D35 motorway (Czech Republic): Difference between revisions
M97uzivatel (talk | contribs) No edit summary |
Stub removed |
||
(10 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Motorway in the Czech Republic}} |
|||
{{more citations needed|date=August 2008}} |
{{more citations needed|date=August 2008}} |
||
{{expand Czech|date=March 2024|topic=transp}} |
|||
{{Infobox road |
{{Infobox road |
||
| country = CZE |
| country = CZE |
||
Line 5: | Line 7: | ||
| route = 35 |
| route = 35 |
||
| map = Motorway D35-CZ map.svg |
| map = Motorway D35-CZ map.svg |
||
| map_notes = [[File:CZ traffic sign IS17 - E442.svg|40px|E442]][[Image:CZ traffic sign IS17 - E462.svg|40px|E462]] |
|||
| length_km = 89 |
| length_km = 89 |
||
| length_notes = Planned: {{convert|205|km|mi|abbr=on}} |
| length_notes = Planned: {{convert|205|km|mi|abbr=on}} |
||
| terminus_a = [[Úlibice]] |
|||
| terminus_a = [[File:CZ traffic sign IS16a - D1.svg|20px]] [[D1 motorway (Czech Republic)|D1]] near [[Lipník nad Bečvou]]<br />{{Coord|50|26|27.36|N|15|26|43.27|E|display=inline}} |
|||
| junction = |
|||
| junction = [[File:CZ traffic sign IS16a - D55.svg|20px]] [[D55 motorway (Czech Republic)|D55]] near [[Olomouc]] (planned) |
|||
*{{jct|country=CZE|D|55}} near [[Olomouc]] (planned) |
|||
[[File:CZ traffic sign IS16a - D46.svg|20px]] [[D46 motorway (Czech Republic)|D46]] near [[Olomouc]] |
|||
*{{jct|country=CZE|D|46}} near [[Olomouc]] |
|||
<br>[[File:CZ traffic sign IS16a - D43.svg|20px]] [[R43 expressway (Czech Republic)|D43]] (planned) |
|||
*{{jct|country=CZE|D|43}} (planned) |
|||
<br>[[File:CZ traffic sign IS16a - D11.svg|20px]] [[D11 motorway (Czech Republic)|D11]] near [[Hradec Králové]] |
|||
*{{jct|country=CZE|D|11}} near [[Hradec Králové]] |
|||
<br>[[File:CZ traffic sign IS16a - D10.svg|20px]] [[D10 motorway (Czech Republic)|D10]] near [[Turnov]] (planned) |
|||
*{{jct|country=CZE|D|10}} near [[Turnov]] (planned) |
|||
| terminus_b = [[Liberec]] (in the future [[Zittau]])<br />{{Coord|49|32|47.66|N|17|33|43.15|E|display=inline}} |
|||
| terminus_b = {{jct|country=CZE|D|1}} at [[Lipník nad Bečvou]] |
|||
| regions = [[Olomouc Region|Olomouc]], [[Pardubice Region|Pardubice]], [[Hradec Králové Region|Hradec Králové]], [[Liberec Region|Liberec]] |
| regions = [[Olomouc Region|Olomouc]], [[Pardubice Region|Pardubice]], [[Hradec Králové Region|Hradec Králové]], [[Liberec Region|Liberec]] |
||
| cities = [[Olomouc]], [[Hradec Králové]], [[Liberec]] |
| cities = [[Olomouc]], [[Hradec Králové]], [[Liberec]] |
||
| e-road = {{jct|country=CZE|E|442}}{{jct|country=CZE|E|462}} |
|||
}} |
}} |
||
'''D35 motorway''' ({{lang-cs|Dálnice D35}}), formerly '''Expressway R35''' ({{lang-cs|Rychlostní silnice R35}}) is a [[highway]] in the [[Czech Republic]]. Once completed, it will be the second longest highway in Czech Republic, running from [[Úlibice]] to the [[D1 motorway (Czech Republic)|D1]] at [[Lipník nad Bečvou]].<ref>{{Cite web |url=https://www.rsd.cz/wps/wcm/connect/7f0f7792-9185-45c3-beb5-661fa2c7e198/rsd-mapa-vystavba-2018-02-01_en_web.pdf?MOD=AJPERES |title=Planned construction progress on the road and motorway network |publisher=[[Road and Motorway Directorate of the Czech Republic]] |access-date=21 October 2018}}</ref> |
'''D35 motorway''' ({{lang-cs|Dálnice D35}}), formerly '''Expressway R35''' ({{lang-cs|Rychlostní silnice R35}}) is a [[highway]] in the [[Czech Republic]]. Once completed, it will be the second longest highway in Czech Republic, running from [[Úlibice]] to the [[D1 motorway (Czech Republic)|D1]] at [[Lipník nad Bečvou]].<ref>{{Cite web |url=https://www.rsd.cz/wps/wcm/connect/7f0f7792-9185-45c3-beb5-661fa2c7e198/rsd-mapa-vystavba-2018-02-01_en_web.pdf?MOD=AJPERES |title=Planned construction progress on the road and motorway network |publisher=[[Road and Motorway Directorate of the Czech Republic]] |access-date=21 October 2018}}</ref> The motorway is part of the [[European route E442]]. |
