Accueil > Multimedia & Outreach > Photos > OPEN Photos > Compilation of latest progress on the installation of the HL-LHC IT String in SM18 |
OPEN Photos / Open / Accelerators | OPEN-PHO-ACCEL-2021-015 |
Compilation of latest progress on the installation of the HL-LHC IT String in SM18
|
|
---|---|
This photo collection shows the works that have been carried out in recent months at SM18 (CERN). These include, in addition to cleaning and painting, the removal of the old crane and the installation of a new one, the refurbishment of the Control Room, the installation of the racks for the electronics and the installation of the metallic structure where the string equipment will be located.
|
|
Total images: 33
|
|