Jōetsu Shinkansen: Difference between revisions
Mention 260kph improvements, language may be cumbersome (I apologize) |
No edit summary |
||
Line 268: | Line 268: | ||
=== Future plans === |
=== Future plans === |
||
The entire line is currently being upgraded to {{Convert|275|km/h|mph|abbr=on}}, with construction starting in May 2019. The upgrades are scheduled to be completed by 2023.<ref>{{Cite web |title=上越新幹線スピードアップ工事に着手 最高速度275km/h、大宮~新潟間で7分程度短縮 |url=https://trafficnews.jp/post/85902 |access-date=2019-05-08 |website=乗りものニュース |language=ja}}</ref> Upgrades included improvements to the soundproofing system.<ref name=":0">{{Cite web |date=9 June 2022 |title=JR東日本,2023年春に上越新幹線(大宮—新潟間)の最高速度向上によるダイヤ変更を実施へ |trans-title=JR East to implement timetable change by improving maximum speed of Joetsu Shinkansen (between Omiya and Niigata) in spring 2023 |url=https://railf.jp/news/2022/06/09/080000.html |url-status=live |archive-url=https://web.archive.org/web/20220608235302/https://railf.jp/news/2022/06/09/080000.html |archive-date=8 June 2022 |access-date=9 June 2022 |website=Japan Railfan Magazine Online |language=ja}}</ref> This will mark the first time that an E7 series train has operated commercially at more than {{Convert|260|km/h|mph|abbr=on}}, which is the maximum speed of the only other line served by this train, the Hokuriku Shinkansen. As a result of the upgrades, all trainsets on the Joetsu Shinkansen will operate exclusively with E7 series trainsets and the travel time on the line is projected to be reduced by 7 minutes.<ref name=":0" /> The end of E2 series trainsets on Joetsu Shinkansen services is scheduled to take place on 18 March 2023, which is also the date of the implementation for the operating speed improvements.<ref>{{Cite web |date=16 December 2022 |title=JR東日本,3月18日にダイヤ改正を実施 |trans-title=JR East Implements Schedule Revision Effective 18 |
The entire line is currently being upgraded to {{Convert|275|km/h|mph|abbr=on}}, with construction starting in May 2019. The upgrades are scheduled to be completed by 2023.<ref>{{Cite web |title=上越新幹線スピードアップ工事に着手 最高速度275km/h、大宮~新潟間で7分程度短縮 |url=https://trafficnews.jp/post/85902 |access-date=2019-05-08 |website=乗りものニュース |language=ja}}</ref> Upgrades included improvements to the soundproofing system.<ref name=":0">{{Cite web |date=9 June 2022 |title=JR東日本,2023年春に上越新幹線(大宮—新潟間)の最高速度向上によるダイヤ変更を実施へ |trans-title=JR East to implement timetable change by improving maximum speed of Joetsu Shinkansen (between Omiya and Niigata) in spring 2023 |url=https://railf.jp/news/2022/06/09/080000.html |url-status=live |archive-url=https://web.archive.org/web/20220608235302/https://railf.jp/news/2022/06/09/080000.html |archive-date=8 June 2022 |access-date=9 June 2022 |website=Japan Railfan Magazine Online |language=ja}}</ref> This will mark the first time that an E7 series train has operated commercially at more than {{Convert|260|km/h|mph|abbr=on}}, which is the maximum speed of the only other line served by this train, the Hokuriku Shinkansen. As a result of the upgrades, all trainsets on the Joetsu Shinkansen will operate exclusively with E7 series trainsets and the travel time on the line is projected to be reduced by 7 minutes.