MasterSeal 940
MasterSeal 940
MasterSeal 940
MasterSeal® 940
Internally and externally placed PVC Waterstops
1. Company profile
2. Commercial Licenses
4. Technical datasheet
5. Method statement
6. Job references
7. Approvals
8. Test reports
1. Company profile
About MBCC Group
The MBCC Group is one of the leading suppliers of construction
chemicals and solutions worldwide and has emerged from the
carve-out of the former BASF Construction Chemicals business
from BASF Group. We offer innovative and sustainable
products and solutions for the construction industry across
different sectors, such as buildings, structures, underground
construction, new construction, as well as for renovation. Our
strong brands Master Builders Solutions®, PCI®, Thermotek®,
Wolman®, Colorbiotics® and Watson Bowman Acme® are
well established in the marketplace. With our innovations, we
address sustainability challenges in the industry. MBCC Group
consists of approximately 70 legal entities worldwide and is
home to around 7,500 construction experts in over 60 countries.
A brand of
Master Builders Solutions for the Construction Industry
MasterAir® MasterFlow® MasterRoc®
Complete Solutions for air Solutions for precision grouting Solutions for underground
entrained concrete construction
MasterGlenium®
MasterBrace® Hyperplasticizer formulated from MasterSeal®
Solutions for strengthening and state-of-the-art polymers for the Solutions for waterproofing
structural adhesives ultimate performance and sealing
MasterFlame® MasterRheobuild®
Passive fire protection system Superplasticizer for concrete
International Accreditation
Master Builders Solutions Construction Chemicals LLC is a registered
GCC manufacturer certified to the ISO 9001 Quality Management
System and ISO 14001 Environmental Management System
A brand of
2. Commercial Licenses
رخصة صناعية
Industrial License
تفاصيل الرخصة License Details /
License No. 511017 رقم الرخصة
Legal Type )Limited Liability Company(LLC ذات مسئولية محدودة الشكل القانونى
Expiry Date 21/03/2024 تاريخ النتهاء Issue Date 22/03/1999 تاريخ الصدار
® D&B D-U-N-S 366717796 الرقم العالمي Main License No. 511017 رقم الرخصة الم
No.
Register No. 52538 رقم السجل التجارى DCCI No. 53865 عضوية الغرفة
مدير Manager / الردن Jordan / سعد مهند محمد سعيد صباح 1005787
SAAD MOHANNAD MOHD SAID
SABBAH
مصنع ملك مجمع دبي للستثمار -بردبي -مجمع دبي للستثمار الولى
Print Date 27/03/2023 7:41 تاريخ الطباعة Receipt No. 14918961 رقم اليصال
يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة ،أرسل رقم الرخصة إلى ) 6969دو/اتصالت( للحصول
على اذن الدفع. Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message (SMS). Send your trade year
license number to 6969 (Du/ Etisalat) to receive payment voucher. احصل على زوهو ون مجانا ت
للسنة الولى
Zoho.com/det
وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي .لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
ملحق الشركاء
Partners
License Details / تفاصيل الرخصة
Print Date 27/03/2023 7:41 تاريخ الطباعة Receipt No. 14918961 رقم اليصال
اتصالت( للحصول/ )دو6969 أرسل رقم الرخصة إلى،يمكنك الن تجديد رخصتك التجارية من خلل الرسائل النصية القصيرة
.على اذن الدفع Get FREE access to
Zoho One for the first
Now you can renew your trade license by sending a text message (SMS). Send your trade year
license number to 6969 (Du/ Etisalat) to receive payment voucher. احصل على زوهو ون مجانا ت
للسنة الولى
Zoho.com/det
لمراجعة صحة البيانات الواردة في الرخصة يرجي مسح رمزالستجابة السريعة. وثيقة إلكترونية معتمدة وصادرة بدون توقيع من دائرة القتصاد والسياحة في دبي
this is a certified e-document issued without signature by the department of Economy and Tourism .Kindly Scan the QR Code to
Verify the certificate
Master Builders Solutions Construction Chemicals LLC
P.O. Box 37127, Dubai Investment Park 1, Jebel Ali, Dubai, UAE DATE : FEBRUARY 6, 2024
Ref: LD-11253-SN
In May 2023, Sika closed the acquisition of MBCC Group, a leading global supplier of
construction chemicals. As a part of MBCC to Sika integration as one company, all Master
Builders Solutions products in our portfolio is rebranded to Sika® branding.
