The Dhaka Metro Rail (Bengali: ঢাকা মেট্রোরেল), or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital and largest city of Bangladesh. It is operated by the Dhaka Mass Transit Company Limited (DMTCL).[2] Together with the under construction Dhaka BRT, proposed Dhaka Subway and Dhaka suburban circular rail, it is expected to reduce traffic congestion in the city. The metro rail network has five planned lines which are the MRT Line 6, the only operational line, MRT Line 1 and MRT line 5, which are under construction, and MRT Line 2 and MRT Line 4, which are in the planning stages. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority (DTCA).[7][8]
Dhaka Metro Rail | |
---|---|
Overview | |
Native name | ঢাকা মেট্রোরেল |
Owner | Road Transport and Highways Division |
Locale | Greater Dhaka, Bangladesh |
Transit type | Mass Rapid Transit |
Number of lines |
|
Line number | Operational: Ongoing projects: Approved: Planned: |
Number of stations | 16 (operational),[1] 103 (planned)[2] See Network |
Daily ridership | est. 290,000 |
Key people |
|
Headquarters | Probashi Kallyan Bhaban (Level-14), 71,72, Old Elephant Road, Eskaton Garden, Ramna, Dhaka-1000 [4] |
Website | www |
Operation | |
Began operation | 29 December 2022 |
Operator(s) | Dhaka Mass Transit Company Limited |
Number of vehicles | MRT 6: 12 pairs of trains (total 24 trains)[5] |
Train length | 6 coaches |
Technical | |
System length | 20.1 km (12.5 mi) |
Track gauge | Standard gauge |
Electrification | 1500V DC via Overhead (Elevated)
|
Average speed | 30 km/h (19 mph)[6] |
Top speed | 100 km/h (62 mph)[6] |
The first section of MRT Line 6 commenced commercial operations on 29 December 2022 and the second section on 5 November 2023. The other lines are either in planning or under construction.[9][10] The third phase, which will have an interchange with Line 1, Line 2 and Line 4, is set to be completed by 2026.[11][12][13] Further expansion of MRT Line 6 is expected towards Savar Upazila and Tongi. Passengers will get a 10% discount on the fare for using the MRT Pass or Rapid Pass.[14][15] MRT line 6 currently operates daily from 7:30 am to 9:00 pm and on Fridays from 3:30 pm to 9:00 pm (7:10 am to 9:40 pm for MRT Pass/Rapid Pass holders).[16]
History
editTo implement Dhaka's 20-year-long Strategic Transport Plan, the government of Bangladesh invited the Japan International Cooperation Agency to conduct a primary survey and feasibility study on the transport system of Dhaka in 2009–2010. In 2012, the Executive Committee of the National Economic Council approved the project. A loan agreement between the Bangladeshi government and the Japanese International Cooperation Agency was signed in January 2013.
Dhaka Mass Transit Company Limited, the agency responsible for the implementation of the first metro line, was formed in January 2013. The General Consultant, namely the NKDM Association, commenced work beginning in February 2014. In June 2013, Dhaka Mass Transit Company Limited was established by the government to implement the Metro Rail Lines across the city.[17] Dhaka metro rail was opened by Prime Minister Sheikh Hasina on 29 December 2022.[18]
History of MRT Line-6
editConstruction
editThe deal for the construction of the MRT Line-6, costing US$2.8 billion, was signed by the government of Bangladesh with the Japan International Cooperation Agency on 20 February 2013.[19] Construction began on 26 June 2016 with an inauguration ceremony presided over by the prime minister Sheikh Hasina.[20] Civil engineering work was done by the Italian-Thai Development Public Company Ltd. and China's Sinohydro Corporation Ltd. JV, and a Tokyo-based construction company developed the depot's land.[21][22]
Construction work was divided into eight packages, covering aspects like depots, stations and rolling stock.[23]
Planning
editWhen construction commenced in 2016, the Metro Rail was expected to open by the end of 2019.[20] By 2018, this expectation was still held to, but by 2019, completion of phase one was delayed to December 2021.[24] In 2018, the second phase was expected to be complete by December 2020.[24][25] Eventually, these dates were pushed back, with phase one opening in 2022 and phase two expected in 2023.[26] The main reason for the delays from 2020 to 2022 was the COVID-19 pandemic.[27]
Cost and length changes
editOriginally, the project cost was Tk 219,850 million but it was later increased by Tk 114,870 million to Tk 334,720 million, although the full Project is not yet completed. The first route, originally projected to start from Uttara, a northern area of Dhaka, to Sayedabad, in the south of the capital,[28] was eventually extended north to Uttara and truncated south to Motijheel.[29] The original length which was 20.10 km (12.49 mi) has been increased by 1.16 km to 21.26 km (13.21 mi). It was planned to have 16 stations originally but it has been increased to 17 stations.[30]
Misconceptions
editThe project was originally reported to be a 27 km (17 mi) underground metro rail line. It was later confirmed to be an elevated and underground metro rail project.[31] In 2014, it was reported that 56 trains would run on the metro system.[32] It was confirmed that 24 vehicles would run on the MRT Line-6.[24] It was planned to have six lines.