||
{{As of|2023}} 89 km of full motorway are in operation in two segments.<ref>{{Cite web|last=|first=|date=|title=Dálnice D35 (only CZ)|url=http://www.ceskedalnice.cz/dalnice/d35/|url-status=live|archive-url=https://web.archive.org/web/20151227070238/http://www.ceskedalnice.cz/dalnice/d35 |archive-date=2015-12-27 |access-date=|website=}}</ref> |
After completion, it will become an alternative route to [[D1 motorway (Czech Republic)|motorway D1]] between Prague and [[Olomouc]] and [[Ostrava]]. The first segment was opened in the 1970s. {{As of|2023}}, 89 km of full motorway are in operation in two segments.<ref>{{Cite web|last=|first=|date=|title=Dálnice D35 (only CZ)|url=http://www.ceskedalnice.cz/dalnice/d35/|url-status=live|archive-url=https://web.archive.org/web/20151227070238/http://www.ceskedalnice.cz/dalnice/d35 |archive-date=2015-12-27 |access-date=|website=}}</ref> |
||
==History== |
|||
Originally, the D35 motorway from [[Hradec Králové]] to [[Lipník nad Bečvou]] was planned. However, in 1987, it was decided to build the R35 expressway instead of the motorway and to extend its route to Liberec. The rest of the R35 expressway is classified as a Class I road for motor vehicles. |
|||
Currently, the section of the D35 motorway [[Mohelnice]] - [[Olomouc]] - [[Lipník nad Bečvou]] is in operation with a break near [[Křelov]] near [[Olomouc]]. A section of the former R35 [[Liberec]] - [[Turnov]] expressway is also in operation, but it has not been classified as a motorway and since 1 January 2016 has been an I/35 motorway. |
|||
On 27 November 2009, the section Sedlice - Opatovice nad Labem was put into operation with a length of approximately 3.5 km. The three-storey Opatovice interchange is one of the largest intersections in the Czech Republic. Around Hradec Králové, the D35 runs in parallel with the D11 motorway (between the Sedlice interchange and the Plotiště interchange), with the last of the interchange sections completed in December 2021. |
|||
In December 2021, the Opatovice nad Labem - Časy section of the motorway was put into operation. This, together with the opening of other sections of the D11 motorway, enabled the transfer of transit from [[Svitavy]] in the direction of [[Prague]], [[Jičín]] and [[Jaroměř]] outside [[Hradec Králové]]. The connecting section to Ostrov was opened a year later, in December 2022. |
|||
== Under construction == |
== Under construction == |
||
{| class="wikitable sortable" |
|||
!Section |
|||
!Length |
|||
!Start of construction |
|||
!Completion |
|||
|- |
|||
|[[Hořice]] - [[Sadová]] |
|||
|10.45 km |
|||
|11/2023 |
|||
|planned 2025 |
|||
|- |
|||
|[[Ostrov (Chrudim District)|Ostrov]] - [[Vysoké Mýto]] |
|||
|7.0 km |
|||
|05/2024 |
|||
|planned 2026 |
|||
|- |
|||
|[[Ostrov (Chrudim District)|Ostrov]] - [[Vysoké Mýto]], Homole tunnel |
|||
|0.53-0.57 km |
|||
|05/2024 |
|||
|planned 2026 |
|||
|- |
|||
|[[Vysoké Mýto]] - [[Džbánov]] |
|||
|5.95 km |
|||
|11/2023 |
|||
|planned 2025 |
|||
|- |
|||
|[[Džbánov]] - [[Litomyšl]] |
|||
|7.95 km |
|||
|04/2024 |
|||
|planned 2027 |
|||
|- |
|||
|[[Janov (Svitavy District)|Janov]] - [[Opatovec]] |
|||
|11.75 km |
|||
|05/2023 |
|||
|planned 12/2025 |
|||
|} |
|||
==Images== |
==Images== |
||
Line 46: | Line 95: | ||
[[Category:Motorways in the Czech Republic|R35]] |
[[Category:Motorways in the Czech Republic|R35]] |
||
[[Category:Proposed roads in the Czech Republic]] |
[[Category:Proposed roads in the Czech Republic]] |
||
{{CzechRepublic-road-stub}} |
Latest revision as of 15:25, 30 October 2024
This article needs additional citations for verification. (August 2008) |
You can help expand this article with text translated from the corresponding article in Czech. (March 2024) Click [show] for important translation instructions.
