Coolidge Corner station
Coolidge Corner | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Beacon Street at Harvard Street Brookline, Massachusetts | ||||||||||
Coordinates | 42°20′32″N 71°07′15″W / 42.34223°N 71.12089°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | MBTA bus: 66 | ||||||||||
Construction | |||||||||||
Bicycle facilities | 20 spaces | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | June 1, 1888 | ||||||||||
Rebuilt | 1901; 2001 | ||||||||||
Passengers | |||||||||||
2011 | 3,440 (weekday average boardings)[1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Coolidge Corner station is a light rail stop on the MBTA Green Line C branch, located at the intersection of Beacon Street and Harvard Street in the Coolidge Corner neighborhood of Brookline, Massachusetts. With 3,440 daily boardings by a 2011 count, it had more than twice the ridership of any other surface station on the branch.[1]
History
[edit]Horsecar service on the Beacon Street line began between Coolidge Corner and downtown Boston on June 1, 1888.[2]: 54 Electrified service began between Allston and downtown Boston via Coolidge Corner on January 3, 1889.[2]: 48 Service was extended west from Coolidge Corner to Reservoir on January 12, and from Allston to Oak Square the next day.[2]: 56
On February 3, 1900, the Boston Elevated Railway (BERy) established Coolidge Corner as a designated transfer point, where passengers could transfer between the Reservoir and Oak Square branches.[3] The town approved the construction of shelters at the stop in November 1900, and they were completed in 1901.[4][5][6] Each is 20 feet (6.1 m) long with a 40-foot (12 m)-long canopy, made of white pine with a tile roof.[5] Similar shelters were built around 1912 at Brookline Village, but demolished in 1938.[7][8] A 1911-built electrical substation designed by Peabody and Stearns is located in Coolidge Corner on Webster Street.[6]
In the early 2000s, the MBTA modified key surface stops with raised platforms for accessibility. Portable lifts were installed at Coolidge Corner around 2000 as a temporary measure.[9][10] The platform modifications – part of a $32 million modification of thirteen B, C, and E branch stations – were completed in 2001.[11]
The MBTA added wooden mini-high platforms, allowing level boarding on older Type 7 LRVs, at eight Green Line stations in 2006–07 as part of the settlement of Joanne Daniels-Finegold, et al. v. MBTA. Coolidge Corner and Washington Square were originally to have one mini-high platform apiece as well; however, portable lifts were added at the stations instead.[12][13]
In February 2024, the MBTA indicated long-term plans to replace the existing platforms with a longer island platform west of the Harvard Street grade crossing.[14]
References
[edit]- ^ Jump up to: a b "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ Jump up to: a b c Clarke, Bradley H.; Cummings, O.R. (1997). Tremont Street Subway: A Century of Public Service. Boston Street Railway Association. ISBN 0938315048.
- ^ "New Free Transfer Station". Boston Globe. February 2, 1900. p. 5 – via Newspapers.com.
- ^ "Brookline". Boston Globe. November 10, 1900. p. 4 – via Newspapers.com.
- ^ Jump up to: a b "Greatly Needed Storm Shelters". Boston Globe. January 4, 1901. p. 8 – via Newspapers.com.
- ^ Jump up to: a b Zimmerman, Sarah; Wyman Benka, Carla (June 1985). "National Register of Historic Places – Inventory Nomination Form: Brookline Multiple Resource Area". National Park Service. p. 7.46.
- ^ "Brookline". Boston Globe. September 6, 1912. p. 6 – via Newspapers.com.
- ^ Cheney, Frank; Sammarco, Anthony M. (1997). Trolleys Under the Hub. Arcadia Publishing. p. 111. ISBN 0752409077.
- ^ "Executive Summary" (PDF). Program of Mass Transportation. Boston Regional Metropolitan Planning Organization. January 2004. p. 2-9. Archived from the original (PDF) on February 20, 2012.
- ^ "Subway Map" (PDF). Massachusetts Bay Transportation Authority. 2001. Archived from the original (PDF) on July 1, 2001.
- ^ Rivera, Lydia (July 12, 2001). "The MBTA Continues Accessibility Program At Coolidge Corner Station". MBTA Press Releases. Massachusetts Bay Transportation Authority. Archived from the original on October 30, 2001.
- ^ "Settlement Agreement" (PDF). Joanne Daniels-Finegold et al. v. MBTA. April 10, 2006. pp. 10–11.
- ^ "Green Line Stations Upgraded to Improve Accessibility" (PDF). TRANSReport. Boston Regional Metropolitan Planning Organization. June 2007. Archived from the original (PDF) on January 16, 2011.
- ^ "Green Line C Branch Accessibility Upgrades" (PDF). Massachusetts Bay Transportation Authority. February 15, 2024.
External links
[edit]Media related to Coolidge Corner station at Wikimedia Commons