Jump to content

Bridgewater railway line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Jabberjaw (talk | contribs) at 14:16, 10 October 2017 ( Line guide: edited Long Gully (that article states closure in Sept 87 and not Apr)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Bridgewater railway line
Overview
LocaleAdelaide, South Australia
Termini
Stations
History
Opened1883
Closed23 September 1987
Technical
Line length37.3 km (23.2 mi)
Number of tracksQuadruple Track to Goodwood
Single Track to Belair
(formerly double track)
Closed from Belair
(formerly single track)

The Bridgewater railway line is a former passenger railway service on the Adelaide to Wolseley line in the Adelaide Hills. It was served by TransAdelaide suburban services from Adelaide. In September 1987, the service was curtailed to Belair. In 1995, the line was converted to standard gauge as part of the One Nation infrastructure program, disconnecting these stations from the broad gauge suburban railway system.

History

The line from Adelaide to Belair/Bridgewater was opened in 1883, and headed east from Belair parallel to the northern side of Belair National Park. It then turned south through the national park and then turned east again, where the National Park station used to be. It continued east past Long Gully and Nalawort stations to the Upper Sturt station, 28.9 km from Adelaide station. 500m later the track turned north east and continued to Mount Lofty station, 31 km from Adelaide. After that it turned south and reached Heathfield station (33 km), just after the line turned north east. It reached the village of Aldgate just as it passed the Madurta station, then the track reached the Aldgate station (34.5 km). The line continued east, passing the Jibilla and Carripook stations and finally, the line terminated at Bridgewater station, 37.3 km by rail from Adelaide Railway Station.

The Bridgewater line had a fairly steep grade for most of the journey, sometimes resulting in derailments due to the tight bends. Services from Adelaide to Bridgewater usually took an average of one hour (stopping all stations), and about 50 minutes (express). Only one train every two hours operated during off-peak and weekends (most terminating at Belair) and no more than two trains per hour in either direction during peak-hours. This was because the line was single track (which is still the case today) with crossing loops located at Belair, Long Gully, Mount Lofty, Aldgate and Bridgewater.

When the more direct South Eastern Freeway opened in the late 1960s, patronage to Bridgewater declined heavily, as more people had access to cars and the car journey was much quicker and shorter. In 1985, the State Transport Authority sought to have the service withdrawn. The line had 12 services on weekdays, nine on Saturdays and five on Sundays.[1] On 23 September 1987, passenger services to Bridgewater were withdrawn, attributed to high cost of operation and low passenger numbers. All stations beyond Belair were closed, and all suburban trains now terminate at Belair.[2]

Services

Services on the Bridgewater line were mainly operated by Redhen railcars, with the 2000 class railcars occasionally used in its final years. On special occasions after 1987, such as the Oakbank Easter Racing Carnival held every Easter weekend at Oakbank, trains ran further east to terminate at Balhannah station. However, this service ceased prior to the standard gauge conversion, due to the expense of operating the line.[citation needed].

Conversion

In 1995, the Adelaide to Wolseley line was converted from broad gauge (1600mm) to standard gauge (1435 mm) ruling out any restoration of local trains to Bridgewater or beyond, and it disconnected a number of the South Australian country broad gauge services from Adelaide. Between Goodwood and Belair, the former double track route became two parallel single lines, one broad gauge for Adelaide Metro suburban services, the other standard gauge freight services.[3] Along with this conversion, stations on the Belair line at Mile End Goods, Millswood, Hawthorn and Clapham closed. The other Belair line stations each had one platform closed. Millswood reopened on 12 October 2014 for a 12-month trial. The trial was successful, and the station was reopened permanently.

Stations

Template:BS-map

 Line guide

Station Image Opened Additional information
Bridgewater Terminus 1857-1987; closed April 1987
Carripook Closed April 1987
Jibilla Closed April 1987
Aldgate Closed April 1987; crossing loop closed 1995
Madurta Closed April 1987
Heathfield Closed April 1987
Mount Lofty Closed April 1987; crossing loop closed 1995
Upper Sturt Closed April 1987
Nalawort Closed April 1987
Long Gully ? Closed 23 September 1987(?); crossing loop closed 1995
National Park ? Closed 23 September 1987(?)
Belair 1883 Former station; crossing loop closed 1995; terminus of the Belair line.

References

  1. ^ "South Australia" Railway Digest June 1985 page 193
  2. ^ Callaghan, WH (1992). The Overland Railway. Sydney: Australian Railway Historical Society. p. 217. ISBN 0 909650 29 2.
  3. ^ D3 Wolseley to Mile End Australian Rail Track Corporation