Jump to content

Edit filter log

Details for log entry 35896003

10:03, 12 September 2023: Nwaiotbaw (talk | contribs) triggered filter 833, performing the action "edit" on Line 8 (Shenzhen Metro). Actions taken: none; Filter description: Newer user possibly adding unreferenced or improperly referenced material (examine | diff)

Changes made in edit

{{Short description|Metro line in Shenzhen, China}}
{{Short description|Metro line in Shenzhen, China}}
{{Infobox rail line
{{Infobox rail line
|name =
| name =
| logo = ShenzhenMetroLine8.svg
| logo = ShenzhenMetroLine8.svg
| logo_width = 100px
| logo_width = 100px
| color = {{rcr|SZM|8}}
| color = {{rcr|SZM|8}}
| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}})
| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}})
| image = 深外高中站_月台.jpg
| image = 深外高中站_月台.jpg
| image_width =
| image_width =
| image_alt =
| image_alt =
| caption = [[Shenwai Senior Campus station]]
| caption = [[Shenwai Senior Campus station]]
| type = [[Rapid transit]]
| type = [[Rapid transit]]
| system = [[Shenzhen Metro]]
| system = [[Shenzhen Metro]]
| status = Operational
| status = Operational
| locale = [[Shenzhen]], [[People's Republic of China|China]]
| locale = [[Shenzhen]], [[People's Republic of China|China]]
| start = {{stn|Liantang||Shenzhen Metro}}
| start = {{stn|Chiwan}}
| end = {{stn|Yantian Road}}
| end = {{stn|Yantian Road}}
| stations = 7
| stations = 7
| routes =
| routes =
| daily_ridership =
| daily_ridership =
| close =
| close =
| owner =
| owner =
| operator = SZMC (Shenzhen Metro Group)
| operator = SZMC (Shenzhen Metro Group)
| character = Underground
| character = Underground
| depot = Wangji Lake stabling yard
| depot = Wangji Lake stabling yard
| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A)
| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A)
| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref>
| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref>
| tracklength =
| tracklength =
| tracks = [[Double-track railway|Double-track]]
| tracks = [[Double-track railway|Double-track]]
| gauge = {{RailGauge|sg|allk=on}}
| gauge = {{RailGauge|sg|allk=on}}
| electrification = {{1,500 V DC}} ([[Overhead lines]])
| electrification = {{1,500 V DC}} ([[Overhead lines]])
| speed = {{cvt|80|km/h}}
| speed = {{cvt|80|km/h}}
| signalling = Urbalis 888 [[CBTC]] [[Moving block]]
| signalling = Urbalis 888 [[CBTC]] [[Moving block]]
| elevation =
| elevation =
| website =
| website =
| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}}
| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}}
| map_state = collapsed
| map_state = collapsed
| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>}}
| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>
}}


'''Line 8''' of the [[Shenzhen Metro]] (also known as the Yantian line) is an East-West line from [[Liantang station (Shenzhen Metro)|Liantang]] to {{stl|SZM|Yantian Road}}. It opened on 28 October 2020. Line 8 has a length of {{convert|12.367|km|mi|1|abbr=on}} and a total of 7 stations.<ref name=sznews201908 /> Line 8 is the first line to serve [[Yantian District]]. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.
'''Line 8''' of the [[Shenzhen Metro]] (also known as the Yantian line) is an East-West line from [[Liantang station (Shenzhen Metro)|Liantang]] to {{stl|SZM|Yantian Road}}. It opened on 28 October 2020. Line 8 has a length of {{convert|12.367|km|mi|1|abbr=on}} and a total of 7 stations.<ref name=sznews201908 /> Line 8 is the first line to serve [[Yantian District]]. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station.

Action parameters

VariableValue
Edit count of the user (user_editcount)
388
Name of the user account (user_name)
'Nwaiotbaw'
Age of the user account (user_age)
44180586
Groups (including implicit) the user is in (user_groups)
[ 0 => '*', 1 => 'user', 2 => 'autoconfirmed' ]
Rights that the user has (user_rights)
[ 0 => 'createaccount', 1 => 'read', 2 => 'edit', 3 => 'createtalk', 4 => 'writeapi', 5 => 'viewmyprivateinfo', 6 => 'editmyprivateinfo', 7 => 'editmyoptions', 8 => 'abusefilter-log-detail', 9 => 'urlshortener-create-url', 10 => 'centralauth-merge', 11 => 'abusefilter-view', 12 => 'abusefilter-log', 13 => 'vipsscaler-test', 14 => 'collectionsaveasuserpage', 15 => 'reupload-own', 16 => 'move-rootuserpages', 17 => 'createpage', 18 => 'minoredit', 19 => 'editmyusercss', 20 => 'editmyuserjson', 21 => 'editmyuserjs', 22 => 'purge', 23 => 'sendemail', 24 => 'applychangetags', 25 => 'viewmywatchlist', 26 => 'editmywatchlist', 27 => 'spamblacklistlog', 28 => 'mwoauthmanagemygrants', 29 => 'reupload', 30 => 'upload', 31 => 'move', 32 => 'autoconfirmed', 33 => 'editsemiprotected', 34 => 'skipcaptcha', 35 => 'ipinfo', 36 => 'ipinfo-view-basic', 37 => 'transcode-reset', 38 => 'transcode-status', 39 => 'createpagemainns', 40 => 'movestable', 41 => 'autoreview' ]
