Ofertas y Demandas Con Ecorrentia Ejercicio

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 12

AREA= 0.00050019 KM2= 500.

19 m2

MES DIAS P. total CN S Ia PRECIP. EFEC.


Junio 30 96.07 94 16.21 3.243 79.025
Julio 31 91.07 94 16.21 3.243 74.141
Agosto 31 71.65 94 16.21 3.243 55.301
Septiembre 30 24.26 86 41.35 8.270 4.459
Octubre 31 3.19 73 93.95 18.789 3.106
Noviembre 30 0.76 73 93.95 18.789 4.282
Diciembre 31 1.37 73 93.95 18.789 3.965
Enero 31 3.88 73 93.95 18.789 2.812
Febrero 28 8.92 73 93.95 18.789 1.158
Marzo 31 27.09 86 41.35 8.270 5.887
Abril 30 39.73 86 41.35 8.270 13.594
Mayo 31 72.28 94 16.21 3.243 55.908
P.Neta INF. VOL. (m3)
79.025 17.045 3.95277E-05
74.141 16.929 3.70847E-05
55.301 16.349 2.7661E-05
4.459 19.801 2.23046E-06
3.106 0.084 1.55351E-06
0.000 0.000 0
0.000 0.000 0
2.812 1.068 1.40672E-06
1.158 7.762 5.79445E-07
5.887 21.203 2.9445E-06
13.594 26.136 6.79944E-06
55.908 16.372 2.79646E-05
AREA= 0.00050019 KM2 500.19 m2

MES DIAS P. total CN S Ia PRECIP. EFEC.


Enero 31 3.88 94 16.21 3.243 0.024
Febrero 28 8.92 94 16.21 3.243 1.473
Marzo 31 27.09 94 16.21 3.243 14.196
Abril 30 39.73 86 41.35 8.270 13.594
Mayo 31 72.28 73 93.95 18.789 19.407
Junio 30 96.07 73 93.95 18.789 34.880
Julio 31 91.07 73 93.95 18.789 31.430
Agosto 31 71.65 73 93.95 18.789 19.034
Septiembre 30 24.26 73 93.95 18.789 0.301
Octubre 31 3.19 86 41.35 8.270 0.711
Noviembre 30 0.76 86 41.35 8.270 1.667
Diciembre 31 1.37 94 16.21 3.243 0.245

BALANCE
DEMANDA
MES DIAS Lt/seg
Junio 30 1.46
Julio 31 3.75
Agosto 31 10.27
Septiembre 30 16.62
Octubre 31 28.69
Noviembre 30 23.91
Diciembre 31 19.87
Enero 31 4.49
Febrero 28 0.84
Marzo 31 3.88
Abril 30 3.05
Mayo 31 1.85

OFERTA (m3/mes) DEMANDA(m3/mes)


MES DIAS PARCIAL ACUMULADO PARCIAL ACUMULADO
Enero 31 0.00904646 0.0090464624 12026.016 12026.016
Febrero 28 0.55239843 0.5614448898 2032.128 14058.144
Marzo 31 5.32557854 5.8870234341 10392.192 24450.336
Abril 30 5.09958275 10.986606182 7905.6 32355.936
Mayo 31 7.28036262 18.266968798 4955.04 37310.976
Junio 30 13.0849222 31.351890988 3784.32 41095.296
Julio 31 11.7908386 43.14272961 10044 51139.296
Agosto 31 7.14039193 50.283121538 27507.168 78646.464
Septiembre 30 0.11294478 50.39606632 43079.04 121725.504
Octubre 31 0.26689935 50.662965667 76843.296 198568.8
Noviembre 30 0 50.662965667 61974.72 260543.52
Diciembre 31 0.09172949 50.754695161 53219.808 313763.328
sumatoria 365 50.7546952 313763.328

