Manufacture of the ITER Central Solenoid Components / Libeyre, Paul (Euratom, St. Paul Lez Durance) ; Cormany, Carl (Euratom, St. Paul Lez Durance) ; Dolgetta, Nello (Euratom, St. Paul Lez Durance) ; Gaxiola, Enrique (Euratom, St. Paul Lez Durance) ; Jong, Cornelis (Euratom, St. Paul Lez Durance) ; Lyraud, Charles (Euratom, St. Paul Lez Durance) ; Mitchell, Neil (Euratom, St. Paul Lez Durance) ; Journeaux, Jean-Yves (Euratom, St. Paul Lez Durance) ; Pearce, Robert (Euratom, St. Paul Lez Durance) ; Evans, David (Euratom, St. Paul Lez Durance) et al.
The ITER central solenoid (CS) components are currently being manufactured. This Nb$_{3}$Sn superconducting magnet will provide the magnetic flux swing required to induce up to 15 MA as plasma current. [...]
2018 - Published in : IEEE Trans. Appl. Supercond. 28 (2018) 4200805
In : 25th International Conference on Magnet Technology, Amsterdam, The Netherlands, 27 Aug - 1 Sep 2017, pp.4200805
2.
Electrical insulation testing for ITER fusion tokamak / Gaxiola, E (Euratom, St. Paul Lez Durance) ; Evans, D (Euratom, St. Paul Lez Durance) ; Laquiere, J (Euratom, St. Paul Lez Durance) ; Laurenti, A (Euratom, St. Paul Lez Durance) ; Libeyre, P (Euratom, St. Paul Lez Durance) ; Lyraud, C (Euratom, St. Paul Lez Durance) ; Piccin, R (Euratom, St. Paul Lez Durance) ; Rinaudo, G (Euratom, St. Paul Lez Durance) ; Simon, F (Euratom, St. Paul Lez Durance) ; Vollmann, T (Euratom, St. Paul Lez Durance) et al.
The uniqueness of the ITER fusion project drives purpose and scope here to fulfil (functional) Procurement Arrangement (PA) requirements for the Central Solenoid (CS) and Correction Coil (CC) magnets' electrical insulation [1-3]; as used and undertaken for covering high voltage testing operations of the magnet coil winding pack (WP) vacuum pressure insulation (VPI) beam qualification, followed in 2016 by start of magnets series production in the USA and China [1, 2]. Useful to be considered common state-of-the-art electrical power components testing practices [3, 4] are presented here as performed to verify that the integrity and insulation of the various components are within acceptable limits during different phases of the fabrication and to certify acceptance on delivery of the complete coils. [...]
2017 - 4 p. - Published in : 10.1109/EIC.2017.8004670
In : 35th IEEE Electrical Insulation Conference, Baltimore, MD, USA, 11 - 14 Jun 2017, pp.408-411
3.
From manufacture to assembly of the ITER central solenoid / Libeyre, P (BIAM, St Paul lez Durance) ; Schild, T (BIAM, St Paul lez Durance) ; Bruton, A (BIAM, St Paul lez Durance) ; Cormany, C (BIAM, St Paul lez Durance) ; Dolgetta, N (BIAM, St Paul lez Durance) ; Gaxiola, E (BIAM, St Paul lez Durance) ; Jong, C (BIAM, St Paul lez Durance) ; Mitchell, N (BIAM, St Paul lez Durance) ; Evans, D (BIAM, St Paul lez Durance) ; Levesy, B (BIAM, St Paul lez Durance) et al.
The Central Solenoid (CS), a key component of the ITER Magnet system, using a 45 kA Nb 3 Sn conductor, includes six identical coils, called modules, to form a solenoid, enclosed inside a structure providing vertical pre-compression and mechanical support. Procurement of the components of the ITER CS is the responsibility of US ITER, the US Domestic Agency (USDA), while the assembly of these components will be carried out by the ITER Organization (IO). [...]
2019 - 4 p. - Published in : Fusion Eng. Des. 146 (2019) 437-440
4.
Requirements for qualification of manufacture of the ITER Central Solenoid and Correction Coils / Libeyre, Paul (ITER, St. Paul Lez Durance) ; Li, Hongwei (ITER China, Beijing) ; Reiersen, Wayne (US ITER Project, Oak Ridge) ; Dolgetta, Nello (ITER, St. Paul Lez Durance) ; Jong, Cornelis (ITER, St. Paul Lez Durance) ; Lyraud, Charles (ITER, St. Paul Lez Durance) ; Mitchell, Neil (ITER, St. Paul Lez Durance) ; Laurenti, Adamo (ITER, St. Paul Lez Durance) ; Sgobba, Stefano (CERN) ; Turck, Bernard (ITER, St. Paul Lez Durance) et al.
2015 - Published in : Fusion Eng. Design 98-99 (2015) 1103-1108
In : 28th Symposium on Fusion Technology, San Sebastian, Spain, 29 Sep - 3 Oct 2014, pp.1103–1108
5.
Assessment of Residual Stresses in ITER CS Helium Inlet Welds Fatigue Tested at Cryogenic Temperature / Sgobba, S (CERN) ; Aviles Santillana, I (CERN) ; Langeslag, S (CERN) ; Fernandez Pison, P (CERN ; Carlos III U., Madrid) ; Castillo Rivero, S (CERN ; Seville U.) ; Libeyre, P (Euratom, St. Paul Lez Durance) ; Jong, C (Euratom, St. Paul Lez Durance) ; Everitt, D (Oak Ridge, U.S. ITER) ; Freudenberg, K (Oak Ridge, U.S. ITER)
The ITER Central Solenoid (CS) consists of six independent wound modules. The cooling of the cable-in-conduit conductor is assured by a forced flow of supercritical He at 4.5 K supplied by He inlets located at the innermost radius of the coil. [...]