Whether the user is editing from mobile app (user_app)
false
Whether or not a user is editing through the mobile interface (user_mobile)
false
Page ID (page_id)
41718440
Page namespace (page_namespace)
0
Page title without namespace (page_title)
'Line 8 (Shenzhen Metro)'
Full page title (page_prefixedtitle)
'Line 8 (Shenzhen Metro)'
Edit protection level of the page (page_restrictions_edit)
[]
Page age in seconds (page_age)
304076174
Action (action)
'edit'
Edit summary/reason (summary)
''
Old content model (old_content_model)
'wikitext'
New content model (new_content_model)
'wikitext'
Old page wikitext, before the edit (old_wikitext)
'{{Short description|Metro line in Shenzhen, China}} {{Infobox rail line |name = | logo = ShenzhenMetroLine8.svg | logo_width = 100px | color = {{rcr|SZM|8}} | mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}}) | image = 深外高中站_月台.jpg | image_width = | image_alt = | caption = [[Shenwai Senior Campus station]] | type = [[Rapid transit]] | system = [[Shenzhen Metro]] | status = Operational | locale = [[Shenzhen]], [[People's Republic of China|China]] | start = {{stn|Liantang||Shenzhen Metro}} | end = {{stn|Yantian Road}} | stations = 7 | routes = | daily_ridership = | close = | owner = | operator = SZMC (Shenzhen Metro Group) | character = Underground | depot = Wangji Lake stabling yard | stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A) | linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref> | tracklength = | tracks = [[Double-track railway|Double-track]] | gauge = {{RailGauge|sg|allk=on}} | electrification = {{1,500 V DC}} ([[Overhead lines]]) | speed = {{cvt|80|km/h}} | signalling = Urbalis 888 [[CBTC]] [[Moving block]] | elevation = | website = | map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}} | map_state = collapsed | open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>}} '''Line 8''' of the [[Shenzhen Metro]] (also known as the Yantian line) is an East-West line from [[Liantang station (Shenzhen Metro)|Liantang]] to {{stl|SZM|Yantian Road}}. It opened on 28 October 2020. Line 8 has a length of {{convert|12.367|km|mi|1|abbr=on}} and a total of 7 stations.<ref name=sznews201908 /> Line 8 is the first line to serve [[Yantian District]]. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station. ==Timeline== {| class="wikitable" style="border-collapse: collapse; text-align: right;" !Segment!!Commencement!!Length!!Station(s)!!Name |- |style="text-align: left;"| Liantang — Yantian Road | 28 October 2020 | {{convert|12.367|km|mi|2|abbr=on}} | 7 |style="text-align: left;"| Phase 1 |} ==Service routes== * {{stl|SZM|Chiwan}} — {{stl|SZM|Yantian Road}} * {{stl|SZM|Wanxia}} — {{stl|SZM|Liantang}} (Working days peak hours only) ==Stations== {| class="wikitable" ! rowspan="2" colspan="2" | Service<br />routes ! colspan="2" | Station name ! rowspan="2" | Connections ! rowspan="2" | Nearby bus stops ! colspan="2" rowspan="2" | Distance<br />{{small|km}} ! rowspan="2" | Location |- ! {{small|English}} ! {{small|Chinese}} |- style = "background:#{{rcr|SZM|2}}; height: 2pt" | colspan = "9" | |- |align="center"|●||align="center"| |{{stl|SZM|Chiwan}} |{{large|{{lang|zh-cn|赤湾}}}} |{{rint|shenzhen|5}} |{{small|79 80 B945 M489 N4 N8}} |0.00 |0.00 |rowspan=13|[[Nanshan District, Shenzhen|Nanshan]] |- |align="center"|●||align="center"| |{{stl|SZM|Shekou Port}} |{{large|{{lang|zh-cn|蛇口港}}}} | |{{small|22 70 79 80 113 122 204 226 233 328 331 332 K105 K113 K204 M371 M400 M409 M430 M448 N4 N8}} |1.85 |1.85 |- |align="center"|●||align="center"| |{{stl|SZM|Sea World}} |{{large|{{lang|zh-cn|海上世界}}}} |{{rint|shenzhen|12}} |{{small|37 122 204 226 233 328 331 332 B816 K105 K113 K204 M371 M400 M409 M430 M448 M493 M519 N4 N4区间 Airport 10(机场10) Q-H 8(前海行8)}} |1.10 |2.95 |- |align="center"|●||align="center"| |{{stl|SZM|Shuiwan}} |{{large|{{lang|zh-cn|水湾}}}} | |{{small|204 226 233 331 K105 K204 M241 M371 M400 M430 M519 N4 N4区间 Q-H 8(前海行8)}} |0.62 |3.57 |- |align="center"|●||align="center"| |{{stl|SZM|Dongjiaotou}} |{{large|{{lang|zh-cn|东角头}}}} |{{rint|shenzhen|13|na}} |{{small|22 37 72 79 80 B737 M241 M519 N8 Peak-time 7(高峰7) Seaside Leisure Line}} |1.20 |4.77 |- |align="center"|●||align="center"|● |{{stl|SZM|Wanxia}} |{{large|{{lang|zh-cn|湾厦}}}} | |{{small|M493}} |1.55 |6.32 |- |align="center"|●||align="center"|● |{{stl|SZM|Haiyue}} |{{large|{{lang|zh-cn|海月}}}} | |{{small|B737 B817 M418 M430}} |0.75 |7.