CERN Accelerating science

CERN Document Server Pronađeno je 3 zapisa  Pretraživanje je potrajalo 0.51 sekundi 
1.
The Linac4 vacuum control system / Blanchard, Sebastien (CERN) ; De La Gama, Jose (CERN) ; Ferreira, Rodrigo (CERN) ; Gomes, Paulo (CERN) ; Gutierrez, Abel (CERN) ; Kopylov, Leonid (Serpukhov, IHEP) ; Mikheev, Mikhail (Serpukhov, IHEP) ; Pigny, Gregory (CERN) ; Rocha, Andre (CERN)
Linac4 is 160 MeV H⁻ linear accelerator replacing Linac2 as the first injector to the CERN accelerator complex, which culminates with the Large Hadron Collider. This new Linac will increase the beam brightness by a factor of two. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-ICALEPCS2017-THPHA056 Fulltext: PDF;
In : International Conference on Accelerator and Large Experimental Physics Control Systems, Barcelona, Spain, 8 - 13 Oct 2017, pp.THPHA056
2.
Measurements, Alarms and Interlocks in the Vacuum Control System of the LHC / Pigny, Gregory (CERN) ; Antoniotti, Fabien (CERN) ; Boivin, Jean-Pierre (CERN) ; Chatzigeorgiou, Nikolaos (CERN) ; Gama, Jose (CERN) ; Gomes, Paulo (CERN) ; Krakowski, Pawel (CERN) ; Pereira, Helder (CERN)
In the LHC beam pipes and cryostats, the pressure measurement covers a wide range, from 1500 mbar down to 10⁻¹¹ mbar and even lower. If vacuum deteriorates, alarm signals are generated and sent to other systems, e.g. [...]
2015 - 4 p. - Published in : 10.18429/JACoW-ICALEPCS2015-MOPGF112 Fulltext: PDF; External link: JACoW
In : 15th International Conference on Accelerator and Large Experimental Physics Control Systems, Melbourne, Australia, 17 - 23 Oct 2015, pp.MOPGF112
3.
Consolidations on the Vacuum Controls of the CERN Accelerators, During the First Long Shutdown of the LHC / Gomes, Paulo (CERN) ; Antoniotti, Fabien (CERN) ; Aragon, Fernando (CERN) ; Bellorini, François (CERN) ; Blanchard, Sebastien (CERN) ; Boivin, Jean-Pierre (CERN) ; Chatzigeorgiou, Nikolaos (CERN) ; Daligault, Frederic (CERN) ; Ferreira, Rodrigo (CERN) ; Fraga, Jorge (CERN) et al.
For two years (Spring 2013 - Spring 2015), the LHC went through its first long shutdown (LS1). It was mainly motivated by the consolidation of magnet interconnects, to allow operation with 6.5 TeV proton beams. [...]
2015 - 4 p. - Published in : 10.18429/JACoW-ICALEPCS2015-MOPGF104 Fulltext: PDF; External link: JACoW
In : 15th International Conference on Accelerator and Large Experimental Physics Control Systems, Melbourne, Australia, 17 - 23 Oct 2015, pp.MOPGF104

Također vidi: slična imena autora
4 Gama, J
4 Gama, Joao
2 Gama, João
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Niste pronašli ono što ste htjeli? Pokušajte pretražiti na ovim serverima:
Gama, Jose u Amazon
Gama, Jose u CERN EDMS
Gama, Jose u CERN Intranet
Gama, Jose u CiteSeer
Gama, Jose u Google Books
Gama, Jose u Google Scholar
Gama, Jose u Google Web
Gama, Jose u IEC
Gama, Jose u IHS
Gama, Jose u INSPIRE
Gama, Jose u ISO
Gama, Jose u KISS Books/Journals
Gama, Jose u KISS Preprints
Gama, Jose u NEBIS
Gama, Jose u SLAC Library Catalog
Gama, Jose u Scirus