Only the branding will change, the highly appreciated MBCC products will continue to be
offered under the new branding.
Hence you can see rebranded product names on certain documents, like invoices, delivery
notes, Product Data Sheets, Safety Data Sheets, and any official communications in the
following format as an example “Sika XXX, formerly Known as MasterSeal XXX”.
If you need more information, please feel free to communicate with our sales team to discuss
further. We thank you for understanding and valuable support.
Sincerely,
Sharooq Nasser
Key Accounts Distribufion Manager
Master Builders Solutions Construction Chemicals LLC م.م.ذ.ﻣﺎﺳﺗر ﺑﯾﻠدرز ﺳوﻟﯾوﺷﻧز ﻛوﻧﺳﺗرﻛﺷن ﻛﯾﻣﯾﻛﺎﻟز ش Legal Headquarter: Trostberg
PO Box 37127, Dubai, ، دﺑﻲ،٣٧١٢٧ ب.ص District Court:
United Arab Emirates اﻹﻣﺎرات اﻟﻌرﺑﯾﺔ اﻟﻣﺗﺣدة Traunstein, HRB 10261,
Tel: +971 48090800 +٩٧١٤٨٠٩٠٨٠٠ : ﺗﻠﯾﻔون Ust.-IdNr. DE204803343
mbcc.sika.com mbcc.sika.com
3. ISO Certificates - Quality,
Environment & Safety Certificates
CERTIFICATE
The Certification Body
of TÜV SÜD Management Service GmbH
certifies that
ISO 14001:2015
are fulfilled.
The certificate is valid in conjunction
with the main certificate from 2021-10-10 until 2024-10-09.
Certificate Registration No.: 12 104 60146/079 TMS.
ISO 9001:2015
are fulfilled.
The certificate is valid in conjunction
with the main certificate from 2021-09-15 until 2024-09-13.
Certificate Registration No.: 12 100 60146/079 TMS.
An economic construction /
contraction joint profile specifically
for use in kicker and contraction
Special Profile joints in small structures such as
MasterSeal 940
Construction / water tanks cast in-situ manholes,
200M ICJ/E
Contraction Joints channels etc. where there are no o eyelet
expansion joints and wall, or slab
thicknesses do not exceed
200mm.Includes an eyeleted flange
IEJ, ICJ available in standard sizes of 150 mm, 200 mm, 250 mm, 320 mm and special size of 350 mm
(made-to-order)
EEJ, ECJ available in standard sizes of 150 mm, 200 mm & 250 mm
MasterSeal® 940
WATERSTOP SELECTION INSTALLATION
MasterSeal 940 PVC Waterstops are designed MasterSeal 940 ICJ & IEJ profiles must be
for use within the performance parameters installed so they are securely held in the correct
indicated under the headings Profiles and position whilst the concrete is poured. The
Typical Properties. concrete must be fully and properly compacted
around the waterstops (the use of Master
Internally placed profiles Builders Solutions Rheodynamic admixtures to
(MasterSeal 940 ICJ & IEJ) are usually located produce self compacting concrete is of great
midway in the slab or wall thickness across the advantage to avoid voids or porous areas after
joints in concrete structures. They will equally concrete placing). Where reinforcement is
prevent the passage of water through the joint present, an adequate clearance must be left
from either face. between this and all waterstops to permit proper
They are particularly suited to water retaining compaction of the concrete.
