Zhengzhou–Jiaozuo intercity railway: Difference between revisions
No edit summary |
m terminii->termini - Fix a typo in one click |
||
Line 53: | Line 53: | ||
}} |
}} |
||
[[File:Central Plains MIR map.png|thumb|right|Zhengzhou–Jiaozuo intercity railway is indicated by the light blue line]] |
[[File:Central Plains MIR map.png|thumb|right|Zhengzhou–Jiaozuo intercity railway is indicated by the light blue line]] |
||
'''Zhengzhou–Jiaozuo intercity railway''', or '''Zhengjiao intercity railway''', is [[Regional rail|regional]] [[higher-speed rail]]way radiating out of [[Zhengzhou]], the capital of [[Henan]] province, linking Zhengzhou with the city of [[Jiaozuo]]. Construction was started on December 29, 2009, and was completed by April 5, 2015. Testing commenced in May 2015<ref>{{cite news|url=http://news.dahe.cn/2015/04-07/104714392.html |script-title=zh:郑焦城际铁路5月试运营 设7个站点全长70.3公里|publisher=[[Dahe Daily]]}}</ref> before being officially opened on June 26, 2015.<ref>{{cite news|url=http://news.dahe.cn/2015/06-25/105157597.html |script-title=zh:郑焦城铁明日开通 今天中午开始售票 首班车7时15分|publisher=[[Dahe Daily]]|date=2015-06-25|access-date=2015-06-25}}</ref> Total journey time between the two |
'''Zhengzhou–Jiaozuo intercity railway''', or '''Zhengjiao intercity railway''', is [[Regional rail|regional]] [[higher-speed rail]]way radiating out of [[Zhengzhou]], the capital of [[Henan]] province, linking Zhengzhou with the city of [[Jiaozuo]]. Construction was started on December 29, 2009, and was completed by April 5, 2015. Testing commenced in May 2015<ref>{{cite news|url=http://news.dahe.cn/2015/04-07/104714392.html |script-title=zh:郑焦城际铁路5月试运营 设7个站点全长70.3公里|publisher=[[Dahe Daily]]}}</ref> before being officially opened on June 26, 2015.<ref>{{cite news|url=http://news.dahe.cn/2015/06-25/105157597.html |script-title=zh:郑焦城铁明日开通 今天中午开始售票 首班车7时15分|publisher=[[Dahe Daily]]|date=2015-06-25|access-date=2015-06-25}}</ref> Total journey time between the two termini is 40 minutes.<ref>{{cite news|url=http://news.dahe.cn/2015/06-25/105157597.html |script-title=zh:郑焦城铁明日开通 今天中午开始售票 首班车7时15分 |publisher=[[Dahe Daily]]}}</ref> It is {{convert|77.786|km|mi|0|abbr=on}} long, of which {{convert|9.648|km|mi|0|abbr=on}} is shared with the [[Beijing–Guangzhou railway]] and {{convert|68.138|km|mi|0|abbr=on}} of new trackage. It was jointly funded by the Henan Provincial Government and the now defunct [[Ministry of Railways (China)|Ministry of Railways]]. |
||
At its northern terminus, Jiaozuo, the line continues as the [[Taiyuan–Jiaozuo high-speed railway]] (opened December 2020). |
At its northern terminus, Jiaozuo, the line continues as the [[Taiyuan–Jiaozuo high-speed railway]] (opened December 2020). |
Revision as of 22:11, 19 October 2021
Zhengzhou–Jiaozuo intercity railway 郑焦城际铁路 | |
---|---|
Overview | |
Status | Operational |
Owner | China Railway |
Locale | Henan |
Termini | |
Stations | 7 |
Service | |
Type | Higher-speed rail |
System | Central Plains MIR |
Operator(s) | CR Zhengzhou |
Rolling stock | CRH6A |
History | |
Opened | June 26, 2015 |
Technical | |
Line length | 77.786 km (48 mi) |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Operating speed | 200 km/h (124 mph) |
Zhengzhou-Jiaozuo intercity railway | |||||||
---|---|---|---|---|---|---|---|
Simplified Chinese | 郑焦城际铁路 | ||||||
Traditional Chinese | 鄭焦城際鐵路 | ||||||
|
Zhengzhou–Jiaozuo intercity railway, or Zhengjiao intercity railway, is regional higher-speed railway radiating out of Zhengzhou, the capital of Henan province, linking Zhengzhou with the city of Jiaozuo. Construction was started on December 29, 2009, and was completed by April 5, 2015. Testing commenced in May 2015[1] before being officially opened on June 26, 2015.[2] Total journey time between the two termini is 40 minutes.[3] It is 77.786 km (48 mi) long, of which 9.648 km (6 mi) is shared with the Beijing–Guangzhou railway and 68.138 km (42 mi) of new trackage. It was jointly funded by the Henan Provincial Government and the now defunct Ministry of Railways.
At its northern terminus, Jiaozuo, the line continues as the Taiyuan–Jiaozuo high-speed railway (opened December 2020).
Stations
Station code |
Station name | Connections | Location | City | |
---|---|---|---|---|---|
English | Chinese | ||||
ZZF | Template:CR stations | 郑州 | 1 | Erqi | Zhengzhou |
HTF | Template:CR stations | Jinshui | |||
NYF | Template:CR stations | 南阳寨 | Huiji | ||
HCF | Template:CR stations | 黄河景区 | |||
WIF | Template:CR stations | 武陟 | Wuzhi | Jiaozuo | |
EXF | Template:CR stations | 修武西 | Xiuwu | ||
JOF | Template:CR stations | 焦作 | Jiefang | ||
References
- ^ 郑焦城际铁路5月试运营 设7个站点全长70.3公里. Dahe Daily.
- ^ 郑焦城铁明日开通 今天中午开始售票 首班车7时15分. Dahe Daily. 2015-06-25. Retrieved 2015-06-25.
- ^ 郑焦城铁明日开通 今天中午开始售票 首班车7时15分. Dahe Daily.