CERN Accelerating science

CMS Note
Report number arXiv:2111.00304 ; CMS-CR-2021-215
Title Electronics integration for the GE2/1 and ME0 GEM detector systems for the CMS phase-2 muon system upgrade
Author(s) Butalla, Stephen D. (Florida Inst. Tech.) ; Hohlmann, Marcus (Florida Inst. Tech.)
Collaboration CMS Collaboration
Publication 2022-05-06
Imprint 19 Oct 2021
Number of pages 8
Note 6 pages, 6 figures, submitted to the proceedings of the Topical Workshop on Electronics for Particle Physics (TWEPP2021)
In: JINST 17, 05 (2022) pp.C05002
In: TWEPP 2021 Topical Workshop on Electronics for Particle Physics, Online, Online, 20 - 24 Sep 2021, pp.C05002
DOI 10.1088/1748-0221/17/05/C05002
Subject category Detectors and Experimental Techniques
Accelerator/Facility, Experiment CERN LHC ; CMS
Abstract The Large Hadron Collider is currently undergoing its High Luminosity upgrade, which is set to increase the instantaneous luminosity by about a factor of five. Consequently, the Compact Muon Solenoid experiment is upgrading its muon spectrometer to cope with the increased muon flux in the forward region. The GE2/1 triple-Gas Electron Multiplier detector, which has recently entered the mass production phase, and the ME0 triple-GEM detector system, which is in the late prototyping phase, are undergoing electronics integration. These proceedings briefly discuss the frontend electronics for the GE2/1 and ME0 detector systems, the electronics integration testing process, and the future plans for the frontend electronics of these two detector systems by the CMS GEM Collaboration.
Copyright/License preprint: (License: arXiv nonexclusive-distrib 1.0)



Corresponding record in: Inspire


 レコード 生成: 2021-12-13, 最終変更: 2023-01-31


フルテキスト:
CR2021_215 - Download fulltextPDF
2111.00304 - Download fulltextPDF