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Dengliang}} |{{large|{{lang|zh-cn|登良}}}} | |{{small|M474}} |1.02 |8.09 |- |align="center"|●||align="center"|● |{{stl|SZM|Houhai}} |{{large|{{lang|zh-cn|后海}}}} |{{rint|shenzhen|11}} {{rint|shenzhen|13|na}} |{{small|229 B964 M299 M429 M467 M474 M483 M493 M519 N24 Peak-time 10(高峰10)}} |0.95 |9.04 |- |align="center"|●||align="center"|● |[[Keyuan station (Shenzhen Metro)|Keyuan]] |{{large|{{lang|zh-cn|科苑}}}} |{{rint|shenzhen|13|na}} |{{small|72 B682 B964 E19 M299 M429 M474 Peak-time 10(高峰10) Peak-time 92(高峰92) Peak-time 94(高峰94) Peak-time 120(高峰120) Peak-time 121(高峰121) Peak-time 122(高峰122) Peak-time 138(高峰138)}} |1.35 |10.39 |- |align="center"|●||align="center"|● |{{stl|SZM|Hongshuwan}} |{{large|{{lang|zh-cn|红树湾}}}} | |{{small|58 B795 B911 M313 M355 M486 M487 Peak-time 30(高峰30) Peak-time 135(高峰135)}} |2.25 |12.64 |- |align="center"|●||align="center"|● |{{stl|SZM|Window of the World}} |{{large|{{lang|zh-cn|世界之窗}}}} |{{rint|shenzhen|1}} |{{small|21 26 32 42 43 66 70 79 90 101 113 123 204 209 222 223 234 323 324 327 338 365 369 373 383 390 392 392区间 395 B795 E10 K578 M222 M372 M388 M398 M413 M425 M433 M435 M448 M486 M487 M488 N4 N4区间 N6 N24 Peak-time 8(高峰8) Peak-time 12(高峰12) Peak-time 74(高峰74) Peak-time 93(高峰93) Peak-time 134(高峰134) Sightseeing 1(观光1) Sightseeing 4(观光4)}} |1.80 |14.44 |- |align="center"|●||align="center"|● |{{stl|SZM|Qiaocheng North}} |{{large|{{lang|zh-cn|侨城北}}}} | |{{small|72 104 237 325 326 390 B706 B729 M486 Peak-time 62(高峰62) Peak-time 119(高峰119)}} |2.25 |16.69 |- |align="center"|●||align="center"|● |{{stl|SZM|Shenkang}} |{{large|{{lang|zh-cn|深康}}}} | |{{small|70 72 M500 N24}} |1.20 |17.89 |rowspan=12|[[Futian District|Futian]] |- |align="center"|●||align="center"|● |{{stl|SZM|Antuo Hill}} |{{large|{{lang|zh-cn|安托山}}}} |{{rint|shenzhen|7}} |{{small|374}} |0.80 |18.69 |- |align="center"|●||align="center"|● |{{stl|SZM|Qiaoxiang}} |{{large|{{lang|zh-cn|侨香}}}} | |{{small|45 73 104 323 325 B611 B729 B968 M222 M312 M398 Peak-time 12(高峰12)}} |0.88 |19.57 |- |align="center"|●||align="center"|● |{{stl|SZM|Xiangmi}} |{{large|{{lang|zh-cn|香蜜}}}} | |{{small|45 73 104 316 323 325 B689 M312 M369 M398 Peak-time 38(高峰38)}} |1.05 |20.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Xiangmei North}} |{{large|{{lang|zh-cn|香梅北}}}} |{{rint|shenzhen|22|na}} |{{small|38 41 45 73 104 316 323 325 B689 E12 M312 M369 M398 M441 Peak-time 38(高峰38)}} |1.00 |21.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Jingtian}} |{{large|{{lang|zh-cn|景田}}}} |{{rint|shenzhen|9}} |{{small|11 21 38 41 45 73 79 104 213 222 316 323 328 365 B613 E12 M369 M391 M392 N6}} |1.00 |22.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Lianhua West}} |{{large|{{lang|zh-cn|莲花西}}}} | |{{small|14 38 41 46 60 65 71 73 107 108 111 215 235 236 237 322 324 325 374 383 B613 K105 K359 M372 M390 M488 M499 N9 Peak-time 19(高峰19) Peak-time 38(高峰38) Peak-time 123(高峰123)}} |1.37 |23.99 |- |align="center"|●||align="center"|● |{{stl|SZM|Futian}} |{{large|{{lang|zh-cn|福田}}}} |{{rint|shenzhen|3}} {{rint|shenzhen|11}} {{RouteBox|GSH|Guangzhou–Shenzhen–Hong Kong Express Rail Link|#{{rcr|CRH|intercity}}}} {{rint|cn|rail|link=Futian railway station}} [[Futian railway station (Guangdong)|NZQ]] |{{small|9 32 38 60 71 101 107 113 123 204 223 234 235 236 320 326 327 330/Airport 1(机场1) 374 395 398 B613 B709 E18 E28 K204 K318 K578 M221 M262 M363 M390 M413 M414 M435 M447 M448 N3 N4 N4区间 N9 Peak-express 18(高快18) Peak-express 20(高快20) Peak-time 15(高峰15) Peak-time 18(高峰18) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 58(高峰58) Peak-time 62(高峰62) Peak-time 119(高峰119) Peak-time 134(高峰134) Sightseeing 1(观光1)}} |0.95 |24.94 |- |align="center"|●||align="center"|● |{{stl|SZM|Civic Center}} |{{large|{{lang|zh-cn|市民中心}}}} |{{rint|shenzhen|4}} |{{small|34 38 60 64 326 371 373 398 E28 M347 M390 M435 M454 M459 M500 N3 N9 Peak-express 18(高快18) Peak-express 26(高快26) Peak-time 17(高峰17)}} |0.88 |25.82 |- |align="center"|●||align="center"|● |{{stl|SZM|Gangxia North}} |{{large|{{lang|zh-cn|岗厦北}}}} |{{rint|shenzhen|10}} {{rint|shenzhen|11}} {{rint|shenzhen|14}} |{{small|4 101 103 113 202 203 204 223 303 320 326 395 K113 K204 M363 M414 M435 M447 M448 N4 Peak-express 20(高快20) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 119(高峰119)}} |0.75 |26.57 |- |align="center"|●||align="center"|● |{{stl|SZM|Huaqiang North}} |{{large|{{lang|zh-cn|华强北}}}} |{{rint|shenzhen|7}}<br />{{rint|shenzhen|1}} (via {{stl|SZM|Huaqiang Road}})<ref group="note">Out-of-station virtual transfer to Line 1 at {{stl|SZM|Huaqiang Road}}. This transfer will be counted as two separate journeys requiring two fares.</ref> |{{small|65 67 75 80 302区间 M202 M389 M476 Peak-time 119(高峰119)}} |1.75 |28.32 |- |align="center"|●||align="center"|● |{{stl|SZM|Yannan}} |{{large|{{lang|zh-cn|燕南}}}} | |{{small|65 80 M389 M476}} |0.75 |29.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Grand Theater}} |{{large|{{lang|zh-cn|大剧院}}}} |{{rint|shenzhen|1}} {{rint|shenzhen|5|na}}<br />{{rint|shenzhen|9}} {{rint|shenzhen|11|na}} (via {{stl|SZM|Hongling South}})<ref group="note">Out-of-station virtual transfer to Line 9 at {{stl|SZM|Hongling South}}. This transfer will be counted as two separate journeys requiring two fares.