2019 - 6 p. - Published in : IOP Conf. Ser. Mater. Sci. Eng. 502 (2019) 012095
In : 27th International Cryogenic Engineering Conference - International Cryogenic Materials Conference 2018, Oxford, United Kingdom, 3 - 7 Sep 2018, pp.012095
6.
Qualification of the Manufacturing Procedures of the ITER Correction Coils / Libeyre, P (Euratom, St. Paul Lez Durance) ; Cormany, C (Euratom, St. Paul Lez Durance) ; Dolgetta, N (Euratom, St. Paul Lez Durance) ; Gaxiola, E (Euratom, St. Paul Lez Durance) ; Ilyin, Y (Euratom, St. Paul Lez Durance) ; Mitchell, N (Euratom, St. Paul Lez Durance) ; Simon, F (Euratom, St. Paul Lez Durance) ; Evans, D (Euratom, St. Paul Lez Durance) ; Sgobba, S (CERN) ; Langeslag, S A E (CERN) et al.
The system of correction coils (CC) is a component of the ITER magnet system, required to correct toroidal asymmetries and reduce error magnetic fields detrimental for physical processes in the plasma. It includes 18 coils, inserted in between toroidal field coils and poloidal field coils and split into 3 sets of 6 coils each: bottom correction coils (BCC), side correction coils (SCC), and top correction coils (TCC). [...]
2017 - 5 p. - Published in : IEEE Trans. Appl. Supercond. 27 (2017) 4201405
7.
Examination and Characterization of Physical and Mechanical Properties of the ITER Central Solenoid Module Coils / Sgobba, Stefano (CERN) ; Aviles Santillana, Ignacio (CERN) ; Lourenço, Sandra Sophie (CERN) ; Guinchard, Michael (CERN) ; De Frutos, Oscar Sacristan (CERN) ; Jong, Cornelis (Euratom, St. Paul Lez Durance) ; Libeyre, Paul (Euratom, St. Paul Lez Durance) ; Schild, Thierry (Euratom, St. Paul Lez Durance) ; Gaxiola, Enrique (Euratom, St. Paul Lez Durance) ; Bennet, José (CEA, DEN, Saclay) et al.
The ITER Central Solenoid (CS) consists of a stack of six independent coil packs called modules. It features a total height of 18 m and a diameter of over 4 m. [...]
2022 - 5 p. - Published in : IEEE Trans. Appl. Supercond. 32 (2022) 4200605
In : 27th International Conference on Magnet Technology (MT-27), Fukuoka, Japan, 15 - 19 Nov 2021, pp.4200605
8.
Characterization of low temperature high voltage axial insulator breaks for the ITER cryogenic supply line / Fernandez Pison, P (CERN ; Carlos III U., Madrid) ; Sgobba, S (CERN) ; Santillana, I Aviles (CERN ; Carlos III U., Madrid) ; Langeslag, S A E (CERN) ; Su, M (Euratom, St. Paul Lez Durance) ; Piccin, R (Euratom, St. Paul Lez Durance) ; Journeaux, J Y (Euratom, St. Paul Lez Durance) ; Laurenti, A (Euratom, St. Paul Lez Durance) ; Pan, W (Hefei, Inst. Plasma Phys.)
Cable-in-conduit conductors of the ITER magnet system are directly cooled by supercritical helium. Insulation breaks are required in the liquid helium feed pipes to isolate the high voltage system of the magnet windings from the electrically grounded helium coolant supply line. [...]
2017 - 8 p. - Published in : IOP Conf. Ser. Mater. Sci. Eng. 279 (2017) 012007 Fulltext: PDF; External link: Fulltext
In : 2017 Cryogenic Engineering Conference and International Cryogenic Materials Conference, Madison, WI, USA, 9 - 13 Jul 2017, pp.012007
9.
EPS-AG 2008 Gersh Budker Prize Presentation : The Successful Construction and Commissioning of the Spallation Neutron Source / Holtkamp, N R (Euratom, St. Paul Lez Durance) ; Holtkamp, N R (Oak Ridge)
2008 - 3 p. External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.THPPGM03
10.
Investigation of Materials and Welds for the Precompression Structure of the ITER Central Solenoid / Sgobba, Stefano (CERN) ; Santillana, Ignacio Aviles (Carlos III U., Madrid ; CERN) ; Langeslag, Stefanie Agnes Elisabeth (CERN) ; Pison, Pilar Fernandez (Carlos III U., Madrid ; CERN) ; Menendez, Paula Freijedo (CERN) ; Izquierdo, Gonzalo Arnau (CERN) ; Libeyre, Paul (Euratom, St. Paul Lez Durance) ; Hughes, Duke (ORNL, Oak Ridge (main))
The Central Solenoid (CS) is the backbone of the ITER magnet system. It consists of six independent coils held together by a vertical pre-compression structure that must react tensile loads and provide sufficient preload to maintain coil-to-coil contact during all stages of plasma operation. [...]
2018 - 1 p. - Published in : IEEE Trans. Appl. Supercond. 28 (2018) 4202504

Nenašli ste čo ste hľadali? Skúste Vašu otázku na iných serveroch:
recid:2301992 v Amazon
recid:2301992 v CERN EDMS
recid:2301992 v CERN Intranet
recid:2301992 v CiteSeer
recid:2301992 v Google Books
recid:2301992 v Google Scholar
recid:2301992 v Google Web
recid:2301992 v IEC
recid:2301992 v IHS
recid:2301992 v INSPIRE
recid:2301992 v ISO
recid:2301992 v KISS Books/Journals
recid:2301992 v KISS Preprints
recid:2301992 v NEBIS
recid:2301992 v SLAC Library Catalog