|
D35 Motorway | |
---|---|
Dálnice D35 | |
Route information | |
Part of E442 E462 | |
Length | 89 km (55 mi) Planned: 205 km (127 mi) |
Major junctions | |
From | Úlibice |
To | D 1 at Lipník nad Bečvou |
Location | |
Country | Czech Republic |
Regions | Olomouc, Pardubice, Hradec Králové, Liberec |
Major cities | Olomouc, Hradec Králové, Liberec |
Highway system | |
D35 motorway (Czech: Dálnice D35), formerly Expressway R35 (Czech: Rychlostní silnice R35) is a highway in the Czech Republic. Once completed, it will be the second longest highway in Czech Republic, running from Úlibice to the D1 at Lipník nad Bečvou.[1] The motorway is part of the European route E442.
After completion, it will become an alternative route to motorway D1 between Prague and Olomouc and Ostrava. The first segment was opened in the 1970s. As of 2023[update], 89 km of full motorway are in operation in two segments.[2]
History
[edit]Originally, the D35 motorway from Hradec Králové to Lipník nad Bečvou was planned. However, in 1987, it was decided to build the R35 expressway instead of the motorway and to extend its route to Liberec. The rest of the R35 expressway is classified as a Class I road for motor vehicles.
Currently, the section of the D35 motorway Mohelnice - Olomouc - Lipník nad Bečvou is in operation with a break near Křelov near Olomouc. A section of the former R35 Liberec - Turnov expressway is also in operation, but it has not been classified as a motorway and since 1 January 2016 has been an I/35 motorway.
On 27 November 2009, the section Sedlice - Opatovice nad Labem was put into operation with a length of approximately 3.5 km. The three-storey Opatovice interchange is one of the largest intersections in the Czech Republic. Around Hradec Králové, the D35 runs in parallel with the D11 motorway (between the Sedlice interchange and the Plotiště interchange), with the last of the interchange sections completed in December 2021.
In December 2021, the Opatovice nad Labem - Časy section of the motorway was put into operation. This, together with the opening of other sections of the D11 motorway, enabled the transfer of transit from Svitavy in the direction of Prague, Jičín and Jaroměř outside Hradec Králové. The connecting section to Ostrov was opened a year later, in December 2022.
Under construction
[edit]Section | Length | Start of construction | Completion |
---|---|---|---|
Hořice - Sadová | 10.45 km | 11/2023 | planned 2025 |
Ostrov - Vysoké Mýto | 7.0 km | 05/2024 | planned 2026 |
Ostrov - Vysoké Mýto, Homole tunnel | 0.53-0.57 km | 05/2024 | planned 2026 |
Vysoké Mýto - Džbánov | 5.95 km | 11/2023 | planned 2025 |
Džbánov - Litomyšl | 7.95 km | 04/2024 | planned 2027 |
Janov - Opatovec | 11.75 km | 05/2023 | planned 12/2025 |
Images
[edit]-
Highway D35 near Olomouc.
-
D35 near Opatovice nad Labem
References
[edit]- ^ "Planned construction progress on the road and motorway network" (PDF). Road and Motorway Directorate of the Czech Republic. Retrieved 21 October 2018.
- ^ "Dálnice D35 (only CZ)". Archived from the original on 2015-12-27.
External links
[edit]- Info on motorway.cz (in English)
- Info on ceskedalnice.cz (in Czech)
- Info on dalnice-silnice.cz Archived 2016-02-24 at the Wayback Machine (in Czech)
- Ecology vs. R 35 (in Czech)