</ref> |{{small|3 10 12 29 85 101 103 104 113 203 204 214 215 223 302 E8 K113 K204 M481 N3 N4 Sightseeing 1(观光1) Sightseeing 2(观光2)}} |1.60 |30.67 |rowspan=10|[[Luohu District|Luohu]] |- |align="center"|●||align="center"|● |{{stl|SZM|Hubei}} |{{large|{{lang|zh-cn|湖贝}}}} |{{rint|shenzhen|5|na}}{{efn|name=transfer|Out-of-station interchange.}} |{{small|2 10 17 29 85 104 205 214 220 223 K113 M290 M373 M383 N21 Peak-time 73(高峰73) Sightseeing 1(观光1)}} |1.85 |32.52 |- |align="center"|●||align="center"|● |{{stl|SZM|Huangbeiling}} |{{large|{{lang|zh-cn|黄贝岭}}}} |{{rint|shenzhen|5}} |{{small|10 27 69 85 111 205 220 223 336 363 381 382 387 E26 K113 M290 M348 M383 M445 M511 N14 N18 N21 Dameisha-holiday 1(大梅沙假日1) Peak-time 32(高峰32) Peak-time 58(高峰58) Peak-time 97(高峰97)Sightseeing 1(观光1)}} |1.20 |33.72 |- |align="center"|●||align="center"|● |{{stl|SZM|Xinxiu}} |{{large|{{lang|zh-cn|新秀}}}} | |{{small|69 85 111 220 381 B621 K113 M383 N14}} |1.35 |35.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Liantang Checkpoint}} |{{large|{{lang|zh-cn|莲塘口岸}}}} | | |1.1 |36.17 |- |align="center"|●||align="center"|● |{{stl|SZM|Xianhu Road}} |{{large|{{lang|zh-cn|仙湖路}}}} | | |1.9 |38.07 |- style = "background:#{{rcr|SZM|8}}; height: 2pt" | colspan = "8" | |- |align="center" style = "border-top:solid 0; border-bottom:solid 0;"|●||align="center" style = "border-top:solid 0; border-bottom:solid 0;"|● |[[Liantang station (Shenzhen Metro)|Liantang]] |{{large|{{lang|zh-cn|莲塘}}}} |{{rint|shenzhen|2}}{{efn|Line 8 connects with Line 2 at Liantang station, trains on Line 8 continue their service to Chiwan station.}} | |0.9 |38.97 |- style = "background:#{{rcr|SZM|2}}; height: 2pt" | colspan = "8" | |- |align="center"|●||align="center"| |{{stl|SZM|Wutong Mountain South}} |{{large|{{lang|zh-cn|梧桐山南}}}} | | |1.7 |40.67 |- |align="center"|●||align="center"| |{{stl|SZM|Shatoujiao}} |{{large|{{lang|zh-cn|沙头角}}}} | | |4.2 |44.87 | rowspan="5"|[[Yantian District|Yantian]] |- |align="center"|●||align="center"| |[[Haishan station (Shenzhen Metro)|Haishan]] |{{large|{{lang|zh-cn|海山}}}} | | |1.5 |46.37 |- |align="center"|●||align="center"| |{{stl|SZM|Yantian Port West}} |{{large|{{lang|zh-cn|盐田港西}}}} | | |1.2 |47.57 |- |align="center"|●||align="center"| |{{stl|SZM|Shenwai Senior Campus}} |{{large|{{lang|zh-cn|深外高中}}}} | | |2.9 |50.47 |- |align="center"|●||align="center"| |{{stl|SZM|Yantian Road}} |{{large|{{lang|zh-cn|盐田路}}}} | | |1.3 |51.77 |- style = "background:#{{rcr|SZM|8}}; height: 2pt" | colspan = "9" | |} {{notelist}} ===Phase 2 & Phase 3=== * Phase 2 and Phase 3 both under construction. Phase 2 from [[Yantian Road station|Yantian Road]] to Xiaomeisha, opening in 2023.<ref>{{Cite web |date=2023-03-13 |title=深圳地铁8号线二期开通日期 |url=https://m.sz.citys114.com/jt/17068.htm |access-date=2023-04-23 |website=citys114}}</ref> Phase 3 from Xiaomeisha to Xichong, opening in 2025. {| class="wikitable" ! colspan="2" | Station name ! rowspan="2" | Connections ! rowspan="2" | Location |- ! {{small|English}} ! {{small|Chinese}} |- style="background:#{{rcr|SZM|8}}; height: 2pt" | colspan="4" | |-bgcolor="lightgrey" |{{stl|SZM|Hong'anwei}} |{{large|{{lang|zh-cn|洪安围}}}} | |rowspan="4"|[[Yantian District|Yantian]] |-bgcolor="lightgrey" |{{stl|SZM|Yantianxu}} |{{large|{{lang|zh-cn|盐田墟}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Dameisha}} |{{large|{{lang|zh-cn|大梅沙}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Xiaomeisha}} |{{large|{{lang|zh-cn|小梅沙}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Xichong}} |{{large|{{lang|zh-cn|溪涌}}}} |{{rint|shenzhen|32|na}} |[[Dapeng New District]] |- style="background:#{{rcr|SZM|8}}; height: 2pt" | colspan="4" | |} ==Rolling Stock== {| border=0 style="border: 1px solid #999; background-color:white; text-align:left;font-size:90%" |- align="center" bgcolor=#cccccc !Type !!Date of manufacture !!Series !!Sets !!Serial number !!Assembly !!Notes |- |'''Type A''' ||2019–2020||Type A stock ||24||258–281[801-824]||Tc+Mp+M+M+Mp+Tc ||Manufactured by [[CRRC Zhuzhou Locomotive|CRRC Zhuzhou Electric Locomotive Works]] |- |} ==Notes== {{reflist|group=note}} ==References== {{reflist}} {{Eastern Guangdong & Hong Kong transit}} {{Shenzhen Metro|line8=yes}} [[Category:Shenzhen Metro lines]] [[Category:Transport infrastructure under construction in China]]'
New page wikitext, after the edit (new_wikitext)