Analisis
DETERMINACION DEL VOLUMEN UTIL

DEMANDA: RIEGO (ABRO) +ABREVADERO

PARCIAL
Mes N° de dias OFERTA DEMANDA
Qm(m3/mes) Qm(Hm3/mes) Qm(m3/mes)
Enero 31 0.01 0.0000 12026.016
Febrero 28 0.55 0.0000 2032.128
Marzo 31 5.33 0.0000 10392.192
Abril 30 5.10 0.0000 7905.6
Mayo 31 7.28 0.0000 4955.04
Junio 30 13.08 0.0000 3784.32
Julio 31 11.79 0.0000 10044
Agosto 31 7.14 0.0000 27507.168
Septiembre 30 0.11 0.0000 43079.04
Octubre 31 0.27 0.0000 76843.296
Noviembre 30 0.00 0.0000 61974.72
Diciembre 31 0.09 0.0000 53219.808
Anual 365 Σx(m3/mes)= 50.75 Σx(Hm3/mes)= 0.0001 Σy(m3/mes)=

1ra consideracion:
Σx(Hm3/mes) ≥ Σy(Hm3/mes)
0.00 ≥ 0.313763 FALSE
OFERTA DEMANDA
DADO QUE LA ∑OFERTA >∑OFERTA, PERO QUE LA DIFERENCIA EN LOS MESES DE ABRIL, MAYO, JUNIO, JULIO ,AGOSTO, SEPTIE
Y OCTUBRE SON NEGATIVAS, ES POSIBLE EL DESARROLLO DE UNA PRESA

POR LO TANTO:
VOLUMEN UTIL= 0.089330 Hm3
VOLUMEN UTIL= 89330.15854 m3

Porcentaje de azolves 10 %
Porcentaje de reserva 5%

Volumen de azolves 8933.01585 m3


Volumen de reserva 4466.50793 m3
Volumen Util 89330.1585 m3
P.Neta INF. VOL. (m3) VOL (HM3) Q(LT/SEG)
0.024 3.856 0.01206195 1.20619E-08 4.50342E-06
1.473 7.447 0.73653124 7.36531E-07 0.00030445
14.196 12.894 7.10077139 7.10077E-06 0.00265112
13.594 26.136 6.79944366 6.79944E-06 0.00262324
19.407 52.873 9.70715016 9.70715E-06 0.00362423
34.880 61.190 17.4465629 1.74466E-05 0.00673093
31.430 59.640 15.7211182 1.57211E-05 0.00586959
19.034 52.616 9.52052257 9.52052E-06 0.00355456
0.301 23.959 0.15059304 1.50593E-07 5.80992E-05
0.711 2.479 0.3558658 3.55866E-07 0.00013287
0.000 0.000 0 0 0
0.245 1.125 0.12230599 1.22306E-07 4.56638E-05
DIFERENCIA
DEMANDA parcial
Qm(m3/mes) Qm(Hm3/mes) m3/mes Hm3/mes
0.01202602 -12026.01 -0.012026
0.00203213 -2031.58 -0.002032
0.01039219 -10386.87 -0.010387
0.00790560 -7900.50 -0.00790
0.00495504 -4947.76 -0.00495
0.089330
0.00378432 -3771.24 -0.00377
0.01004400 -10032.21 -0.01003
0.02750717 -27500.03 -0.02750
0.04307904 -43078.93 -0.04308
0.07684330 -76843.03 -0.07684
0.06197472 -61974.72 -0.061975
0.05321981 -53219.72 -0.053220
313763.3 Σy(Hm3/mes)= 0.313763

UNIO, JULIO ,AGOSTO, SEPTIEMBRE


curvas carateristicas

Cota Area [m2] Alturas [m] Volumen[m3]


