CERN Accelerating science

Article
Title Studies Performed in Preparation for the Spallation Neutron Source Accumulator Ring Commissioning
Author(s) Cousineau, Sarah M ; Danilov, Viatcheslav V ; Henderson, Stuart ; Holmes, Jeffrey Alan ; Plum, Michael
Affiliation (ORNL/ASD, Oak Ridge, Tennessee) ; (ORNL/SNS, Oak Ridge, Tennessee)
Publication 2005
In: 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.1859
Subject category Accelerators and Storage Rings
Abstract The Spallation Neutron Source accumulator ring will compress 1.5?1014, 1 GeV protons from a 1 ms bunch train to a single 695 ns proton bunch for use in neutron spallation. Due to the high beam power, unprecedented control of beam loss will be required in order to control radiation and allow for hands-on maintenance in most areas of the ring. A number of detailed investigations have been performed to understand the primary sources of beam loss and to predict and mitigate problems associated with radiation hot spots in the ring. The ORBIT particle tracking code is used to perform realistic simulations of the beam accumulation in the ring, including detailed modeling of the injection system, transport through the measured magnet fields including higher order multipoles, and beam loss and collimation. In this paper we present the results of a number of studies performed in preparation for the 2006 commissioning of the accumulator ring.



 Záznam vytvorený 2006-02-09, zmenený 2024-02-23