'{{Short description|Metro line in Shenzhen, China}} {{Infobox rail line | name = | logo = ShenzhenMetroLine8.svg | logo_width = 100px | color = {{rcr|SZM|8}} | mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}}) | image = 深外高中站_月台.jpg | image_width = | image_alt = | caption = [[Shenwai Senior Campus station]] | type = [[Rapid transit]] | system = [[Shenzhen Metro]] | status = Operational | locale = [[Shenzhen]], [[People's Republic of China|China]] | start = {{stn|Chiwan}} | end = {{stn|Yantian Road}} | stations = 7 | routes = | daily_ridership = | close = | owner = | operator = SZMC (Shenzhen Metro Group) | character = Underground | depot = Wangji Lake stabling yard | stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A) | linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref> | tracklength = | tracks = [[Double-track railway|Double-track]] | gauge = {{RailGauge|sg|allk=on}} | electrification = {{1,500 V DC}} ([[Overhead lines]]) | speed = {{cvt|80|km/h}} | signalling = Urbalis 888 [[CBTC]] [[Moving block]] | elevation = | website = | map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}} | map_state = collapsed | open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref> }} '''Line 8''' of the [[Shenzhen Metro]] (also known as the Yantian line) is an East-West line from [[Liantang station (Shenzhen Metro)|Liantang]] to {{stl|SZM|Yantian Road}}. It opened on 28 October 2020. Line 8 has a length of {{convert|12.367|km|mi|1|abbr=on}} and a total of 7 stations.<ref name=sznews201908 /> Line 8 is the first line to serve [[Yantian District]]. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station. ==Timeline== {| class="wikitable" style="border-collapse: collapse; text-align: right;" !Segment!!Commencement!!Length!!Station(s)!!Name |- |style="text-align: left;"| Liantang — Yantian Road | 28 October 2020 | {{convert|12.367|km|mi|2|abbr=on}} | 7 |style="text-align: left;"| Phase 1 |} ==Service routes== * {{stl|SZM|Chiwan}} — {{stl|SZM|Yantian Road}} * {{stl|SZM|Wanxia}} — {{stl|SZM|Liantang}} (Working days peak hours only) ==Stations== {| class="wikitable" ! rowspan="2" colspan="2" | Service<br />routes ! colspan="2" | Station name ! rowspan="2" | Connections ! rowspan="2" | Nearby bus stops ! colspan="2" rowspan="2" | Distance<br />{{small|km}} ! rowspan="2" | Location |- ! {{small|English}} ! {{small|Chinese}} |- style = "background:#{{rcr|SZM|2}}; height: 2pt" | colspan = "9" | |- |align="center"|●||align="center"| |{{stl|SZM|Chiwan}} |{{large|{{lang|zh-cn|赤湾}}}} |{{rint|shenzhen|5}} |{{small|79 80 B945 M489 N4 N8}} |0.00 |0.00 |rowspan=13|[[Nanshan District, Shenzhen|Nanshan]] |- |align="center"|●||align="center"| |{{stl|SZM|Shekou Port}} |{{large|{{lang|zh-cn|蛇口港}}}} | |{{small|22 70 79 80 113 122 204 226 233 328 331 332 K105 K113 K204 M371 M400 M409 M430 M448 N4 N8}} |1.85 |1.85 |- |align="center"|●||align="center"| |{{stl|SZM|Sea World}} |{{large|{{lang|zh-cn|海上世界}}}} |{{rint|shenzhen|12}} |{{small|37 122 204 226 233 328 331 332 B816 K105 K113 K204 M371 M400 M409 M430 M448 M493 M519 N4 N4区间 Airport 10(机场10) Q-H 8(前海行8)}} |1.10 |2.95 |- |align="center"|●||align="center"| |{{stl|SZM|Shuiwan}} |{{large|{{lang|zh-cn|水湾}}}} | |{{small|204 226 233 331 K105 K204 M241 M371 M400 M430 M519 N4 N4区间 Q-H 8(前海行8)}} |0.62 |3.57 |- |align="center"|●||align="center"| |{{stl|SZM|Dongjiaotou}} |{{large|{{lang|zh-cn|东角头}}}} |{{rint|shenzhen|13|na}} |{{small|22 37 72 79 80 B737 M241 M519 N8 Peak-time 7(高峰7) Seaside Leisure Line}} |1.20 |4.77 |- |align="center"|●||align="center"|● |{{stl|SZM|Wanxia}} |{{large|{{lang|zh-cn|湾厦}}}} | |{{small|M493}} |1.55 |6.32 |- |align="center"|●||align="center"|● |{{stl|SZM|Haiyue}} |{{large|{{lang|zh-cn|海月}}}} | |{{small|B737 B817 M418 M430}} |0.75 |7.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Dengliang}} |{{large|{{lang|zh-cn|登良}}}} | |{{small|M474}} |1.02 |8.09 |- |align="center"|●||align="center"|● |{{stl|SZM|Houhai}} |{{large|{{lang|zh-cn|后海}}}} |{{rint|shenzhen|11}} {{rint|shenzhen|13|na}} |{{small|229 B964 M299 M429 M467 M474 M483 M493 M519 N24 Peak-time 10(高峰10)}} |0.95 |9.04 |- |align="center"|●||align="center"|● |[[Keyuan station (Shenzhen Metro)|Keyuan]] |{{large|{{lang|zh-cn|科苑}}}} |{{rint|shenzhen|13|na}} |{{small|72 B682 B964 E19 M299 M429 M474 Peak-time 10(高峰10) Peak-time 92(高峰92) Peak-time 94(高峰94) Peak-time 120(高峰120) Peak-time 121(高峰121) Peak-time 122(高峰122) Peak-time 138(高峰138)}} |1.35 |10.39 |- |align="center"|●||align="center"|● |{{stl|SZM|Hongshuwan}} |{{large|{{lang|zh-cn|红树湾}}}} | |{{small|58 B795 B911 M313 M355 M486 M487 Peak-time 30(高峰30) Peak-time 135(高峰135)}} |2.25 |12.64 |- |align="center"|●||align="center"|● |{{stl|SZM|Window of the World}} |{{large|{{lang|zh-cn|世界之窗}}}} |{{rint|shenzhen|1}} |{{small|21 26 32 42 43 66 70 79 90 101 113 123 204 209 222 223 234 323 324 327 338 365 369 373 383 390 392 392区间 395 B795 E10 K578 M222 M372 M388 M398 M413 M425 M433 M435 M448 M486 M487 M488 N4 N4区间 N6 N24 Peak-time 8(高峰8) Peak-time 12(高峰12) Peak-time 74(高峰74) Peak-time 93(高峰93) Peak-time 134(高峰134) Sightseeing 1(观光1) Sightseeing 4(观光4)}} |1.80 |14.44 |- |align="center"|●||align="center"|● |{{stl|SZM|Qiaocheng North}} |{{large|{{lang|zh-cn|侨城北}}}} | |{{small|72 104 237 325 326 390 B706 B729 M486 Peak-time 62(高峰62) Peak-time 119(高峰119)}} |2.25 |16.69 |- |align="center"|●||align="center"|● |{{stl|SZM|Shenkang}} |{{large|{{lang|zh-cn|深康}}}} | |{{small|70 72 M500 N24}} |1.20 |17.89 |rowspan=12|[[Futian District|Futian]] |- |align="center"|●||align="center"|● |{{stl|SZM|Antuo Hill}} |{{large|{{lang|zh-cn|安托山}}}} |{{rint|shenzhen|7}} |{{small|374}} |0.80 |18.69 |- |align="center"|●||align="center"|● |{{stl|SZM|Qiaoxiang}} |{{large|{{lang|zh-cn|侨香}}}} | |{{small|45 73 104 323 325 B611 B729 B968 M222 M312 M398 Peak-time 12(高峰12)}} |0.88 |19.57 |- |align="center"|●||align="center"|● |{{stl|SZM|Xiangmi}} |{{large|{{lang|zh-cn|香蜜}}}} | |{{small|45 73 104 316 323 325 B689 M312 M369 M398 Peak-time 38(高峰38)}} |1.05 |20.