<ref name=":0" /> The end of E2 series trainsets on Joetsu Shinkansen services is scheduled to take place on 18 March 2023, which is also the date of the implementation for the operating speed improvements.<ref>{{Cite web |date=16 December 2022 |title=JR東日本,3月18日にダイヤ改正を実施 |trans-title=JR East Implements Schedule Revision Effective 18 March 2023 |url=https://railf.jp/news/2022/12/16/181000.html |archive-url=http://web.archive.org/web/20221219021121/https://railf.jp/news/2022/12/16/181000.html |archive-date=19 December 2022 |access-date=19 December 2022 |website=Japan Railfan Magazine Online |language=ja}}</ref> |
||
==Special event train services== |
==Special event train services== |
Revision as of 03:10, 19 December 2022
Jōetsu Shinkansen | |||
---|---|---|---|
Overview | |||
Native name | 上越新幹線 | ||
Owner | JR East | ||
Locale | Tokyo; Saitama, Gunma, and Niigata Prefectures | ||
Termini | |||
Stations | 10 | ||
Service | |||
Type | Shinkansen | ||
Operator(s) | JR East | ||
Depot(s) | Niigata | ||
Rolling stock | E2/E7 series | ||
History | |||
Opened | 15 November 1982 | ||
Technical | |||
Line length | 269.5 km (167.5 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | 25 kV AC, 50 Hz, overhead catenary | ||
Operating speed | 240 km/h (150 mph) (older rolling stock); 275 km/h (170 mph) (under construction) | ||
|
The Jōetsu Shinkansen (上越新幹線) is a high-speed shinkansen railway line connecting Tokyo and Niigata, Japan, via the Tōhoku Shinkansen, operated by the East Japan Railway Company (JR East). Despite its name, the line does not pass through the city of Joetsu or the historical Jōetsu region, which instead are served by the Hokuriku Shinkansen. The name instead originates from the parallel Jōetsu Line, which in turn is named after the two provinces that it connects: Jōshū (an alternate name for Kōzuke Province which comprises today's Gunma Prefecture), and Echigo Province (modern day Niigata Prefecture).
Train services
- Toki, Tokyo - Niigata (limited-stop)
- Tanigawa, Tokyo - Echigo-Yuzawa (all-stations, since October 1997)
Discontinued services
- Asahi, Tokyo - Niigata (discontinued December 2002)
- Max Asahi, Tokyo - Niigata (discontinued December 2002)
- Max Toki, Tokyo - Niigata (discontinued October 2021)
- Max Tanigawa, Tokyo - Echigo-Yuzawa (discontinued October 2021)
Stations
Legend:
● | All trains stop |
---|---|
▲ | Some trains stop |
Station | Japanese | Distance (km) | Toki | Tanigawa | Transfers | Location | |
---|---|---|---|---|---|---|---|
Tokyo | 東京 | 0.0 km (0 mi) |
● | ● |
|
Chiyoda | Tokyo |
Ueno | 上野 | 3.6 | ▲ | ● | Taitō | ||
Ōmiya | 大宮 | 31.3 | ● | ● |
|
Ōmiya-ku, Saitama | Saitama Prefecture |
Kumagaya | 熊谷 | 67.9 | ▲ | ● | Kumagaya | ||
Honjō-Waseda | 本庄早稲田 | 88.0 | ▲ | ● | Honjō | ||
Takasaki | 高崎 | 108.6 | ▲ | ● | Takasaki | Gunma | |
Jōmō-Kōgen | 上毛高原 | 150.4 | ▲ | ● | Minakami | ||
Echigo-Yuzawa | 越後湯沢 | 182.7 | ▲ | ● | Yuzawa | Niigata | |
Urasa | 浦佐 | 212.3 | ▲ | Minamiuonuma | |||
Nagaoka | 長岡 | 245.1 | ▲ | Nagaoka | |||
Tsubame-Sanjō | 燕三条 | 268.7 | ▲ | Sanjō | |||
Niigata | 新潟 | 300.8 | ● |
|
Chūō-ku, Niigata |
- ^ a b Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.
- ^ Although the official terminus of the Joetsu Line is at Miyauchi, trains on the line run through to Nagaoka.
- ^ Although the official terminus of the Ban'etsu West Line is at Niitsu, most trains on the line run through to Niigata.