Trial runs
editMRT Line-6's train made its first run on 29 August 2021. It traveled from Diabari Depot to Mirpur 12. It successfully made its second run on 29 November 2021. It traveled from Uttara to Mirpur 10. The line's train made its longest trial run on 12 December 2021. It traveled from Uttara to Agargaon. The train ran for after invigoration has been run 4 stations along with mirpur to Agargaon station after several months other stations are open11.3 km (7.0 mi). It ran at 100 km/h for 9 km (5.6 mi) and ran at 15–20 km (9.3–12.4 mi) for the rest.[33]
Architecture
editLine 6 consists of 16 operational elevated stations of 180m length each, and 20.1 km (12.5 mi) of electricity-powered light rail tracks. All of line 6, save for the depot and some of its accompanying LRT, will be elevated above current roads. Mostly, this will be above road medians to allow traffic flow underneath, with stations also elevated. The Dhaka Metro is projected to serve more than 60,000 passengers per hour by 2022 with headways of approximately 4 minutes.[32] The entire route can be travelled in less than 40 minutes at a speed of 100 km/h (62 mph), and is expected to drastically reduce the number of private cars on Dhaka's streets as well as their potentially 7-hour-long standstills.[34][35] The system is using magnetic contactless Integrated Circuit Ticketing, commonly known as smart cards.[8] Platform screen door (PSD) barriers used at the platform level will increase safety and increase efficiency.[8] Trains of six spacious air-conditioned cars will arrive every four minutes going each way at each of the 16 stations.[35]
The project is being managed by the Communications Ministry's Dhaka Transport Co-ordination Authority, and a consortium of foreign and Bangladeshi firms known as the NKDM Association is acting as the project's general consultant. The NKDM Association consists of Nippon Koei Japan and Development Design Consultants (local consultant - Bangladesh).[citation needed]
Infrastructure
editRolling stock
editJapan-based Kawasaki Heavy Industries made the rolling stock for Dhaka Metro with the latest technology and necessary security equipment. The body of the air-conditioned trains are made of light and durable stainless-steel.[36][37]
Network
editOperational
editLine | First run | Stations | Number of Stations | Length (km) | Terminals | Interchange Stations | Depot | |
---|---|---|---|---|---|---|---|---|
MRT 6 First Phase |
29 December 2022 | Uttara North, Uttara Center, Uttara South, Pallabi, Mirpur-11, Mirpur-10, Kazipara, Shewrapara, Agargaon[11] | 9[11] | 11.73[11] | Uttara Terminal | Agargaon | MRT Line 5N at Mirpur 10 | Diabari Depot |
MRT 6 Second Phase |
4 November 2023 | Bijoy Sarani, Farmgate, Kawran Bazar, Shahbagh, Dhaka University, Bangladesh Secretariat, Motijheel | 7 | 9.53 | Motijheel | MRT Line 5S at Kawran Bazar |
Under construction/planned
editLine | Expected completion | Stations | Number of Stations | Length (km) | Terminals | Interchange Stations | Depot | |
---|---|---|---|---|---|---|---|---|
MRT 1 (Airport Route) |
2026 | Shahjalal International Airport Shahjalal International Airport Terminal 3, Khilkhet, Nadda, Notun Bazar, North Badda, Badda, Aftabnagar, Rampura, Malibagh, Rajarbagh, Kamalapur | 21[a] |
31.233[a][38] |
Shahjalal International Airport | Kamalapur | MRT Line 5N at Notun Bazar
