Jump to content

British Rail Class 385: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tags: Reverted Mobile edit Mobile web edit
Line 121: Line 121:
|}
|}
<br />
<br />

{{Unreferenced section|date=September 2020}}


[[File:Scotrail Class 385-0 w-pantograph.png|none|thumb|532x532px|Abellio ScotRail Class 385/0]]
[[File:Scotrail Class 385-0 w-pantograph.png|none|thumb|532x532px|Abellio ScotRail Class 385/0]]
[[File:Scotrail Class 385-1 w-pantograph.png|none|thumb|704x704px|Abellio ScotRail Class 385/1]]
[[File:Scotrail Class 385-1 w-pantograph.png|none|thumb|704x704px|Abellio ScotRail Class 385/1]]

Revision as of 16:44, 23 September 2020

British Rail Class 385 AT200
385008 at Gourock on the Inverclyde Line
Standard class interior
In service24 July 2018 – 4 October 2018[1]
13 October 2018 – present
ManufacturerHitachi Rail
Built atKasado Works, Japan
Newton Aycliffe, England
Family nameA-Train
ReplacedClass 156
Class 158
Class 170
Class 314
Constructed2015 – 2019
Number built70 units
Formation46 x 3-carriage (385/0)
24 x 4-carriage (385/1)
Capacity385/0: 206 seats
385/1: 273 seats (20 first class, 253 standard)[2]
OperatorsAbellio ScotRail
Lines servedGlasgow to Edinburgh via Falkirk Line
Stirling / Alloa / Dunblane Lines
Shotts Line
Carstairs Line
North Berwick Line
Cathcart Circle Lines
Cumbernauld Line
Inverclyde Line
Glasgow Central to Lanark
Edinburgh Waverley to Dunbar
Argyle Line
Specifications
Car body constructionAluminum double-skin[3]
Car length23 m (75 ft 5+12 in)[2]
Maximum speed100 mph (161 km/h)[2]
Traction system250 kW (335 hp) tandem motor with an IGBT converter/inverter[3]
Acceleration0.84 m/s2 (3.0 km/(h⋅s); 1.9 mph/s)[3]
Decelerationnormal: 1 m/s2 (3.6 km/(h⋅s); 2.2 mph/s)
emergency: 1.2 m/s2 (4.3 km/(h⋅s); 2.7 mph/s)[3]
Electric system(s)25 kV 50 Hz AC Overhead
Current collector(s)Pantograph
Braking system(s)Electronically controlled pneumatic brakes[3]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Notes/references
Sources : Rolling Stock overview
Except where noted

The British Rail Class 385 AT200[4] is a type of electric multiple unit built by Hitachi Rail for Abellio ScotRail. A total of 70 units have been built, divided into 46 three-car and 24 four-car sets. Based on the design of the Hitachi A-train, they are part of the Hitachi AT200 product family.[5][6]

The trains were built to operate services on newly electrified lines in the Central Belt on a mixture of both suburban and inter-urban routes. Having been ordered by Abellio ScotRail during April 2015, the first trainsets entered service during late July 2018. Their introduction was somewhat delayed due to the need for infrastructure works to be completed, as well as minor technical issues with the trainsets being uncovered. By December 2019, all 70 of the Class 385 trainsets had been delivered. Hitachi has proposed developing a battery electric multiple unit (BEMU) variant of the Class 385, allowing such a trainset to traverse lines that aren't electrified at present.

History

A Class 385 bodyshell being built by Hitachi at Kasado Works.

In October 2014, immediately after being awarded the ScotRail franchise, Abellio ScotRail announced it had concluded an agreement with the Japanese manufacturer Hitachi Rail to procure 234 new EMU carriages from its A-Train family for use on routes in Scotland that were being electrified.[7][2] During April 2015, a contract between Hitachi and Abellio ScotRail was signed, ordering 70 new-build trainsets at a cost of £475 million.[8] The trainsets, which are formed into a mix of three and four-car units, were procured for the purpose of operating along the main Glasgow to Edinburgh via Falkirk Line from December 2017,[9] and across Central Scotland.[10] In this manner, the electrification programme and purchase of new EMUs to operate services, will allow a subsequent cascade of the diesel multiple units currently used elsewhere on the network.[8][11]

The order for the new EMUs was the first operator-based purchase of a Hitachi product for use in the UK following the IEP procurement, and its subsequent construction of its new Hitachi Newton Aycliffe facility at Newton Aycliffe, England.[2] The bulk of the new fleet was constructed at Newton Aycliffe, while the first seven units were instead built at Hitachi's Kasado Works factory in Kudamatsu, Yamaguchi, Japan.[12] The trainsets were supplied to Abellio Scotrail through a leasing arrangement, which was formed at the time of the original order. Accordingly, the ownership of the fleet resides with Caledonian Rail Leasing Ltd., a subsidiary company of Sumitomo Mitsui Banking Corporation.[13]

