CERN Accelerating science

Article
Title Chapter 18: Beam Instrumentation and Diagnostics
Author(s) Bravin, E (CERN) ; Jones, R (CERN) ; Lefevre, T (CERN) ; Veness, R (CERN)
Publication 2024
Number of pages 19
In: Adv. Ser. Direct. High Energy Phys. 31 (2024) 407-425
In: The High Luminosity Large Hadron Collider, pp.407-425
DOI 10.1142/9789811278952_0018
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment CERN LHC
Project CERN HL-LHC
Abstract The extensive array of beam instrumentation with which the LHC is equippedhas played a major role in its commissioning, rapid intensity ramp-up and safeand reliable operation. Much of this equipment will need consolidation by thetime the LHC enters the High Luminosity (HL) era while the upgrade itselfbrings a number of new challenges that are currently being addressed.Installation of a completely new final focus system in the two high-luminosity LHC insertions implies the development of new beam positionmonitors to equip the upgraded quadrupole magnets. In addition to replacingthe current directive stripline beam position monitors, which allow indepen-dent measurement of both beams in a single aperture, eight additional beamposition monitors will be added per interaction region, to further improve beamcontrol at the collision point.
Copyright/License © 2024-2025 The Editor(s) (License: CC-BY-NC-4.0)

Corresponding record in: Inspire


 Record created 2024-08-02, last modified 2024-08-15


Fulltext:
Download fulltext
PDF