at Aftabnagar at Kamalapur |
Pitalganj Depot |
MRT 1 (Purbachal Route) |
Notun Bazar, Nadda, Joar Sahara, Boalia, Mastul, SHCS, Purbachal Centre, Purbachal East, Purbachal Terminal | Purbachal Terminal | MRT Line 6
at Notun Bazar | |||||
MRT 2 (Main Line) | 2030 | Gabtoli, Dhaka Uddan, Mohammadpur, Jhigatola, Science Laboratory, New Market, Azimpur, Palashi, DHK Medical College, Gulistan, Motijheel, Kamalapur, Manda, Dakkhingaon, Damripara, Signboard, Vuighar,Jalkuri, Downtown Narayanganj | 22 | 35 | Gabtoli | Narayanganj | MRT Line 5N
at Gabtoli at Motijheel at Kamalapur at Signboard |
Matuail Rail Depot |
MRT 2 (Branch Line) | Gulistan, Golap Shah Mazar, Nayabazar, Sadarghat | N/A | ||||||
MRT 4 | 2031 | Kamalapur, Sayedabad, Jatrabari, Shonir Akhra, Signboard, CTG Road, Kanchpur, Madanpur | 8 | 16[39] | Kamalapur | Madanpur | MRT Line 1
at Kamalapur at Signboard |
Madanpur |
MRT 5 (Northern Route) |
2028 | Hemayetpur, Baliarpur, Bilamalia, Amin Bazar, Gabtoli, Darus-Salam, Mirpur 1, Mirpur 10, Mirpur 14, Kochukhet, Banani, Gulshan-2, Notun Bazar, Vatara | 14 | 20 | Hemayetpur | Vatara | MRT Line 2
at Gabtoli at Mirpur 10 at Notun Bazar |
Hemayetpur Depot |
MRT 5 (Southern Route) |
2029 | Gabtoli, Technical Circle, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russel Square, Karwan Bazar, Hatirjheel, Tejgaon, Aftabnagar, Aftabnagar Centre, Aftabnagar East, Nasirabad, Dasherkandi | 15 | 17.3 | Gabtoli | Dasherkandi | MRT Line 2
at Gabtoli at Kawran Bazar at Aftabnagar |
Dasherkandi Depot |
MRT 6
Third Phase |
2025 | Kamalapur | 1 | 1.17 | Uttara Terminal | Kamalapur | MRT Line 1
at Kamalapur |
Diabari Depot |
Total | 104[b] | 128.7[c] |
Official time table for Dhaka metro rail
editFULL TIMETABLE | ||||||
---|---|---|---|---|---|---|
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|
|
|
|
|
The weekly closure of Dhaka Metro service is on Friday |
|
ㅤ
Dhaka Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
MRT lines
editMRT Line-1
editAirport Route
editThe construction of the 19.872 km (12.348 mi) long underground line, MRT Line-1 (Airport Route), is set to begin in December 2022, costing US$6.1 billion after many delays. Its deadline is set for 2026.[43] It will start from Shahjalal International Airport and stop at Kamalapur Railway Station. The line will have 12 underground stations. Stations will be constructed at Shahjalal International Airport, Shahjalal International Airport Terminal 3, Khilkhet, Jamuna Future Park, Notun Bazar, Uttar Badda, Badda, Hatirjheel East, Rampura, Malibagh, Rajarbagh and Kamalapur Railway Station. MRT Line-1 will have an interchange with MRT Line-6, MRT Line-2 and MRT Line-4 at Kamalapur Railway Station. There will be an interchange for the MRT Line-5 Northern Route and the MRT Line-1's Purbachal route at the Notun Bazar. Hatirjheel East of MRT Line-1 and Aftab Nagar West Station of MRT Line-5: Southern Route will have an Interchange. Above all, the airport will have an interchange of MRT Line-1 with BRT Line-3.[38] The government will provide US$1.5 billion while the Japan International Cooperation Agency (JICA) will fund US$4.6 billion.[44] The use of soundless TBMs will make it possible to build MRT-1's underground infrastructure without disrupting the daily lives of residents and businesses.