structures and in walls and slabs where
pressure differential may occur such as in The eyelets in the reinforced flanges of the
reservoir walls. They are equally appropriate for MasterSeal 940 ICJ & IEJ profiles allow them to
joints in suspended slabs, vertical wall joints and be wired to the surrounding reinforcing steel.
lift joints. The eyelets are an integral part of the profiles
and being placed outside the outer valves
Externally placed profiles cannot create a water path around the profile or
(MasterSeal 940 ECJ & EEJ) are of particular impair the efficiency in performance in any way.
advantage for their ease of installation in
basement and foundation applications in See typical detail below.
situations where they are firmly supported
against back pressure, i.e. in water retaining
structures (base slab) where they are placed on
the blinding concrete.
MBS_CC-UAE/Sl_940_06/v10/04_19/v11_11_19/v12/09_21
The technical information and application advice given in this Master Builders Solutions publication are based on
STATEMENT OF the present state of our best scientific and practical knowledge. As the information herein is of a general nature, no
RESPONSIBILITY assumption can be made as to a product's suitability for a particular use or application and no warranty as to its
accuracy, reliability or completeness either expressed or implied is given other than those required by law. The user
is responsible for checking the suitability of products for their intended use.
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders
NOTE Solutions either orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since
they, and not Master Builders Solutions, are responsible for carrying out procedures appropriate to a specific
application.
1. INSTALLATION:
1.1. MasterSeal 940 ICJ & IEJ profiles must be installed so they are securely held in the correct
position whilst the concrete is poured.
1.2. The concrete must be fully and properly compacted around the waterstops.
1.3. Adequate clearance must be left between reinforcing steel and waterstops to allow proper
compaction of concrete.
1.4. MasterSeal 940 ECJ & EEJ has pre-punched eyelets in the flanges/wings of the profiles to
allow them to be wired to the surrounding reinforcing steel.
1.5. MasterSeal 940 ECJ & EEJ profiles when used on ground slab blinding concrete, where a
permanent, firm and stable support is given usually require no fastening. The profile is simply
laid centrally over the line of the joint to be formed. Fixing to vertical shuttering is simplified
by nailing with small or headless nails through the outer flange/wings to keep it in place.
2. EQUIPMENT:
2.1. Electric heater blades are used to join waterstop connection by direct contact, heat fusion.
Optionally, jointing jigs can be fabricated with channels that would fit the ribs of the waterstop,
for gripping and to aide with the welding process.
3. JOINT CONNECTIONS:
3.1. Reliable jointing of MasterSeal 940 waterstops can be carried out rapidly onsite with a proper
heat welding equipment and cutting tools. This comprises of electric heater blades, welding
jigs (if available), utility knife and straight rule.
3.2. For easier and more reliable welding intersections of MasterSeal 940, pre-fabricated
intersection joints are available for all profiles. Please see product data sheet for more details.
4. JOINT WELDING:
4.1. Clean the electric heater blade, plug it into the correct voltage electricity supply and leave in
a safe position to warm up.
4.2. Ensure that the ends of the waterstop to be jointed are of the same width and profile then
align the two edge together and position them for welding. Use a straight rule and sharp utility
knife to cut and align the edges of waterstops. Consider an extra few millimeters of waterstop
during measurement and cutting since the length will reduce while melting.
Page - 1
MS - CC - MasterSeal 940 - 05/2019
4.3. Once fully heated, position the heater blade between the two edge of waterstops. Press both
waterstops against the plain surface of heater blade to allow proper and balanced melting of
the waterstop. The waterstop should melt without burning or charring, allowing a bead of
molten PVC with approximately 3mm in diameter appears along either side of the heater
blade.
4.4. Slide the heater blade away leaving the molten PVC on the edge of the waterstops, then
immediately join the two ends together, pressing the molten PVC against the joint.
