D35 motorway (Czech Republic)
Appearance
This article needs additional citations for verification. (August 2008) |
D35 Motorway | |
---|---|
Dálnice D35 | |
Route information | |
Length | 76 km (47 mi) Planned: 197 km (122 mi) |
Major junctions | |
From | D1 near Lipník nad Bečvou 50°26′27.36″N 15°26′43.27″E / 50.4409333°N 15.4453528°E |
D55 near Olomouc (planned)
D46 near Olomouc
D10 near Turnov (planned) | |
To | Liberec (in the future Zittau) 49°32′47.66″N 17°33′43.15″E / 49.5465722°N 17.5619861°E |
Location | |
Country | Czech Republic |
Regions | Olomouc, Pardubice, Hradec Králové, Liberec |
Major cities | Olomouc, Hradec Králové, Liberec |
Highway system | |
D35 motorway (Czech: Dálnice D35), formerly Expressway R35 (Czech: Rychlostní silnice R35) is a highway in the Czech Republic. Once completed, it will be the second longest highway in Czech Republic, running from Úlibice to the D1 at Lipník nad Bečvou.[1] After completion, it will become an alternative route to motorway D1 between Prague and Olomouc and Ostrava. The first segment was opened in the 1970s.
As of 2022[update] 76 km of full motorway are in operation in two segments.[2]
Under construction
Images
-
Highway D35 near Olomouc.
-
D35 near Opatovice nad Labem
References
- ^ "Planned construction progress on the road and motorway network" (PDF). Road and Motorway Directorate of the Czech Republic. Retrieved 21 October 2018.
- ^ "Dálnice D35 (only CZ)". Archived from the original on 2015-12-27.
External links
- Info on motorway.cz (in English)
- Info on ceskedalnice.cz (in Czech)
- Info on dalnice-silnice.cz Archived 2016-02-24 at the Wayback Machine (in Czech)
- Ecology vs. R 35 (in Czech)