Purbachal Route
editMRT Line-1 (Purbachal Route) will be 11.369 km (7.064 mi) long and it will have stations at Notun Bazar, Jamuna Future Park, Bashundhara, Police Officers' Housing Society, Mastul, Purbachal West, Purbachal Centre, Purbachal Sector-7 and Purbachal depot. Of these stations, Notun Bazar and Jamuna Future Park would be underground as a part of the airport route.[45]
MRT Line-2
editMRT Line-2 will connect Gabtali with Chittagong Road. The stations on this route are - Gabtoli, Dhaka Uddan, Mohammadpur, Jhigatola, Science Laboratory, New Market, Azimpur, Palashi, DHK Medical College, Gulistan, Motijheel, Kamalapur, Manda, Dakkhingaon, Damripara, Signboard, Vuighar, Jalkuri and Downtown Narayanganj in the Main Line and Gulistan, Golap Shah Mazar, Nayabazar and Sadarghat in the Branch Line. The length of this line will be 22 km (14 mi).
MRT Line-4
editMRT Line-4 will connect Kamalapur Railway Station with Narayanganj with elevated and underground lines (planned).[45] Length of this line will be 8 km (5.0 mi). According to a survey conducted by Japan International Cooperation Agency (JICA), MRT Line-4 will run parallel to an existing line which will be converted to a dual gauge railway line by the order of the Bangladesh Railway Authority. The stations in this line are Kamalapur, Sayedabad, Jatrabari, Shonir Akhra, Signboard, CTG Road, Kanchpur and Madanpur.
MRT Line-5
editNorthern Route
editConstruction of MRT Line-5 (Northern Route) will begin in September 2023.[46] MRT Line-5 (Northern Route) will start from Hemayetpur of Savar Upazila and end at Vatara (at Bashundhara), costing US$4.85 billion.[45] It expected to be 20 km (12 mi) long in total.[45] Northern route will be 13.5 km (8.4 mi) underground and 6.5 km (4.0 mi) elevated. It will have 14 stations, of which 9 stations will be underground. Those underground stations will be constructed at Gabtoli, Darus Salam, Mirpur 1, Mirpur 10, Mirpur 14, Kachukhet, Banani, Gulshan-2 and Notun Bazar. 5 stations will be elevated. 5 elevated stations will be constructed at Hemayetpur, Baliarpur, Bilamalia, Amin Bazar and Vatara (at Bashundhara R/A). MRT Line-5 (Northern Route) will have depot at Hemayetpur of Savar Upazila.[47]
Southern Route
editThe MRT Line-5 (Southern Route), which is about 17.4 km (10.8 mi) long, is expected to be operational between 2027 and 2030. It will connect Gabtoli with Dasherkandi. The stations on this route are Gabtoli, Technical, Kallyanpur, Shyamoli, College Gate, Asad Gate, Russel Square, Karwan Bazar, Hatirjheel, Tejgaon, Aftabnagar, Aftabnagar Centre, Aftabnagar East, Nasirabad and lastly Dasherkandi. It is possible to interchange with MRT line 5 (Northern Route) and MRT line 2 at Gabtoli, interchange with MRT line 6 at Karwan Bazar.
MRT Line-6
editMRT Line-6 has 17 elevated stations each 180 meters long and 21.26 km (13.21 mi) of electric light rail track (LRT). All Line-6 and some attending LRTs, except the depot, have been elevated above the existing roads to allow traffic flow below.
This line consists of five phases, of which only the first and second are currently operational.
- Opened on 29 December 2022, from Uttara North to Agargaon with a length of 11.73 kilometres (7.29 mi).
- Opened on 5 November 2023, from Agargaon to Motijheel,[48] which has a length of 8.37 kilometres (5.20 mi).
