ホーム > Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
Preprint | |
Report number | CERN-ACC-2021-013 |
Title | Conclusion of the Electrical Conformity Assessment Panel on the Installation of the MBH Magnet S2 in the LHC |
Author(s) | Siemko, Andrzej (CERN) ; Devred, Arnaud (CERN) ; Rodriguez Mateos, Felix (CERN) ; Schmidt, Rudiger (GSI - Helmholtzzentrum fur Schwerionenforschung GmbH (DE)) ; Verweij, Arjan (CERN) ; Wenninger, Jorg (CERN) |
Publication | 2021 |
Imprint | 01 Mar 2021 |
Number of pages | 26 |
Subject category | Accelerators and Storage Rings |
Accelerator/Facility, Experiment | CERN LHC |
Project | CERN HL-LHC |
Keywords | 11T Nb3Sn magnet |
Abstract | In this report we assess the feasibility for installation of the $Nb_{3}$Sn MBH S2 magnet in the LHC and conclude on possible performance limitations. |
Submitted by | [email protected] |