D35 motorway (Czech Republic): Difference between revisions
Appearance
Content deleted Content added
M97uzivatel (talk | contribs) →Under construction: Opatoice-Časy opened |
M97uzivatel (talk | contribs) No edit summary |
||
Line 6: | Line 6: | ||
| map = Motorway D35-CZ map.svg |
| map = Motorway D35-CZ map.svg |
||
| map_notes = [[File:CZ traffic sign IS17 - E442.svg|40px|E442]][[Image:CZ traffic sign IS17 - E462.svg|40px|E462]] |
| map_notes = [[File:CZ traffic sign IS17 - E442.svg|40px|E442]][[Image:CZ traffic sign IS17 - E462.svg|40px|E462]] |
||
| length_km = |
| length_km = 76 |
||
| length_notes = Planned: {{convert| |
| length_notes = Planned: {{convert|197|km|mi|abbr=on}} |
||
| terminus_a = [[File:CZ traffic sign IS16a - D1.svg|20px]] [[D1 motorway (Czech Republic)|D1]] near [[Lipník nad Bečvou]]<br />{{Coord|50|26|27.36|N|15|26|43.27|E|display=inline}} |
| terminus_a = [[File:CZ traffic sign IS16a - D1.svg|20px]] [[D1 motorway (Czech Republic)|D1]] near [[Lipník nad Bečvou]]<br />{{Coord|50|26|27.36|N|15|26|43.27|E|display=inline}} |
||
| junction = [[File:CZ traffic sign IS16a - D55.svg|20px]] [[D55 motorway (Czech Republic)|D55]] near [[Olomouc]] (planned) |
| junction = [[File:CZ traffic sign IS16a - D55.svg|20px]] [[D55 motorway (Czech Republic)|D55]] near [[Olomouc]] (planned) |
Revision as of 16:45, 16 December 2021
This article needs additional citations for verification. (August 2008) |
D35 Motorway | |
---|---|
Dálnice D35 | |
Route information | |
Length | 76 km (47 mi) Planned: 197 km (122 mi) |
Major junctions | |
From | D1 near Lipník nad Bečvou 50°26′27.36″N 15°26′43.27″E / 50.4409333°N 15.4453528°E |
D55 near Olomouc (planned)
D46 near Olomouc
D10 near Turnov (planned) | |
To | Liberec (in the future Zittau) 49°32′47.66″N 17°33′43.15″E / 49.5465722°N 17.5619861°E |
Location | |
Country | Czech Republic |
Regions | Olomouc, Pardubice, Hradec Králové, Liberec |
Major cities | Olomouc, Hradec Králové, Liberec |
Highway system | |
D35 motorway (Czech: Dálnice D35), formerly Expressway R35 (Czech: Rychlostní silnice R35) is a highway in the Czech Republic. If completed, it will be second longest highway in Czech Republic, running from Úlibice to the D1 at Lipník nad Bečvou.[1] After completion it will become alternative route to motorway D1 between Prague and Olomouc and Ostrava. The first segment was opened in the 1970s.
As of 2018[update] 63 km of full motorway are in operation in two segments.[2]
Under construction
Section | Length | Start of construction | Completion |
---|---|---|---|
Časy – Ostrov | 14,5 km | 12/2018 | planned 08/2022[3] |
Images
-
Highway D35 near Olomouc.
-
D35 near Opatovice nad Labem
References
- ^ "Planned construction progress on the road and motorway network" (PDF). Road and Motorway Directorate of the Czech Republic. Retrieved 21 October 2018.
- ^ "Dálnice D35 (only CZ)".
{{cite web}}
: CS1 maint: url-status (link) - ^ https://mapapp.rsd.cz/Upload/Stavby/61/infoletak_d35-casy-ostrov.pdf.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link)
External links
- Info on motorway.cz (in English)
- Info on ceskedalnice.cz (in Czech)
- Info on dalnice-silnice.cz (in Czech)
- Ecology vs. R 35 (in Czech)