4.5. Support the connection for few minutes and allow to cool down until it stiffens and gain
strength. Any minor defects/small gaps can be touched up by melting the PVC using an
industrial hot air blower.
4.6. In case of minor shortage in length due to misalignment, wrong cutting and/or defective
welding, causing the waterstop edges not to meet/touch, cut the existing waterstop to keep
the gap at least 300m and rejoin them with a new cut piece of waterstop with sufficient length.
4.7. Clean the heater blades while still hot using emery paper or wire brush.
STATEMENT OF RESPONSIBILITY
The technical information and application advice given in this Master Builders Solutions publication are based on the present state of
our best scientific and practical knowledge. As the information herein is of a general nature, no assumption can be made as to a
product's suitability for a particular use or application and no warranty as to its accuracy, reliability or completeness either expressed
or implied is given other than those required by law. The user is responsible for checking the suitability of products for their intended
use.
NOTE
Field service where provided does not constitute supervisory responsibility. Suggestions made by Master Builders Solutions either
orally or in writing may be followed, modified or rejected by the owner, engineer or contractor since they, and not Master Builders
Solutions, are responsible for carrying out procedures appropriate to a specific application.
Page - 2
6. Job references
International Job References – MasterSeal 940
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2019/09 DEIRA CITY CENTRE MALL REDEVELOPMENT DUTCO CONSTRUCTION CO. LLC GHD UAE
2019/08 LAYYAH COMBINED CYCLE POWER PLANT ARABIAN CONSTRUCTION COMPANY UAE
DHE MALL ACCESS INFRASTRUCTION AND UMM SUQEIM STREET CHINA STATE CONST CONSTRUCTION HALCROW INTERNATIONAL
2019/06 UAE
UPGRADE ENGR CORP PARTNERSHIP
DAR AL-HANDASAH
2019/05 CONSTRUCTION OF DRAGON CITY MIXED USE COMPLEX ALI MOOSA AND SONS CONTRACTING UAE
CONSULTANTS
2019/04 ABU DHABI FUTURE SCHOOL PROGRAM PHASE 8 COMBINED GROUP CONTRACTING CO. ALTORATH INTERNATIONAL UAE
ARAB MARINE ACADEMY KHORFAKKAN BRANCH ON PLOT NO. 35 AT M/s. UNITED ENGINEERING
2019/03 ARCHITECTS & ENGINEERS UAE
AL JARADYA AREA KHORFAKKAN -SHARJAH CONSTRUCTION CO. (UNEC) LLC
International Job References – MasterSeal 940
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
THE ESTATE: G+1 VILLAS AND TOWNHOUSES AT AL FURJAN, JEBEL TECHNICAL ARCHITECT CONTRACTING ARKIPLAN CONSULTING