While the Class 385 is a member of Hitachi's A-Train family, and accordingly shares much of its design elements with other members of the series, there are several distinct differences from its siblings.[2] Due to a requirement to support at-seat catering for all passengers, it was necessary to build the type with front-end corridor connection; this design alteration required considerable redesign of the driver's cab and forward section in order to obtain the desired functionality while conforming with standards on crashworthiness and driver ergonomics, particularly sighting. The University of Liverpool’s Virtual Engineering Centre consulted on the cab's design, while feedback from drivers and train crews was also sought throughout the process.[2] The Class 385 is limited to a maximum speed of 100 MPH in contrast to its peers; the traction systems are also optimised to their formation - while four-carriage trainsets feature two powered bogies under each end carriage, the three-carriage trainsets have one less powered bogie.[2]

During November 2015, construction of the first Class 385 units commenced, while the first units were delivered in December 2016.[14][5][15] The construction process in Newtown Aycliffe involved heavily defined processes, including 1,400 standard operating procedures, generated from experience at Hitachi’s Pistoia plant in Italy and Kasado factory in Japan.[2] The bodyshells, supplied by Kasado, were shipped to Newtown Aycliffe and subject to around seven days of static fitting out, after which they are moved throughout the production area via an internal transverser; each vehicle involved 2,100 manhours to complete. Roughly 71 percent of all components were sourced within the United Kingdom.[2]

An additional ten 3-car units were to be purchased if Transport Scotland exercised an option to extend Abellio ScotRail's contract from seven to 10 years; in this scenario, these were to have entered service in 2023.[16] However, the option was not taken up.[17]

During early 2019, Hitachi held a series of discussions with the Scottish Government on the development of a variant of the Class 385, a battery electric multiple unit (BEMU) that would be capable of running on unelectrified sections of line along a route.[18] The installation of batteries was reportedly described as being a relatively straightforward alteration to make; an underfloor battery unit, dependent upon size, would be able to power a trainset over distances of between 20 and 60 miles. The proposal drew upon Hitachi's existing experience with battery trains operated in Japan, and had been motivated by a recommendation by the rail decarbonisation task force that advocated for such measures to be implimented.[18]

Operations

385038 is at Alloa, the end of the route from Glasgow.
385020 at Glasgow Central station with a Shotts Line service to Edinburgh.

During early 2015, when the order for the Class 385 was placed, the fleet was expected to be declared operational around Autumn 2017.[8] However, issues were encountered that necessitated timetable changes. During February 2018, reports emerged that vision problems with the Class 385 had been encountered during testing; these were the attributed to the visibility and curvature of the driver windows, which are smaller than usual, leading to drivers seeing "two or three signals", when only one exists.[19][20][21] One month later, the fleet was reportedly experiencing software-related issues as well; these factors caused the type's entry into service to be further deferred to December 2018, although this was later rolled back due to progress made on the issue.[22] In February 2018, type approval testing was reportedly nearly complete.[23]

Having received remedial work, the first trainset was able to enter service on 24 July 2018.[11][2] Thereafter, further trainsets were promptly introduced. After the discovery of a critical issue, all units were briefly withdrawn on 4 October 2018,[24] the type re-entered service on 13 October 2018. By November 2018, ten Class 385s were diagrammed for service; this rose to 32 during the following month and to 58 by May 2019.[8] Due to the delayed entry into service of the Class 385, ScotRail hired ten Class 365 as an interim measure between 2018 and 2019; these were retained until sufficient new Class 385 units had attained sufficient operational readiness.[11]

By December 2019, all 70 of the Class 385 units had been brought into revenue service. These trainsets are operated upon the newly electrified Croy, Dunblane and Shotts lines, as well as replacing existing stock on the currently electrified Carstairs, Cathcart Circle Lines, Inverclyde Line plus Edinburgh to North Berwick[25] and Glasgow Central to Lanark services. The fleet's introduction allowed for the replacement of ScotRail's Class 314 fleet, along with the cascading of a number of Class 156, Class 158 and Class 170 units.[26][27]

This Class 385's introduction was accompanied by various timetable changes. One prominent service change was the widespread use of eight-coach trains on the Edinburgh to Glasgow main line, which necessitated the completion of platform extension work at Glasgow Queen Street Station.[8] A total of 546 passengers can be seated on an eight-coach Class 385 trainset, which represents a 45 per cent increase in seating over the six-coach Class 170 DMUs that had previously operated this service prior to the route's electrification. By April 2020, the Class 385 fleet had reportedly accumulated 8.5 million miles, 727,000 miles of which within a four-week window just prior to Christmas 2019.[8]