- Slated for completion in December 2025, from Motijheel to Kamalapur, which will be 1.16 kilometres long (0.72 mi)
- With construction expected to start after Phase 3, from Uttara North to Tongi, with a length of 4.61 kilometres (2.86 mi)[49][50]
- Further extension in the north-west through Ashulia and Baipayl to Nabinagar is planned.[51]
Fare issues
editDMTCL constituted a Fare Fixing Committee to fix the fare of the MRT Line 6, in a meeting held on 10 January 2021, the committee fixed ৳2.40 per kilometer as the proposed fare. The proposed rent was determined based on the break-even point. According to the proposal, the fare from Uttara North to Motijheel was supposed to be ৳48.25.[52] On 6 September 2022, Obaidul Quader announced a fare of ৳5 per kilometer and a minimum fare of ৳20. This finalized minimum fare is higher than Kolkata and Delhi Metro in India and Lahore Metro in Pakistan.[53]
On 17 December 2022, the Secretary General of Bangladesh Passenger Welfare Association demanded to reduce the fare per kilometer and the minimum fare by half considering the interests of the passengers.[54] On the other hand, on 26 December 2022, the Institute for Planning and Development demanded a 30% reduction in fares to encourage passengers to use the line.[55] In a press conference held the next day, the managing director of DMTCL mentioned electricity price and profit as the reason for fixing higher fare rate.[56]
In a meeting of the Standing Committee of Bangladesh Nationalist Party (BNP) held on the same day, Nazrul Islam Khan claimed that the fixed fare conflicted with the Metrorail Act, 2015. In the meeting, he criticized the government's decision stating that metro fares are higher than bus fares in the country.[57] On 29 December 2022, Obaidul Quader stated that fares are not an issue here and that Dhaka's fixed fares are low when compared to mass rapid transit systems in Thailand and Malaysia.[58] On 24 August 2023, Muhammad Abdul Mannan, the planning minister, said that the government is making efforts to reduce the ticket fares so that it is possible for common people to travel by mass rapid transit.[59]
See also
editNotes
edit- ^ a b The airport route will have 12 underground stations and the Purbachal route will have 9 elevated stations. The airport route will be 19.9 km (12.4 mi) and the Purbachal route will be 11.7 km (7.3 mi).[38]
- ^ if interchanges are counted multiple times.[40]
- ^ The network is planned to contain six lines (Counting MRT Line-1 as one line) with a total mileage of 128.741 kilometres (79.996 mi). MRT Line-6 is already under construction. Other lines are being planned.[41]
References
edit- ^ "Key things to know about metro rail's Agargaon-Motijheel section". The Daily Star. 4 November 2023. Archived from the original on 4 November 2023. Retrieved 5 November 2023.
- ^ a b ঢাকা ম্যাস ট্রানজিট কোম্পানি লিমিটেড (ডিএমটিসিএল) (in Bengali). Archived from the original on 29 May 2023. Retrieved 12 July 2023.
- ^ "Chairman, Managing director of company". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
- ^ "headquarter". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
- ^ "Dhaka Metro Rail: Integrated test, trial run to begin soon". Dhaka Tribune. 5 January 2022. Archived from the original on 7 February 2022. Retrieved 7 February 2022.
- ^ a b ঢাকা পরিবহন সমন্বয় কর্তৃপক্ষ. www.dtca.gov.bd (in Bengali). Archived from the original on 6 October 2021. Retrieved 6 October 2021.
- ^ "Dhaka BRT Line 3 Gazipur to Airport". Road Transport and Highways Division. 29 April 2017. 1 minutes in. Retrieved 1 January 2023.
- ^ a b c "About MRT Line-6". Dhaka Mass Transit Company Ltd. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
- ^ "PM Hasina becomes first passenger to travel on Metro Rail with ticket". The Business Standard. 28 December 2022. Archived from the original on 28 December 2022. Retrieved 28 December 2022.
- ^ "Passengers gather at Dhaka metro stations at first light". bdnews24.com. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
- ^ a b c d "Metro Rail: Roll-out on Victory Day next year". The Daily Star. 13 December 2021. Archived from the original on 26 December 2022. Retrieved 2 February 2023.
- ^ Hossain, Anwar (25 December 2022). প্রযুক্তির চমক মেট্রোরেলে. Prothom Alo (in Bengali). Archived from the original on 25 December 2022.
