CERN Accelerating science

Article
Title Protection of extraction septa during asynchronous beam dumps in HL-LHC operation
Author(s) Farina, E (CERN) ; Atanasov, M (CERN) ; Borburgh, J (CERN) ; Bracco, C (CERN) ; Dutheil, Y (CERN) ; Lechner, A (CERN) ; Maestre, J (CERN) ; Muñoz, P Andreu (CERN) ; Nuiry, F X (CERN) ; Schwarz, P (CERN) ; Sharp, C (CERN) ; Thonet, P A (CERN) ; Ximenes, R Franqueira (CERN)
Publication 2023
Number of pages 4
In: JACoW IPAC 2023 (2023) MOPA100
In: 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.MOPA100
DOI 10.18429/JACoW-IPAC2023-MOPA100
Subject category Accelerators and Storage Rings
Abstract The LHC beam dump system was developed to safely and reliably dispose of the LHC beams at the end of physics fills or in case of emergency aborts. The beams are extracted by means of kicker magnets, deflecting the beams horizontally, and septa, which provide a vertical kick. The system must be able to cope with rare failure scenarios, such as an asynchronous beam dump, where the rise time of the extraction kickers is not synchronized with the 3 $\mu s$ long particle-free abort gap. This type of event would lead to bunches impacting on downstream accelerator equipment if not properly absorbed by a system of beam-intercepting devices. In the High Luminosity-LHC (HL-LHC) era, the protection absorbers have to withstand significantly higher bunch intensities of up to $2.3\cdot10^{11}$ protons. In this paper, we study the robustness and protection efficiency of the septum protection absorbers for HL-LHC operation. In particular, we present energy deposition simulations for the absorber blocks and downstream equipment and define the required absorber upgrades for HL-LHC.
Copyright/License CC-BY-4.0

Corresponding record in: Inspire


 Запись создана 2023-12-23, последняя модификация 2023-12-23


Полный текст:
Загрузка полного текста
PDF