Unlike the majority of ScotRail's fleet, the Class 385 is maintained under a ten year contract with Hitachi; under this arrangement, management is based at the company's central planning contract office in Glasgow while the work is performed at the Craigentinny train maintenance centre.[8] The fleet is actively monitored by a team of maintenance controllers and riding inspectors, there is a heavy emphasis on delay attribution and fleet performance metrics, particularly for reoccurring issues. The Class 385 incorporates Hitachi's Fleet Monitoring Tool, which is intended to consolidate data collection in real time and make relevant data readily accessible to various stakeholders, including ScotRail and Network Rail.[8] Each trainset is subject to a balanced examination system, under which such inspections occur every 40 days or 20,000 miles, although considerations towards greater condition-based maintenance have been made. Early issues with subsystems such as the brakes, door setup and speed control unit have been mostly resolved via software-based measures.[8]

Fleet details

Class Operator No. Built Year Built Cars per Set Unit nos.
Class 385/0 Abellio ScotRail 46 2015–2019 3 385001–385046
Class 385/1 24 2015–2019 4 385101–385124



Abellio ScotRail Class 385/0
Abellio ScotRail Class 385/1

References

  1. ^ "Brand new ScotRail trains withdrawn over defective brakes". Edinburgh Evening News. JPMedia Publishing. 6 October 2018. Retrieved 10 August 2020.
  2. ^ a b c d e f g h i j k Milne, Andy (1 November 2017). "Building ScotRail's 385s". Rail Engineer.
  3. ^ a b c d e "Class 385". Hitachi. Archived from the original on 23 April 2019. Retrieved 23 April 2019.
  4. ^ Clinnick, Richard (30 October 2015). "Hitachi's new Scottish EMU construction starts next month". Rail Magazine. Retrieved 3 November 2015.
  5. ^ a b "AT200 for Scotland: 70 new trains for the upcoming ScotRail franchise". Hitachi Rail Europe. Archived from the original on 24 November 2015. Retrieved 3 November 2015.
  6. ^ "Class 385 for Scotland | Hitachi Rail EU". www.hitachirail-eu.com. Retrieved 18 May 2020.
  7. ^ "Hitachi to build ScotRail EMUs". Railway Gazette. 10 October 2014. Retrieved 3 November 2015.
  8. ^ a b c d e f g h i Shirres, David (3 April 2020). "Maintaining the 385s". Rail Engineer.
  9. ^ "ScotRail punctuality on the rise – but row over free travel".
  10. ^ "Electrification programme". Transport Scotland. Retrieved 3 November 2015.
  11. ^ a b c Shirres, David (24 July 2018). "Hitachi's Class 385s enters service". Rail Engineer.
  12. ^ "Kasado Works, Railway Systems Business Unit, Hitachi, Ltd.: Environmental Activities: Hitachi". www.hitachi.com.
  13. ^ "Abellio and Hitachi sign ScotRail train contract". Railway Gazette. 12 March 2015. Archived from the original on 23 April 2019. Retrieved 23 April 2019.
  14. ^ "ScotRail takes delivery of first new electric train". BBC News. 11 December 2016. Retrieved 13 December 2016.
  15. ^ "ScotRail's delayed new trains not now expected until March". www.scotsman.com.
  16. ^ "Scotrail Franchise Agreement" (PDF). Transport Scotland. Archived from the original (PDF) on 29 November 2015. Retrieved 23 December 2015.
  17. ^ "ScotRail franchise to end in 2022". Railway Gazette International. 19 December 2019.
  18. ^ a b Shirres, David (26 March 2019). "Hitachi plans to run ScotRail Class 385 EMUs beyond the wires". Rail Engineer.
  19. ^ "Safety worry over new ScotRail trains". BBC News. 12 February 2018. Retrieved 12 February 2018.
  20. ^ "Drivers of new ScotRail trains 'can't see signals'". www.scotsman.com. Retrieved 12 February 2018.
  21. ^ "Fish bowl vision problem scuppers plans for new trains". www.aslef.org.uk. Retrieved 12 February 2018.
  22. ^ Strachan, Graeme. ""Deeply disappointing" delay to introduction of new hourly rail service for Broughty Ferry and Angus". thecourier.co.uk.
  23. ^ Stacy, Mungo (7 February 2018). "On board ScotRail's new Class 385". Rail Engineer.
  24. ^ "New ScotRail trains taken out of service". 5 October 2018 – via www.bbc.co.uk.
  25. ^ The Railway Observer, March 2020. No. 1093, Volume 90. p. 171.
  26. ^ "Scotrail unveil £475m improvement plan". BBC News. 21 December 2015. Retrieved 22 December 2015.
  27. ^ "BRAND New Trains To Feature In Inverclyde As 40-Year-Old Units Sidelined". Inverclyde Now. 10 May 2019. Retrieved 6 June 2019. from 19 May, Class 314 units – which have attracted complaints from passengers over reliability and lack of facilities – are only scheduled to run on three early morning, Monday to Friday Gourock services ... New Class 385 trains will operate on some Gourock services.