2018/11 UAE
ALI FIRST, DUBAI, UAE LLC ARCHITECTS AND ENGINEERS
RESIDENTIAL TOWER (2B+G+5P+36 RES. FLOORS) ON PLOT NO. C18 DEWAN ARCHITECTS +
2018/11 ARABIAN CONSTRUCTION COMPANY UAE
AND C18A SECTOR RT2 AT REEM ISLAND, ABU DHABI, UAE ENGINEERS
2018/11 RAK MANGROVE HOTEL - RAS AL KHAIMAH, UAE CHIEF CONTRACTING SA ENGINEERING CONSULTANT UAE
ANANTARA ECO RESORT ON PLOT NO. 5015 AREA 601, RAS AL PERKINS EASTMAN
2018/11 AL NUAIMI GROUP LLC UAE
KHAIMAH - UAE INTERNATIONAL
ANANTARA ECO RESORT ON PLOT NO. 5015 AREA 601, RAS AL PERKINS EASTMAN
2018/10 AL NUAIMI GROUP LLC UAE
KHAIMAH - UAE INTERNATIONAL
JEBEL ALI REFINERY EXPANSION, JEBEL ALI FREE ZONE, DUBAI, TECHNIP ITALY (EPC) / ARABIAN
2018/09 KELLOGG BROWN & ROOT (KBR) UAE
UAE CONSTRUCTION COMPANY
ITINERA S.P.A ABU DHABI - GHANTOOT
REEM MALL ON SECTOR RR1, PLOT NO. C5 AT AL REEM ISLAND, DEWAN ARCHITECTS AND
2018/09 TRANSPORT & GENERAL CONTRACTING UAE
ABU DHABI, UAE ENGINEERS
EST JV
HALIBA FIELD DEVELOPMENT PROJECT COMBINED CONCEPT AND
2018/09 LARSEN & TOUBRO TECHNIP UAE
FEED - AL DHAFRA, ABU DHABI, UAE
ROYAL PEARL DEVELOPMENT PHASE 1 (CLUSTERS A, B & C) ON CHINA CONSTRUCTION EIGHTH
CONIN - INCORPORATED
2018/09 PLOT NOS. 6184116 & 6184086 AT NADD AL SHIBA FIRST, DUBAI, ENGINEERING DIVISION CORPORATION UAE
CONSULTANTS
UAE LIMITED
DEIRA WATERFRONT DEVELOPMENT - PHASE 1 PLOT 11 (02 NOS.
2018/03 HOTEL & BUILDING (B), OFFICE AND STORAGE BUILDING (C) DUBAI, DUBAI CIVIL ENGINEERING AE7 CONSULTANTS UAE
UAE
360 DEGREES ARCHITECTURAL
2018/03 PROJECT: 9 BUILDING PROJECT, AL MEYDAN, DUBAI, UAE PROGRESS CONSTRUCTION UAE
DESIGN CONSULTANCY LLC
AL MUTAHIDAH TOWERS VB27 & V28, THE PEARL QATAR, THE VIVA GULF ENGINEERING INDUSTRIAL
2017/08 AL HABTOOR LEIGHTON GROUP QATAR
BAHRIYA PRECINT DP/38 CONSULTANCY
PROPOSED CONSTRUCTION OF MIXED-USE DEVELOPMENT
BUILDING (B+G+38 FLOORS) ON PLOT NO. 3460255 AND MULTI- UNITED ENGINEERING CONSTRUCTION ARKITEKNIK INTERNATIONAL
2017/08 UAE
STOREY CAR PARK BUILDING (G+9 FLOORS) ON PLOT NO. 3460253 (UNEC) CONSULTING ENGINEERS
AT BUSINESS BAY, DUBAI, UAE
International Job References – MasterSeal 940
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
THE HEART OF EUROPE ST. PETERSBURG ISLAND VILLAS (102
SEAHORSES VILLAS + 7 FACILITY BLOCK (G+1) + 2 TYPICAL ACE INTERNATIONAL
2017/07 JK BAUEN BUILDING CONTRACTING LLC UAE
SUBSTATIONS + SWIMMING POOL) AT THE WORLD ISLANDS, DUBAI, CONSULTING ENGR
UAE
THE ONE - JBR RESIDENTIAL TOWER (PROPOSED 2B+G+P+43 WSP CONSULTANT / L+B DESIGN
