CERN Accelerating science

CERN Document Server Намерени са 2,038 записа  1 - 10следващкрай  отиване на запис: Търсенето отне 0.43 секунди. 
1.
Measurement and alignment of the TIDVG5 SPS beam dump / Vendeuvre, Camille (CERN) ; Bestmann, Patrick (CERN) ; Barcet, Florian
During the Long Shutdown 2 (LS2 2018-2021) the CERN injector complex was upgraded to meet the future High Luminosity-Large Hadron Collider (HL-LHC) re- quirements [...]
CERN-BE-2023-016.
- 2022. - 6 p.
Full text
2.

CERN-PHOTO-202008-109
© 2020-2022 CERN
SPS beam dump shielding (TIDVG5) installation
Transport to BB5 of the TIDVG5 SPS beam dump and t [...]
26-08-2020
More >>
3.

CERN-PHOTO-202010-134
© 2020-2022 CERN
SPS internal beam dump TIDVG5 installation
The CERN Super Proton Synchrotron (SPS) high-energ [...]
19-10-2020
More >>
4.

CERN-PHOTO-202011-158
© 2020-2022 CERN
LIU-SPS Internal beam dump block (TIDVG5) in ECX5
When a beam of protons or heavy ions accelerating [...]
25-11-2020
More >>
5.

CERN-PHOTO-201901-147
© 2019-2022 CERN
TIDVG#5 mock-up assembly in BA5, dismantling and re installing beamline in SPS tunnel
LS2

Dismantling of beamline BA5 "decabling, dismantlin [...]
15-01-2019
More >>
6.

CERN-PHOTO-201909-258
© 2019-2022 CERN
The SPS beam dump, TIDVG
TIDVG
20-09-2019
More >>
7.
Beam Profile Measurements as Part of the Safe and Efficient Operation of the New SPS Beam Dump System / Topaloudis, Athanasios (CERN) ; Bravin, Enrico (CERN) ; Burger, Stephane (CERN) ; Jackson, Stephen (CERN) ; Velotti, Francesco (CERN) ; Veyrunes, Eric (CERN)
In the framework of the LHC Injectors Upgrade (LIU) project, the Super Proton Synchrotron (SPS) accelerator at CERN is undergoing a profound upgrade including a new high-energy beam dump. The new Target Internal Dump Vertical Graphite (TIDVG#5) is designed to withstand an average dumped beam power as high as 235 kW to cope with the increased intensity and brightness of the LIU beams whose energies in the SPS range from 14 to 450 GeV. [...]
2022 - 4 p. - Published in : JACoW ICALEPCS2021 (2022) 764-767 Fulltext: PDF;
In : 18th International Conference on Accelerator and Large Experimental Physics Control Systems, Online, 18 - 22 Oct 2021, pp.764-767
8.

CERN-PHOTO-201704-084
© 2017-2024 CERN
SPS Beam Dump
SPS DUMP TIDVG 4 - pictures taken during mounting [...]
06-04-2017
More >>
9.
SPS quadrupole dog-leg and alignment post LS2 / Velotti, Francesco Maria (CERN) ; Bartosik, Hannes (CERN) ; Bestmann, Patrick (CERN) ; Carlier, Etienne (CERN) ; Cornelis, Karel (CERN) ; Galleazzi, Frederic (CERN) ; Goddard, Brennan (CERN) ; Kain, Verena (CERN) ; Pasquino, Chiara (CERN)
This document describes the functions of the horizontal and vertical dog-legs in the SPS and the effect of their removal for the injection and dump systems, following the LIU-SPS beam dump upgrade
CERN-ACC-NOTE-2019-0015.
- 2019. - 10 p.
Full text
10.

CERN-PHOTO-202006-084
© 2020-2022 CERN
Welding process of the LHC beam dumps
Several parts stainless steel plates are being wel [...]
10-06-2020

Не намерихте, каквото търсите? Опитайте търсене в други сървъри:
recid:2849074 в Amazon
recid:2849074 в CERN EDMS
recid:2849074 в CERN Intranet
recid:2849074 в CiteSeer
recid:2849074 в Google Books
recid:2849074 в Google Scholar
recid:2849074 в Google Web
recid:2849074 в IEC
recid:2849074 в IHS
recid:2849074 в INSPIRE
recid:2849074 в ISO
recid:2849074 в KISS Books/Journals
recid:2849074 в KISS Preprints
recid:2849074 в NEBIS
recid:2849074 в SLAC Library Catalog