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Xiangmei North}} |{{large|{{lang|zh-cn|香梅北}}}} |{{rint|shenzhen|22|na}} |{{small|38 41 45 73 104 316 323 325 B689 E12 M312 M369 M398 M441 Peak-time 38(高峰38)}} |1.00 |21.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Jingtian}} |{{large|{{lang|zh-cn|景田}}}} |{{rint|shenzhen|9}} |{{small|11 21 38 41 45 73 79 104 213 222 316 323 328 365 B613 E12 M369 M391 M392 N6}} |1.00 |22.62 |- |align="center"|●||align="center"|● |{{stl|SZM|Lianhua West}} |{{large|{{lang|zh-cn|莲花西}}}} | |{{small|14 38 41 46 60 65 71 73 107 108 111 215 235 236 237 322 324 325 374 383 B613 K105 K359 M372 M390 M488 M499 N9 Peak-time 19(高峰19) Peak-time 38(高峰38) Peak-time 123(高峰123)}} |1.37 |23.99 |- |align="center"|●||align="center"|● |{{stl|SZM|Futian}} |{{large|{{lang|zh-cn|福田}}}} |{{rint|shenzhen|3}} {{rint|shenzhen|11}} {{RouteBox|GSH|Guangzhou–Shenzhen–Hong Kong Express Rail Link|#{{rcr|CRH|intercity}}}} {{rint|cn|rail|link=Futian railway station}} [[Futian railway station (Guangdong)|NZQ]] |{{small|9 32 38 60 71 101 107 113 123 204 223 234 235 236 320 326 327 330/Airport 1(机场1) 374 395 398 B613 B709 E18 E28 K204 K318 K578 M221 M262 M363 M390 M413 M414 M435 M447 M448 N3 N4 N4区间 N9 Peak-express 18(高快18) Peak-express 20(高快20) Peak-time 15(高峰15) Peak-time 18(高峰18) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 58(高峰58) Peak-time 62(高峰62) Peak-time 119(高峰119) Peak-time 134(高峰134) Sightseeing 1(观光1)}} |0.95 |24.94 |- |align="center"|●||align="center"|● |{{stl|SZM|Civic Center}} |{{large|{{lang|zh-cn|市民中心}}}} |{{rint|shenzhen|4}} |{{small|34 38 60 64 326 371 373 398 E28 M347 M390 M435 M454 M459 M500 N3 N9 Peak-express 18(高快18) Peak-express 26(高快26) Peak-time 17(高峰17)}} |0.88 |25.82 |- |align="center"|●||align="center"|● |{{stl|SZM|Gangxia North}} |{{large|{{lang|zh-cn|岗厦北}}}} |{{rint|shenzhen|10}} {{rint|shenzhen|11}} {{rint|shenzhen|14}} |{{small|4 101 103 113 202 203 204 223 303 320 326 395 K113 K204 M363 M414 M435 M447 M448 N4 Peak-express 20(高快20) Peak-time 38(高峰38) Peak-time 49(高峰49) Peak-time 119(高峰119)}} |0.75 |26.57 |- |align="center"|●||align="center"|● |{{stl|SZM|Huaqiang North}} |{{large|{{lang|zh-cn|华强北}}}} |{{rint|shenzhen|7}}<br />{{rint|shenzhen|1}} (via {{stl|SZM|Huaqiang Road}})<ref group="note">Out-of-station virtual transfer to Line 1 at {{stl|SZM|Huaqiang Road}}. This transfer will be counted as two separate journeys requiring two fares.</ref> |{{small|65 67 75 80 302区间 M202 M389 M476 Peak-time 119(高峰119)}} |1.75 |28.32 |- |align="center"|●||align="center"|● |{{stl|SZM|Yannan}} |{{large|{{lang|zh-cn|燕南}}}} | |{{small|65 80 M389 M476}} |0.75 |29.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Grand Theater}} |{{large|{{lang|zh-cn|大剧院}}}} |{{rint|shenzhen|1}} {{rint|shenzhen|5|na}}<br />{{rint|shenzhen|9}} {{rint|shenzhen|11|na}} (via {{stl|SZM|Hongling South}})<ref group="note">Out-of-station virtual transfer to Line 9 at {{stl|SZM|Hongling South}}. This transfer will be counted as two separate journeys requiring two fares.</ref> |{{small|3 10 12 29 85 101 103 104 113 203 204 214 215 223 302 E8 K113 K204 M481 N3 N4 Sightseeing 1(观光1) Sightseeing 2(观光2)}} |1.60 |30.67 |rowspan=10|[[Luohu District|Luohu]] |- |align="center"|●||align="center"|● |{{stl|SZM|Hubei}} |{{large|{{lang|zh-cn|湖贝}}}} |{{rint|shenzhen|5|na}}{{efn|name=transfer|Out-of-station interchange.}} |{{small|2 10 17 29 85 104 205 214 220 223 K113 M290 M373 M383 N21 Peak-time 73(高峰73) Sightseeing 1(观光1)}} |1.85 |32.52 |- |align="center"|●||align="center"|● |{{stl|SZM|Huangbeiling}} |{{large|{{lang|zh-cn|黄贝岭}}}} |{{rint|shenzhen|5}} |{{small|10 27 69 85 111 205 220 223 336 363 381 382 387 E26 K113 M290 M348 M383 M445 M511 N14 N18 N21 Dameisha-holiday 1(大梅沙假日1) Peak-time 32(高峰32) Peak-time 58(高峰58) Peak-time 97(高峰97)Sightseeing 1(观光1)}} |1.20 |33.72 |- |align="center"|●||align="center"|● |{{stl|SZM|Xinxiu}} |{{large|{{lang|zh-cn|新秀}}}} | |{{small|69 85 111 220 381 B621 K113 M383 N14}} |1.35 |35.07 |- |align="center"|●||align="center"|● |{{stl|SZM|Liantang Checkpoint}} |{{large|{{lang|zh-cn|莲塘口岸}}}} | | |1.1 |36.17 |- |align="center"|●||align="center"|● |{{stl|SZM|Xianhu Road}} |{{large|{{lang|zh-cn|仙湖路}}}} | | |1.9 |38.07 |- style = "background:#{{rcr|SZM|8}}; height: 2pt" | colspan = "8" | |- |align="center" style = "border-top:solid 0; border-bottom:solid 0;"|●||align="center" style = "border-top:solid 0; border-bottom:solid 0;"|● |[[Liantang station (Shenzhen Metro)|Liantang]] |{{large|{{lang|zh-cn|莲塘}}}} |{{rint|shenzhen|2}}{{efn|Line 8 connects with Line 2 at Liantang station, trains on Line 8 continue their service to Chiwan station.