2017/05 DUBAI CONTRACTING COMPANY LLC UAE
STOREY) ON PLOT NO. 3920552 AT JBR, MARSA - DUBAI, UAE GROUP
MISMAK - NAJMAT ABU DHABI - RESIDENTIAL AND COMMERCIAL
2017/05 COMPLEX AND MOSQUE PLOTS RR2-C10-C11 & P-2, ABU DHABI, SEIDCO GENERAL CONTRACTING CO. GA ARCHITECTS & ENGINEERS UAE
UAE
R-1070-PORT VIEWS RESIDENTIAL DEVELOPMENT (B+G+6) ON PLOT
2017/04 DUBCO CONSTRUCTION LLC AK DESIGN UAE
NO. 3212144 AT MADINAT DUBAI AL MELAHIYA, DUBAI, UAE
CONTRACO HEAD OFFICE BUILDING (2B+G+M+3F) AT ECQ-D-25, ARAB ENGINEERING BUREAU
2017/04 CONTRACO WLL QATAR
ENERGY CITY QATAR QATAR (AEB)
3B+G+3+R FLOORS OFFICE BUILDING (MASTERCARD) PLOT NO. DEWAN ARCHITECTS &
2017/02 NARESCO CONTRACTING LLC UAE
A009-004 AT TECOM SITE A, DUBAI, UAE ENGINEERS
CONSTRUCTION OF AL FATTAN DOWN TOWN ON PLOT NO. 3340109
2017/01 ALI MOOSA & SONS CONTRACTING AE7 CONSULTANTS UAE
PACKAGE 2 BUILDING WORKS AT AL SATWA, DUBAI, UAE
PROJECT: 5117105 - VVIP VILLA AT AL MINA PALACE (B+G+1+ROOF) WS ATKINS & PARTNERS
2016/12 ARABTEC CONSTRUCTION LLC UAE
- ABU DHABI, UAE OVERSEAS
PROJECT: 5117105 - VVIP VILLA AT AL MINA PALACE (B+G+1+ROOF) WS ATKINS & PARTNERS
2016/09 ARABTEC CONSTRUCTION LLC UAE
- ABU DHABI, UAE OVERSEAS
PROPOSED 5B+SERVICE+CONCOURSE+8 STOREY COMMERCIAL LACASA ARCHITECTS &
2016/08 KHANSAHEB CIVIL ENGINEERING LLC UAE
DEVELOPMENT ON PLOT NO. GV-02 - DIFC, DUBAI, UAE ENGINEERING CONSULTANT
O-11655 MAIN SEWERAGE SERVICES FOR JEBEL HAFEET, AL AIN, PARSONS INTERNATIONAL
2016/07 GULF CONTRACTORS CO. UAE
UAE LIMITED
PPS 1 - BARAKAH NUCLEAR POWER PLANT PROJECT ABU DHABI, EMIRATES NUCLEAR ENERGY
2016/06 ARABIAN CONSTRUCTION COMPANY UAE
UAE CORPORATION
KUWAIT NATIONAL PETROLEUM COMPANY (K.S.C) CLEAN FUELS
KUWAIT NATIONAL PETROLEUM
2016/02 PROJECT (0-6798-Z-3100-001), MAA REFINERY BROWN FIELD AREA JGC / GS / SK JOINT VENTURE KUWAIT
COMPANY (K.S.C)
WORKS, KUWAIT
International Job References – MasterSeal 940
DATE PROJECT CONTRACTOR CONSULTANT COUNTRY
2015/08 THE ATRIA ON PLOT NO. BB.A05.001 AT BUSINESS BAY, DUBAI, UAE AL ROSTAMANI PEGEL LLC AK DESIGN UAE
2015/04 MALL OF THE EMIRATES EXPANSION PROJECT - DUBAI, UAE KHANSAHEB CIVIL ENGINEERING LLC. HOLFORD ASSOCIATES UAE
2012/01 SHERATON PARK PROJECT DOHA, QATAR QDVC ARUP QATAR QATAR
7. Approvals
Capital Gate, 6th Floor, Khaleej Arabi Street (30)
PO Box 989, Abu Dhabi, UAE
Tel: +971 (0)2 499 9999 Web: www.etihadrail.ae
Attached Documents:
Distribution:
Acknowledgement of Receipt:
Doc.
No. Section/ Page/ Part No. Comments By Code Response By Status
Rev.
