CERN Accelerating science

If you experience any problem watching the video, click the download button below
Download Embed
Internal Note
Report number CERN-ATS-Note-2011-126 PERF
Title HiRadMat High Intensity Beam Commissioning
Author(s) Blanco Sancho, J (CERN) ; Conan, N (CERN) ; Cornelis, K (CERN) ; Goddard, B (CERN) ; Hessler, C (CERN) ; Jensen, L (CERN) ; Kain, V (CERN) ; Meddahi, M (CERN) ; Theis, C (CERN) ; Vincke, H (CERN) ; Vojtyla, P (CERN) ; Wenninger, J (CERN)
Corporate author(s) CERN. Geneva. ATS Department
Publication 2011
Imprint 25 Nov 2011
Number of pages 11
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment CERN SPS
HiRadMat
Keywords HiRadMat ; Primary beam line ; high intensity beam commissioning
Abstract On Wednesday 14 September and Monday 19 September 2011, high intensity proton beam was sent for the first time down the HiRadMat primary beam line (thereafter TT66), onto the beam dump located in the HiRadMat experimental cavern. This high intensity beam commissioning followed a first period of low intensity beam commissioning which took place in June 2011. During the low intensity beam commissioning, it was checked that all beam line equipment operated as specified. Energy matching and beam steering were performed; optics checks did not reveal any optical errors. Aperture measurements confirmed that there were no bottlenecks. Radiation protection monitoring worked as expected and the measurements were within expectation [1]. With the completion of the HiRadMat ventilation system, the high intensity beam commissioning could successfully continue in September 2011. The main outcome is reported in this note.
Submitted by [email protected]

 


 Record creato 2011-12-05, modificato l'ultima volta il 2016-06-29


Testo completo:
Scarica documento
PDF