}} | |0.9 |38.97 |- style = "background:#{{rcr|SZM|2}}; height: 2pt" | colspan = "8" | |- |align="center"|●||align="center"| |{{stl|SZM|Wutong Mountain South}} |{{large|{{lang|zh-cn|梧桐山南}}}} | | |1.7 |40.67 |- |align="center"|●||align="center"| |{{stl|SZM|Shatoujiao}} |{{large|{{lang|zh-cn|沙头角}}}} | | |4.2 |44.87 | rowspan="5"|[[Yantian District|Yantian]] |- |align="center"|●||align="center"| |[[Haishan station (Shenzhen Metro)|Haishan]] |{{large|{{lang|zh-cn|海山}}}} | | |1.5 |46.37 |- |align="center"|●||align="center"| |{{stl|SZM|Yantian Port West}} |{{large|{{lang|zh-cn|盐田港西}}}} | | |1.2 |47.57 |- |align="center"|●||align="center"| |{{stl|SZM|Shenwai Senior Campus}} |{{large|{{lang|zh-cn|深外高中}}}} | | |2.9 |50.47 |- |align="center"|●||align="center"| |{{stl|SZM|Yantian Road}} |{{large|{{lang|zh-cn|盐田路}}}} | | |1.3 |51.77 |- style = "background:#{{rcr|SZM|8}}; height: 2pt" | colspan = "9" | |} {{notelist}} ===Phase 2 & Phase 3=== * Phase 2 and Phase 3 both under construction. Phase 2 from [[Yantian Road station|Yantian Road]] to Xiaomeisha, opening in 2023.<ref>{{Cite web |date=2023-03-13 |title=深圳地铁8号线二期开通日期 |url=https://m.sz.citys114.com/jt/17068.htm |access-date=2023-04-23 |website=citys114}}</ref> Phase 3 from Xiaomeisha to Xichong, opening in 2025. {| class="wikitable" ! colspan="2" | Station name ! rowspan="2" | Connections ! rowspan="2" | Location |- ! {{small|English}} ! {{small|Chinese}} |- style="background:#{{rcr|SZM|8}}; height: 2pt" | colspan="4" | |-bgcolor="lightgrey" |{{stl|SZM|Hong'anwei}} |{{large|{{lang|zh-cn|洪安围}}}} | |rowspan="4"|[[Yantian District|Yantian]] |-bgcolor="lightgrey" |{{stl|SZM|Yantianxu}} |{{large|{{lang|zh-cn|盐田墟}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Dameisha}} |{{large|{{lang|zh-cn|大梅沙}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Xiaomeisha}} |{{large|{{lang|zh-cn|小梅沙}}}} | |-bgcolor="lightgrey" |{{stl|SZM|Xichong}} |{{large|{{lang|zh-cn|溪涌}}}} |{{rint|shenzhen|32|na}} |[[Dapeng New District]] |- style="background:#{{rcr|SZM|8}}; height: 2pt" | colspan="4" | |} ==Rolling Stock== {| border=0 style="border: 1px solid #999; background-color:white; text-align:left;font-size:90%" |- align="center" bgcolor=#cccccc !Type !!Date of manufacture !!Series !!Sets !!Serial number !!Assembly !!Notes |- |'''Type A''' ||2019–2020||Type A stock ||24||258–281[801-824]||Tc+Mp+M+M+Mp+Tc ||Manufactured by [[CRRC Zhuzhou Locomotive|CRRC Zhuzhou Electric Locomotive Works]] |- |} ==Notes== {{reflist|group=note}} ==References== {{reflist}} {{Eastern Guangdong & Hong Kong transit}} {{Shenzhen Metro|line8=yes}} [[Category:Shenzhen Metro lines]] [[Category:Transport infrastructure under construction in China]]'
Unified diff of changes made by edit (edit_diff)
'@@ -1,40 +1,41 @@ {{Short description|Metro line in Shenzhen, China}} {{Infobox rail line -|name = -| logo = ShenzhenMetroLine8.svg -| logo_width = 100px -| color = {{rcr|SZM|8}} -| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}}) -| image = 深外高中站_月台.jpg -| image_width = -| image_alt = -| caption = [[Shenwai Senior Campus station]] -| type = [[Rapid transit]] -| system = [[Shenzhen Metro]] -| status = Operational -| locale = [[Shenzhen]], [[People's Republic of China|China]] -| start = {{stn|Liantang||Shenzhen Metro}} -| end = {{stn|Yantian Road}} -| stations = 7 -| routes = -| daily_ridership = -| close = -| owner = -| operator = SZMC (Shenzhen Metro Group) -| character = Underground -| depot = Wangji Lake stabling yard -| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A) -| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref> -| tracklength = -| tracks = [[Double-track railway|Double-track]] -| gauge = {{RailGauge|sg|allk=on}} -| electrification = {{1,500 V DC}} ([[Overhead lines]]) -| speed = {{cvt|80|km/h}} -| signalling = Urbalis 888 [[CBTC]] [[Moving block]] -| elevation = -| website = -| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}} -| map_state = collapsed -| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>}} +| name = +| logo = ShenzhenMetroLine8.svg +| logo_width = 100px +| color = {{rcr|SZM|8}} +| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}}) +| image = 深外高中站_月台.jpg +| image_width = +| image_alt = +| caption = [[Shenwai Senior Campus station]] +| type = [[Rapid transit]] +| system = [[Shenzhen Metro]] +| status = Operational +| locale = [[Shenzhen]], [[People's Republic of China|China]] +| start = {{stn|Chiwan}} +| end = {{stn|Yantian Road}} +| stations = 7 +| routes = +| daily_ridership = +| close = +| owner = +| operator = SZMC (Shenzhen Metro Group) +| character = Underground +| depot = Wangji Lake stabling yard +| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A) +| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref> +| tracklength = +| tracks = [[Double-track railway|Double-track]] +| gauge = {{RailGauge|sg|allk=on}} +| electrification = {{1,500 V DC}} ([[Overhead lines]]) +| speed = {{cvt|80|km/h}} +| signalling = Urbalis 888 [[CBTC]] [[Moving block]] +| elevation = +| website = +| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}} +| map_state = collapsed +| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref> +}} '''Line 8''' of the [[Shenzhen Metro]] (also known as the Yantian line) is an East-West line from [[Liantang station (Shenzhen Metro)|Liantang]] to {{stl|SZM|Yantian Road}}. It opened on 28 October 2020. Line 8 has a length of {{convert|12.367|km|mi|1|abbr=on}} and a total of 7 stations.<ref name=sznews201908 /> Line 8 is the first line to serve [[Yantian District]]. Line 8 merges into Line 2 at Liantang station, with trains on Line 8 continuing service to Chiwan station. '
New page size (new_size)
15509
Old page size (old_size)
14815
Size change in edit (edit_delta)
694
Lines added in edit (added_lines)
[ 0 => '| name = ', 1 => '| logo = ShenzhenMetroLine8.svg', 2 => '| logo_width = 100px', 3 => '| color = {{rcr|SZM|8}}', 4 => '| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}})', 5 => '| image = 深外高中站_月台.jpg', 6 => '| image_width = ', 7 => '| image_alt = ', 8 => '| caption = [[Shenwai Senior Campus station]]', 9 => '| type = [[Rapid transit]]', 10 => '| system = [[Shenzhen Metro]]', 11 => '| status = Operational', 12 => '| locale = [[Shenzhen]], [[People's Republic of China|China]]', 13 => '| start = {{stn|Chiwan}}', 14 => '| end = {{stn|Yantian Road}}', 15 => '| stations = 7', 16 => '| routes = ', 17 => '| daily_ridership = ', 18 => '| close = ', 19 => '| owner = ', 20 => '| operator = SZMC (Shenzhen Metro Group)', 21 => '| character = Underground', 22 => '| depot = Wangji Lake stabling yard', 23 => '| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A)', 24 => '| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref>', 25 => '| tracklength = ', 26 => '| tracks = [[Double-track railway|Double-track]]', 27 => '| gauge = {{RailGauge|sg|allk=on}}', 28 => '| electrification = {{1,500 V DC}} ([[Overhead lines]])', 29 => '| speed = {{cvt|80|km/h}}', 30 => '| signalling = Urbalis 888 [[CBTC]] [[Moving block]]', 31 => '| elevation = ', 32 => '| website = ', 33 => '| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}}', 34 => '| map_state = collapsed', 35 => '| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>', 36 => '}}' ]
Lines removed in edit (removed_lines)
[ 0 => '|name = ', 1 => '| logo = ShenzhenMetroLine8.svg', 2 => '| logo_width = 100px', 3 => '| color = {{rcr|SZM|8}}', 4 => '| mapcolor = {{rcb|SZM|8|box}} Orange (#{{rcr|SZM|8}})', 5 => '| image = 深外高中站_月台.jpg', 6 => '| image_width = ', 7 => '| image_alt =', 8 => '| caption = [[Shenwai Senior Campus station]]', 9 => '| type = [[Rapid transit]]', 10 => '| system = [[Shenzhen Metro]]', 11 => '| status = Operational', 12 => '| locale = [[Shenzhen]], [[People's Republic of China|China]]', 13 => '| start = {{stn|Liantang||Shenzhen Metro}}', 14 => '| end = {{stn|Yantian Road}}', 15 => '| stations = 7', 16 => '| routes = ', 17 => '| daily_ridership = ', 18 => '| close = ', 19 => '| owner = ', 20 => '| operator = SZMC (Shenzhen Metro Group)', 21 => '| character = Underground', 22 => '| depot = Wangji Lake stabling yard', 23 => '| stock = Trains service in [[Line 2 (Shenzhen Metro)|Line 2]]<br/>CRRC Zhuzhou (258–281[801–824]) (6A)', 24 => '| linelength = {{cvt|12.367|km|mi|1|abbr=on}}<ref name=sznews201908>{{cite web|url=http://www.sznews.com/news/content/2019-08/01/content_22322810.htm|date=2019-08-01|title=深圳地铁8号线开始铺设轨道,盐田2020年进入地铁时代}}</ref>', 25 => '| tracklength = ', 26 => '| tracks = [[Double-track railway|Double-track]]', 27 => '| gauge = {{RailGauge|sg|allk=on}}', 28 => '| electrification = {{1,500 V DC}} ([[Overhead lines]])', 29 => '| speed = {{cvt|80|km/h}}', 30 => '| signalling = Urbalis 888 [[CBTC]] [[Moving block]]', 31 => '| elevation = ', 32 => '| website =', 33 => '| map = {{Line 2 & Line 8 (Shenzhen Metro) RDT}}', 34 => '| map_state = collapsed', 35 => '| open = {{Start date and age|2020|10|28|df=y}}<ref>{{cite web|url=http://www.sznews.com/news/content/2019-08/13/content_22382685.htm|title=深圳地铁8号线将于2020年10月28日正式投入运营|date=2019-08-13}}</ref>}}' ]
Whether or not the change was made through a Tor exit node (tor_exit_node)
false
Unix timestamp of change (timestamp)
'1694513010'