1 Manufacturers recommendation to be strictly followed AA OIK 2 Noted & Strictly will follow the manufacturers recommendation. ZM CLOSED
Noted & Approved drawing no. C0306-DMB-ECB-DS-01016 attached (Please refer to
2 Approved Shop drawings showing the location of specific waterstop to be submitted AA OIK 2 GT CLOSED
section 14.1 attachment no.01)
4 Provide test certificates for each delivery AA OIK 2 Noted, Test certificates will be provided each consignment of material delivery. ZM CLOSED
Based on the approved laboratory test reports the updated compliance statement
In the compliance statement, hardness test performed 23 degree however test report
5 AB FK 2 from M/s BASF (Manufacturer) attached, Plaese refer to section 14.1, attachement GT CLOSED
attached from laboratory shows 25 degree, clarify it
no.03.
Disclaimer: The review and the comments made herewith are incomplete and the PMC/ER reserve the right to add/change comments made here once all the documents related to and impacting on the document reviewed
herewith are submitted and reviewed. This includes but is not limited to : Interface definition, scope of work, requirement capture and links into DOORS/CP2 to ensure traceability of requirements, PHA requirements
incorporation, capital cost estimate, Value engineering, stakeholder liaison and NOCs.
00000-UAE-GDM-WX-00003 Rev.02
LAYYAH COMBINED CYCLE POWER PLANT
DOCUMENT TRANSMITTAL
Dear Sir,
We submit herewith the following documents/drawings for the purpose mentioned below and we kindly, require you to send us
your feedback required actions if any.
Package : 220
Released : For Information
Depart. : Quality
Discipline : Civil
Valid By : Abdelnasser
5002220 Material Submittal 00 20/08/2019 General For Information Approved • Samples required (width 250 mm) with fixation
UZT for Waterstop 14:38:57 With accessories. • Material warranty certificate to be
&CDA010 MasterSeal 940 Comments submitted as per project specs. • Fixation and site
500559 (alternate supplier) joining / Splicing should be as per manufacturer
written documents • All intersection shall be
factory made only.
Ahmed Arafa
Engineering Manager
El Sewedy Power
Enclosed:
Remarks:
Distribution:
Flooring Local,Waterproofing,Flooring
Product: Merchandise,Concrete Repairs & :اﻟﻤﻨﺘﺞ
Carbon Fibre Strengthening,Admixtures
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
وﺛﯿﻘﺔ اﻟﺘﺴﺠﯿﻞ
Registration Document
Notes:All products models are evaluated depends on the submitted third party test reports
QAD-2021.0174.01-CM
This is an electronic Document and does not require stamp ھذه اﻟوﺛﯾﻘﺔ ﺻدرت اﻟﻛﺗروﻧﯾﺎ وﻻ ﺗﺣﺗﺎج ﺧﺗم
Visit our website to verify this Document: :ﻟﻠﺗﺎﻛد ﻣن ﺻﺣﺔ ھذه اﻟوﺛﯾﻘﺔ ﯾرﺟﻲ زﯾﺎرة اﻟﻣوﻗﻊ اﻻﻟﻛﺗروﻧﻲ
https://jawdah.qcc.abudhabi.ae/en/pages/homepage.aspx https://jawdah.qcc.abudhabi.ae/en/Pages/homepage.aspx
Any changes or modification on this Document will affect its validity أي ﻛﺷط أو ﺗﻐﯾﯾر ﻓﻲ ھذه اﻟوﺛﯾﻘﺔ ﯾﻠﻐﯾﮭﺎ
Master Builders Solutions
Construction Chemicals LLC
Manufacturing Location
Recycled Content
Master Builders Solutions Construction Chemicals LLC certifies that the VOC of MasterSeal® 940 is
< 5 g/l
The packaging materials used for MasterSeal® 940 are recyclable where recycling facilities exist.
Regional Material
100% (by weight) of raw materials for MasterSeal® 940 is extracted, harvested or recovered
as well as manufactured within 500 miles (800 km) of our factory in the United Arab Emirates.
Asbestos containing material (ACM), Formaldehyde content and Heavy metal content
Respectfully,