Dinamo Stadium (2025): Difference between revisions
Appearance
Content deleted Content added
No edit summary |
No edit summary |
||
Line 13: | Line 13: | ||
| operator = [[FC Dinamo București|Dinamo București]] |
| operator = [[FC Dinamo București|Dinamo București]] |
||
| surface = Grass |
| surface = Grass |
||
| construction_cost = |
| construction_cost = €170 million |
||
| architect = |
| architect = |
||
| general_contractor= CNI |
| general_contractor= CNI |
Revision as of 15:29, 1 April 2024
![]() | |
Location | Bucharest, Romania |
---|---|
Coordinates | 44°27′29″N 26°6′11″E / 44.45806°N 26.10306°E |
Owner | Ministry of Internal Affairs |
Operator | Dinamo București |
Type | Soccer-specific stadium |
Capacity | 25,059 |
Surface | Grass |
Construction | |
Broke ground | 2024 |
Opened | 2025 |
Construction cost | €170 million |
General contractor | CNI |
Tenants | |
Dinamo București |
The New Dinamo Stadium is a proposed football stadium in Bucharest, Romania.[1]
The contract for the feasibility study was signed in September 2020. The works will last between 18 and 24 months. Initially CS Dinamo București handed over to CNI the location of the current velodrome for which the public procurement procedure was started.[2]