- ^ "Redirect Notice". The Daily Star. February 2023. Archived from the original on 2 February 2023. Retrieved 2 February 2023.
- ^ "Passengers who can travel Metro Rail without fare". Kaler Kantho. 28 December 2023. Retrieved 28 January 2024.
- ^ "Metro rail commuters to get 10% discount by paying fares on smart cards". The Business Standard. 8 September 2023. Retrieved 28 January 2024.
- ^ "Metro rail to run till 8pm from Saturday". The Daily Star. 18 January 2024. Retrieved 23 January 2024.
- ^ "About DMTC Line 6- The Official Website for the Dhaka MRT Project". Dhaka Mass Transit Company Ltd. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
- ^ "Dhaka Metro Rail Opening". The Daily Star. Retrieved 3 October 2024.
- ^ "Bangladesh, Japan strike deal for $2.81-bln Dhaka metro rail". GlobalPost. 20 February 2013. Archived from the original on 21 May 2013. Retrieved 21 May 2013.
- ^ a b "PM opens work on metro, BRT". The Daily Star. 27 June 2016. Retrieved 25 July 2016.
- ^ "Just 12% progress made in metro rail project in 4 years". Dhaka Tribune. 12 October 2017. Archived from the original on 27 February 2018. Retrieved 26 February 2018.
- ^ "Building Bangladesh's first Mass Rapid Transit System". Archived from the original on 2 August 2021. Retrieved 3 August 2021.
- ^ "Document MRT Line-6" (PDF). Archived (PDF) from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ a b c "Fact box: All you need to know about metro rail project". The Daily Star. 30 April 2018. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Metro rail service delayed by 1yr, to be launched Dec 2021". The Daily Star. 29 May 2019. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Dhaka metro-rail travel turning real". The Financial Express (Bangladesh). Archived from the original on 29 November 2022. Retrieved 4 December 2022.
- ^ Ahmed, Zafar. "Metro rail, first in Bangladesh, was delayed by COVID-19. A new date is far off". bdnews24.com. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Muhith to sit with armed forces to resolve metro rail site dispute". The Financial Express (Bangladesh). 25 June 2011. Archived from the original on 29 June 2011. Retrieved 25 June 2011.
- ^ "In 37 minutes". The Daily Star. 26 June 2016. Retrieved 25 July 2016.
- ^ Adhikary, Tuhin Shubhra; Byron, Rejaul Karim (18 July 2022). "Dhaka Metro Rail now set to cost 50% more". The Daily Star. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Dhaka Metro likely by 2013". Dhaka Mirror. 28 May 2010. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ a b Ahmed, Shamim. "Dhaka Metrorail to carry 60,000 people per hour". bdnews24.com. Archived from the original on 29 November 2022. Retrieved 29 November 2022.
- ^ "Metro rail completes biggest test trip so far". The Business Standard. 12 December 2021. Archived from the original on 4 December 2022. Retrieved 4 December 2022.
- ^ "Traffic chaos reigns in Bangladesh". The Star. Archived from the original on 15 June 2021. Retrieved 17 February 2019.
- ^ a b "Metro rail construction in progress". Daily Sun. Archived from the original on 2 February 2017. Retrieved 28 January 2017.
- ^ "Rolling Stock for Dhaka MRT Line-6 First Shipment". Kawasaki. 4 March 2021. Retrieved 30 January 2024.
- ^ "Kawasaki ships out rolling stock for Dhaka MRT Line-6". Railway Technology. 4 March 2021. Retrieved 30 January 2024.
- ^ a b c "Frequently Asked Questions (FAQs) of MRT Line-1". dmtcl.gov.bd. Archived from the original on 27 June 2021. Retrieved 8 October 2021.
- ^ "Progress of MRT Line 4 and Info of other MRT lines". www.dmtcl.gov.bd. Archived from the original on 28 June 2021. Retrieved 18 July 2021.
- ^ "Stations quantity". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
- ^ "At a Glance". dmtcl.gov.bd. Archived from the original on 1 December 2021. Retrieved 1 December 2021.
- ^ "Timetable - Dhaka Metro". dhakametro.online. Retrieved 6 February 2024.
