of specific luminosity in CESR (p. 271)
by Rice, D
Beam-beam performance and luminosity optimization at KEKB (p. 276)
by Funakoshi, Y
Very high luminosity collider at Cornell (p. 283)
by Rice, D
Factories beyond today's sensitivity frontier (p. 289)
by Tigner, M
Beam-Beam experience at the PEP-II B-factory (no pagination)
by Kozanecki, Witold
A mini-TPC for SLAC PEP-II commissioning
by Cizeron, R
Experimental Investigations of the Electron Cloud Key Parameters
by Anashin, V V
Vacuum Stability for Ion Induced Gas Desorption
by Collins, I R
Beam Lifetime and Beam Tails in LEP
by Burkhardt, H

Show contributions in CDS



 Record created 2000-11-10, last modified 2021-07-30


External link:
Download fulltext
Fulltext from KEK