Guntur–Tenali section: Difference between revisions
Appearance
Content deleted Content added
No edit summary |
Adding short description: "Indian rail section" |
||
(25 intermediate revisions by 15 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Indian rail section}} |
|||
{{Use dmy dates|date=January 2016}} |
{{Use dmy dates|date=January 2016}} |
||
{{Use Indian English|date=January 2016}} |
{{Use Indian English|date=January 2016}} |
||
Line 18: | Line 19: | ||
| stations = |
| stations = |
||
| routes = |
| routes = |
||
| |
| daily_ridership = |
||
| open = 1916 |
| open = 1916 |
||
| close = |
| close = |
||
| owner |
| owner = [[Indian Railways]] |
||
| operator = [[South |
| operator = [[South Coast Railway zone|South Coast Railway]] |
||
| character = |
| character = |
||
| depot = |
| depot = |
||
| stock = |
| stock = |
||
| linelength = {{convert| |
| linelength = {{convert|25.47|km|mi|abbr=on}} |
||
| tracklength = |
| tracklength = |
||
| |
| tracks = 2 |
||
| gauge = {{ |
| gauge = {{Track gauge|5ft6in|lk=on}} [[broad gauge]] |
||
| |
| old_gauge = |
||
| minradius = |
| minradius = |
||
| racksystem = |
| racksystem = |
||
| electrification = Yes |
|||
| el = |
|||
| speed = |
| speed = |
||
| elevation = |
| elevation = |
||
| website = |
| website = |
||
| map = {{Guntur–Tenali section}} |
| map = {{Guntur–Tenali section}} |
||
| map_name = Route map |
|||
| map_state = collapsed |
| map_state = collapsed |
||
}} |
}} |
||
The '''Guntur–Tenali section''' connects {{ |
The '''Guntur–Tenali section''' connects {{stnlnk|Guntur}} and {{stnlnk|Tenali}} of [[Guntur district]] in the [[Indian state]] of [[Andhra Pradesh]]. It intersects [[Howrah–Chennai main line]] at {{stnlnk|Tenali}}.<ref>{{Cite news|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/trackdoubling-work-will-begin-in-six-months-official/article2475308.ece|title=Track-doubling work will begin in six months: official|date=2011-09-22|newspaper=The Hindu|issn=0971-751X|access-date=2016-05-04}}</ref> The section is an electrified [[double-track railway]], with the second line opened on 26 April 2019.<ref>{{cite news |last1=Bommakanti |first1=Ujwal |title=Refurbished Guntur–Tenali railway line starts its 'electrifying' journey|url=https://timesofindia.indiatimes.com/city/vijayawada/refurbished-guntur-tenali-railway-line-starts-its-electrifying-journey/articleshow/69064404.cms |access-date=29 April 2019 |work=The Times of India |date=27 April 2019 }}</ref> |
||
== History == |
== History == |
||
⚫ | Guntur–Tenali section, a part of Guntur–Repalle broad gauge project was opened in 1916, which was then owned by [[Madras and Southern Mahratta Railway]].<ref>{{cite web|url=http://scrailways.blogspot.in/2012/01/time-line-and-milestones-of-events-scr.html?m=1|title=Mile stones in SCR}}</ref> |
||
⚫ | Guntur–Tenali section, a part of |
||
== Jurisdiction == |
== Jurisdiction == |
||
The section covers a total length of {{Convert| |
The section covers a total length of {{Convert|25.47|km|abbr=on}} and is administered under [[Guntur railway division]], excluding {{stnlnk|Tenali}} which falls under [[Vijayawada railway division]] of [[South Central Railway zone]].<ref name="map">{{Cite web|url=https://scr.indianrailways.gov.in/cris//uploads/files/1540210612510-SCR-sysmapA1_2018.pdf|title=SCR Railway Map 2018|website=South Central Railway|access-date=23 April 2019}}</ref> |
||
==References== |
== References == |
||
{{reflist}} |
{{reflist}} |
||
Line 60: | Line 58: | ||
[[Category:Guntur railway division|*]] |
[[Category:Guntur railway division|*]] |
||
[[Category:1916 establishments in India]] |
[[Category:1916 establishments in India]] |
||
[[Category: |
[[Category:5 ft 6 in gauge railways in India]] |
||
[[Category:Railway lines opened in 1916]] |
Latest revision as of 18:32, 28 February 2024
Guntur–Tenali section | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Indian Railways | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Andhra Pradesh | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | South Coast Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1916 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 25.47 km (15.83 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 5 ft 6 in (1,676 mm) broad gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Yes | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Guntur–Tenali section connects Guntur and Tenali of Guntur district in the Indian state of Andhra Pradesh. It intersects Howrah–Chennai main line at Tenali.[1] The section is an electrified double-track railway, with the second line opened on 26 April 2019.[2]
History
[edit]Guntur–Tenali section, a part of Guntur–Repalle broad gauge project was opened in 1916, which was then owned by Madras and Southern Mahratta Railway.[3]
Jurisdiction
[edit]The section covers a total length of 25.47 km (15.83 mi) and is administered under Guntur railway division, excluding Tenali which falls under Vijayawada railway division of South Central Railway zone.[4]
References
[edit]- ^ "Track-doubling work will begin in six months: official". The Hindu. 22 September 2011. ISSN 0971-751X. Retrieved 4 May 2016.
- ^ Bommakanti, Ujwal (27 April 2019). "Refurbished Guntur–Tenali railway line starts its 'electrifying' journey". The Times of India. Retrieved 29 April 2019.
- ^ "Mile stones in SCR".
- ^ "SCR Railway Map 2018" (PDF). South Central Railway. Retrieved 23 April 2019.