The Gala-Yuzawa Line is a 1.8 km (1.1 mi) branch from Echigo-Yuzawa to Gala-Yuzawa Station. It operates in the winter months only, serving the adjoining ski resort.
As of 2012, the maximum line speed is 110 km/h (70 mph) between Tokyo and Omiya, and 245 km/h (150 mph) between Omiya and Niigata. Additionally Tokyo bound trains have a higher limit of 275 km/h (170 mph) between Jōmō-Kōgen and Urasa.[1] Like all Shinkansen lines, the Jōetsu Shinkansen is standard gauge.
Rolling stock
As of October 2021[update], the following train types operate on Joetsu Shinkansen services.
- E2 series: Toki / Tanigawa (since January 2013)[2]
- E7 series : Toki / Tanigawa (since March 3, 2019)
Between fiscal 2018 and 2020, eleven 12-car E7 series train sets are scheduled to be introduced on Joetsu Shinkansen services, replacing the E4 series trains,[3] raising the speed from 240 km/h (150 mph) to 275 km/h (171 mph).[4]
-
An E2 series trainset
-
An E7 series trainset
Former rolling stock
- 200 series: Toki / Tanigawa (until March 2013)
- E1 series: Max Asahi / Max Toki / Max Tanigawa (until September 2012)
- E4 series: Max Toki / Max Tanigawa (until October 2021)
-
200 series on a Tanigawa service in January 2011
-
E1 series on a Max Asahi service in June 2002
-
An E4 series trainset on a Max Tanigawa service in February 2021
History
The program to build the new line was initiated in 1971 by Niigata-born prime minister Tanaka Kakuei; one popular anecdote is that Tanaka determined the line's routing by drawing it on a map with a red pencil.[5] Built at a cost of $6.3 billion,[6] it was built "to establish closer ties with Tokyo and promote regional development".[7]
Trial runs over the line began in November 1980, and regular service began on 15 November 1982. The line was initially planned to terminate at Shinjuku Station, but economic considerations pushed Japanese National Railways (JNR) to merge the line with the existing Tōhoku Shinkansen line at Ōmiya.
In September 1991, a 400 Series Shinkansen train set a Japanese rail speed record of 345 km/h (214 mph) on the Jōetsu Shinkansen line, and in December 1993, the STAR21 experimental train recorded 425 km/h (264 mph). The maximum speed for regular services on the line is 245 km/h (150 mph) except for the section between Jomo-Kogen and Urasa which is 275 km/h (170 mph) for E2 series trains travelling towards Niigata. The urban section between Tokyo and Ōmiya is 110 km/h (70 mph).[1]
The Basic Plan specifies that the Jōetsu Shinkansen should actually start from Shinjuku, which would necessitate building 30 km (19 mi) of additional Shinkansen track from Ōmiya. While some land acquisitions along the existing Saikyō Line were made, no construction ever started.[citation needed]
The Niigata prefectural government has proposed building a new multi-modal terminal to directly connect the Shinkansen to the port of Niigata, potentially allowing direct transfers to ferries and cruise ships, and to potentially allow direct access between the Shinkansen and Niigata Airport. However this plan is foreseen to be completed only by the mid-2040s.[8]
Future plans
The entire line is currently being upgraded to 275 km/h (171 mph), with construction starting in May 2019. The upgrades are scheduled to be completed by 2023.[9] Upgrades included improvements to the soundproofing system.[10] This will mark the first time that an E7 series train has operated commercially at more than 260 km/h (160 mph), which is the maximum speed of the only other line served by this train, the Hokuriku Shinkansen. As a result of the upgrades, all trainsets on the Joetsu Shinkansen will operate exclusively with E7 series trainsets and the travel time on the line is projected to be reduced by 7 minutes.[10] The end of E2 series trainsets on Joetsu Shinkansen services is scheduled to take place on 18 March 2023, which is also the date of the implementation for the operating speed improvements.[11]
Special event train services
On 17 November 2012, a special Joetsu Shinkansen 30th Anniversary (上越新幹線開業30周年号, Jōetsu Shinkansen Kaigyō 30-shūnen-gō) service ran as Toki 395 from Omiya to Niigata using 10-car 200 series set K47.[12]
Also on 17 November 2012, a special Joetsu Shinkansen 30th Anniversary (上越新幹線開業30周年号, Jōetsu Shinkansen Kaigyō 30-shūnen-gō) service ran from Niigata to Tokyo using E5 series set U8, with a special ceremony at Niigata Station before departure.[13][14] This was the first revenue-earning service operated on the Joetsu Shinkansen by an E5 series trainset.[14]
See also
References
- ^ a b "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine. Vol. 52, no. 612. Japan: Kōyūsha Co., Ltd. April 2012. p. 14.
