DPR 02-07-2022
DPR 02-07-2022
DPR 02-07-2022
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi A 15 3.118
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi LTC 1 4.206
RE Panel Camp-
12.01(a)i 01/Jul/22 215800 A 90 3.118
Casting Nandi
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi B 11 1.738
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi STC 4 2.683
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi NHAI 1 3.118
RE Panel Camp-
12.01(a)i 01/Jul/22 Casting 215800 Nandi A 19 3.118
Drain Raft
8.04(b) 01/Jul/22 (M-30) 212530 212550 SR LHS 1 20.0
Retaining
12.02(b)(i) 01/Jul/22 wall PCC 206480 206500 MCW RHS 1 20.0
(M-10)
Excavatio
n for Toe
12.02(a)i 01/Jul/22 190090 190110 LHS 1 20.0
Retaining
wall
Toe
12.02(b)(i) 01/Jul/22 Retaining 190090 190110 LHS 1 20.0
wall PCC
(M-10)
Retaining
wall 1st
12.02(b)(ii) 01/Jul/22 Lift RCC 216648 216670 SR RHS 1 22.00
(M-30)
Retainig
Wall 1st
Lift RCC
NB 01/Jul/22 (M-30) 216218 216238 SR RHS 1
boom
pressure
Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall 1st 206870 206893 RHS 1 23.00
lift RCC
(M-30)
Toe
Retainig
Wall Raft
NB 01/Jul/22 RCC (M- 206870 206893 RHS 1
30) boom
pressure
Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall raft 206953 206965 SR RHS 1 12.00
RCC (M-
30)
Toe
Retaining
12.02(b)(ii) 01/Jul/22 wall raft 206953 206965 SR RHS 1 12.00
RCC (M-
30)
Retaining
wall 1st
12.02(b)(ii) 01/Jul/22 Lift RCC 208340 208350 MCW RHS 1 10.00
(M-30)
Clearing
1.01 01/Jul/22 and 190400 190760 MCW+SR LHS 1 0.0001 360.0
grubbing
Excavator
/ jcb Used
DeDi1 01/Jul/22 in Hourly 190400 190760 MCW+SR LHS
Basis
Clearing
1.01 01/Jul/22 and 190420 190620 MCW+SR RHS 1 0.0001 200.0
grubbing
Excavator
/ jcb Used
DeDi1 01/Jul/22 in Hourly 190400 190760 MCW+SR LHS
Basis
Recording
NB 01/Jul/22 of OGL 190670 190780 LHS 110.0
Layout of
Toe
NB 01/Jul/22 Retaining 206250 206270 MCW RHS 20.0
Wall for
PCC
Layout of
Toe
NB 01/Jul/22 Retaining 206480 206500 MCW RHS 20.0
Wall for
PCC
Chainage
NB 01/Jul/22 209200 209600 MCW BHS 400.0
Marking
Checking
Of
NB 01/Jul/22 Cordinate 190090 190140 RHS 50.0
on Test
Piles
New Jursy
Crash
9.05 02/Jul/22 Barrier M 216450 RHS 13 26.0
2 OM Praksh
OM Praksh
OM Praksh
OM Praksh
2 Deepak
Deepak
Deepak
2 OM Praksh
OM Praksh
OM Praksh
OM Praksh
OM Praksh
OM Praksh
OM Praksh
2 OM Praksh
OM Praksh
OM Praksh
OM Praksh
OM Praksh