- ^ "Dhaka's first underground metro work begins in December". The Business Standard. 23 October 2022. Archived from the original on 22 November 2022. Retrieved 22 November 2022.
- ^ "Construction of Bangladesh's first underground metro line to begin March 2022". Dhaka Tribune. 17 June 2021. Archived from the original on 21 September 2021. Retrieved 22 September 2021.
- ^ a b c d Byron, Rejaul Karim; Adhikary, Tuhin Shubhra (15 October 2019). "Dhaka Metro Rail: Two more lines to cost Tk 93,800cr". The Daily Star. Archived from the original on 24 January 2020. Retrieved 8 October 2021.
- ^ Adhikary, Tuhin Shubhra (10 June 2022). "Fast-Track Projects: Debt repayment a worry now". The Daily Star. Archived from the original on 9 June 2022. Retrieved 10 June 2022.
- ^ "Frequently Asked Questions (FAQs) of MRT Line-5: Northern Route". dmtcl.gov.bd. Archived from the original on 28 June 2021. Retrieved 8 October 2021.
- ^ "Agargaon to Motijheel in just 14 minutes!". The Daily Star. 5 November 2023. Retrieved 12 December 2023.
- ^ "DMTCL may start feasibility study soon". The Financial Express (Bangladesh). Retrieved 17 January 2024.
- ^ "Metro rail route to be extended to Tongi". Dhaka Tribune. 28 April 2023. Retrieved 13 October 2024.
- ^ মেট্রোরেল ছুটবে বাইপাইল-নবীনগর-গাজীপুর. Dhaka Mail (in Bengali). Retrieved 17 January 2024.
- ^ মেট্রোরেলের ভাড়া কিলোমিটারে ২ টাকা ৪০ পয়সার প্রস্তাব [Metro Rail fare offer is 2 taka 40 paisa per kilometer]. Samakal (in Bengali). 12 January 2021. Archived from the original on 16 July 2023. Retrieved 10 May 2023.
- ^ ঢাকার মেট্রোরেলের সর্বনিম্ন ভাড়া দিল্লির দ্বিগুণ, কলকাতার তিন গুণ, লাহোরের আড়াই গুণ [The minimum fare of Dhaka Metrorail is twice that of Delhi, three times that of Kolkata, two and a half times that of Lahore]. The Daily Star (in Bengali). 7 September 2022. Archived from the original on 8 September 2022. Retrieved 10 May 2023.
- ^ মেট্রোরেলের ভাড়া ৫০ শতাংশ কমানোর দাবি [Demand to reduce Metro Rail fare by 50 percent]. Banglanews24.com (in Bengali). 17 December 2022. Archived from the original on 21 December 2022. Retrieved 10 May 2023.
- ^ মেট্রোরেলের ভাড়া ৩০ শতাংশ কমানোর পরামর্শ আইপিডির [IPD suggests to reduce metro rail fare by 30 percent]. Daily Naya Diganta (in Bengali). 26 December 2022. Archived from the original on 27 December 2022. Retrieved 10 May 2023.
- ^ যে কারণে ঢাকা মেট্রোরেলের ভাড়া বেশি [That is why Dhaka Metro Rail fares are high]. Bangla Tribune (in Bengali). 27 December 2022. Archived from the original on 28 December 2022. Retrieved 10 May 2023.
- ^ মেট্রোরেলের ভাড়া নির্ধারণে আইন ও বিধি মানা হয়নি: বিএনপি [Laws and rules not followed in fixing Metro Rail fares: BNP]. Bangla Tribune (in Bengali). 27 December 2022. Archived from the original on 30 December 2022. Retrieved 10 May 2023.
- ^ মেট্রোরেলের ভাড়া নিয়ে মোটেও সমস্যা হবে না: কাদের [Metro Rail fares won't be a problem at all: Who]. Janakantha (in Bengali). 29 December 2022. Archived from the original on 29 December 2022. Retrieved 10 May 2023.
- ^ "মেট্রোরেল দিয়ে ব্যবসা করতে চাই না: পরিকল্পনামন্ত্রী" [Don't want to do business with Metro Rail: Planning Minister]. Daily Bangla (in Bengali). 24 August 2023. Archived from the original on 26 August 2023. Retrieved 25 August 2023.