- ^ E2系車両を上越新幹線に投入! [E2 series trains to be introduced on Joetsu Shinkansen] (PDF). News Release (in Japanese). Japan: East Japan Railway Company. 16 November 2012. Archived from the original (PDF) on 19 November 2012. Retrieved 16 November 2012.
- ^ 上越新幹線へE7系投入 [E7 series to be introduced on Joetsu Shinkansen]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 April 2017. Archived from the original on 4 April 2017. Retrieved 4 April 2017.
- ^ "JR East prepares for 275km/H operation on Joetsu Shinkansen". 9 May 2019.
- ^ "実に地球300周…雪国駆けた「丸顔の美人」 さらば新幹線200系". MSN Sankei News. 15 March 2013. Archived from the original on 1 February 2014. Retrieved 20 January 2014.
最後の活躍の舞台となった上越新幹線。その誕生には、田中角栄元首相が赤鉛筆で線を引きルートを決めたとの逸話も残る。
- ^ Hayes, Louis D. Introduction to Japanese Politics, p.107.
- ^ Takashima, Shuichi. Railway Operators in Japan 3: Tohoku and Niigata Region Archived 2008-11-20 at the Wayback Machine. Japan Railway & Transport Review No. 29 (pp.40–49)
- ^ 新潟の西港区に新幹線、 県が30年後構想. Nihon Keizai Shimbun. 16 April 2014. Retrieved 16 April 2014.
- ^ "上越新幹線スピードアップ工事に着手 最高速度275km/h、大宮~新潟間で7分程度短縮". 乗りものニュース (in Japanese). Retrieved 8 May 2019.
- ^ a b "JR東日本,2023年春に上越新幹線(大宮—新潟間)の最高速度向上によるダイヤ変更を実施へ" [JR East to implement timetable change by improving maximum speed of Joetsu Shinkansen (between Omiya and Niigata) in spring 2023]. Japan Railfan Magazine Online (in Japanese). 9 June 2022. Archived from the original on 8 June 2022. Retrieved 9 June 2022.
- ^ "JR東日本,3月18日にダイヤ改正を実施" [JR East Implements Schedule Revision Effective 18 March 2023]. Japan Railfan Magazine Online (in Japanese). 16 December 2022. Archived from the original on 19 December 2022. Retrieved 19 December 2022.
- ^ "とき"395号「上越新幹線開業30周年記念号」運転 [Toki 395 "Joetsu Shinkansen 30th Anniversary"]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 18 November 2012. Retrieved 18 November 2012.
- ^ おかげさまで上越新幹線開業30周年 [Joetsu Shinkansen 30th Anniversary Celebrations] (PDF) (in Japanese). Japan: East Japan Railway Company, Niigata Division. 12 September 2012. Archived from the original (PDF) on 20 September 2012. Retrieved 15 September 2012.
- ^ a b "団体臨時列車「上越新幹線開業30周年記念号」,E5系で運転" [Special "Joetsu Shinkansen 30th Anniversary" runs using E5 series]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 18 November 2012. Retrieved 18 November 2012.
External links
- JR East website (in Japanese)