Nro
m.s.n.m. Acum Acumulada Parcial Acum. Parcial Acumulada
1 2930.55 0 0 0 0 0 0
2 2931.55 12.45 12.45 1 1 6.225 6.225
3 2932.55 46.56 59.01 1 2 29.505 35.73
4 2933.55 122.99 182 1 3 84.775 120.505
5 2934.55 225 407 1 4 173.995 294.5
6 2935.55 318 725 1 5 271.5 566
7 2936.55 608 1333 1 6 463 1029
8 2937.55 1011 2344 1 7 809.5 1838.5
9 2938.55 1618 3962 1 8 1314.5 3153
10 2939.55 2260 6222 1 9 1939 5092
11 2940.55 2960 9182 1 10 2610 7702
12 2941.55 3755 12937 1 11 3357.5 11059.5
13 2942.55 4538 17475 1 12 4146.5 15206
14 2943.55 5330 22805 1 13 4934 20140
15 2944.55 6131 28936 1 14 5730.5 25870.5
16 2945.55 6950 35886 1 15 6540.5 32411
17 2946.55 7739 43625 1 16 7344.5 39755.5
18 2947.55 8523 52148 1 17 8131 47886.5
19 2948.55 9332 61480 1 18 8927.5 56814
20 2949.55 10173 71653 1 19 9752.5 66566.5
21 2950.55 111168 182821 1 20 60670.5 127237
22 2951.55 12292 195113 1 21 61730 188967
23 2952.55 13487 208600 1 22 12889.5 201856.5
24 2953.55 14608 223208 1 23 14047.5 215904
25 2954.55 15668 238876 1 24 15138 231042
26 2955.55 16768 255644 1 25 16218 247260
27 2956.55 17917 273561 1 26 17342.5 264602.5
28 2957.55 20810.1525 294371.153 1 27 19363.5763 283966.076

volmen de azolves 8933.01585 m3 cota altura volumen


volmen de azolves 0.00893302 hm3 2940.55 10 0.00764632
2941.549 10.999 0.00893302
2941.55 11 0.01099595

volmen de reserva 13399.5238 m3 cota altura volumen


volmen de reserva 0.01339952 hm3 2941.55 11 0.01099595
2942.549 11.999 0.01339952
2942.55 12 0.01513628

volmen de util 102729.682 m3 cota altura volumen


volmen de util 0.10272968 hm3 2949.55 19 0.06646976
2950.541 19.991 0.10272968
2950.55 20 0.11812644

Volumen de la altura 19.991

VOLUMEN DE EVAPORACION
Ve= Evap(meses con escorrenti * area del espejo * 1/1000
Ve 35.4073449 mm * 5543.924 m2 * 0.001
VE 0.0001963 hm3

VOLUMEN DE LA INFILTRACION

K= 0,047 cm/s = 0.00047 cuerpo de presa


H 19.991
L 15.993069 Q=KiA
Hf 0.8 altura de fundacion
V. Inf= 0.00047 m3
V.inf= 4.7E-10
volmen de infiltracion 0.00047 m3 cota altura volumen
volmen de util 0.10272968 hm3 0 0 0.06646976
0.000 0.000 0.10272968
0 0 0.11812644

volumen de avenidas maximas Q = C x L x H^3/2

Q= 35 m3/s
c= 2
L= 15
H= 1.11
Vol Acum metodo trapecios
[Hm3] Parcial Acumulada [Hm3]
0 0 0 0
6.225E-06 4.15 4 0.00000415
0.00003573 27.6954595 32 0.00003185
### 81.7410253 114 0.00011359
0.0002945 171.447095 285 0.00028503
0.000566 270.162773 555 0.0005552
0.001029 455.236332 1,010 0.00101043
0.0018385 801.006803 1,811 0.00181144
0.003153 1302.66106 3,114 0.0031141
0.005092 1930.08158 5,044 0.00504418
0.007702 2602.14204 7,646 0.00764632
0.0110595 3349.62887 10,996 0.01099595
0.015206 4140.3255 15,136 0.01513628
0.02014 4928.69432 20,065 0.02006497
0.0258705 5725.82919 25,791 0.0257908
0.032411 6536.22268 32,327 0.03232702
0.0397555 7340.96578 39,668 0.03966799
0.0478865 8127.84841 47,796 0.04779584
0.056814 8924.44382 56,720 0.05672028
0.0665665 9749.4768 66,470 0.06646976
0.127237 51656.6787 118,126 0.11812644
0.188967 53475.2968 171,602 0.17160174
0.2018565 12884.8813 184,487 0.18448662
0.215904 14043.7712 198,530 0.19853039
0.231042 15134.9064 213,665 0.21366529
0.24726 16214.8904 229,880 0.22988018
0.2646025 17339.3272 247,220 0.24721951
0.28396608 19345.5397 266,565 0.26656505
= 196.295629 m3

También podría gustarte