CERN Accelerating science

Article
Title Assembly and Pre-Loading Specifications for the Series Production of the Nb$_3$Sn MQXFA Quadrupole Magnets for the HL-LHC
Author(s) Ferracin, P (LBL, Berkeley) ; Ambrosio, G (Fermilab) ; Cheng, D W (LBL, Berkeley) ; Ferradas Troitino, J (CERN) ; Garcia Fajardo, L (LBL, Berkeley) ; Izquierdo Bermudez, S (CERN) ; Prestemon, S (LBL, Berkeley) ; Ray, K L (LBL, Berkeley) ; Solis, M J (LBL, Berkeley) ; Todesco, E (CERN) ; Vallone, G (LBL, Berkeley)
Publication 2022
Number of pages 6
In: IEEE Trans. Appl. Supercond. 32 (2022) 4000306
In: 27th International Conference on Magnet Technology (MT-27), Fukuoka, Japan, 15 - 19 Nov 2021, pp.4000306
DOI 10.1109/TASC.2022.3148971
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment CERN LHC
Project CERN HL-LHC
Abstract The High Luminosity LHC (HL-LHC) Project is planning to install 16 cold-masses made with Nb3Sn quadrupole magnets in the LHC Interaction Regions to significantly increase its luminosity. Half of these cold masses are fabricated at BNL, FNAL, and LBNL under the US Accelerator Research Program (AUP). Each cold mass includes two identical Nb3Sn quadrupole magnets, called MQXFA with a magnetic length of 4.2 m. Currently, the AUP project has completed the fabrication and test of the first 5 pre-series magnets, and is working on the following 16 magnets for the series production. The brittleness and strain sensitivity of the Nb3Sn superconducting material requires a careful definition of the allowable maximum stress in the windings during magnet assembly and pre-load, and a tight control of their variation within the whole coil length. Therefore, a series of assembly and pre-load specifications have been defined with the goals of minimizing the risk of conductor degradation and providing the mechanical support required to reach the nominal current during powering. In this paper we present the specifications defined for the MQXFA magnets and applied during the different assembly phases and during the pre-load process of the first 5 pre-series magnets.
Copyright/License U.S. Government work not protected by U.S. copyright

Corresponding record in: Inspire


 Record created 2022-04-07, last modified 2023-03-29