002813525 001__ 2813525
002813525 003__ SzGeCERN
002813525 005__ 20220626230617.0
002813525 0248_ $$aoai:cds.cern.ch:2813525$$pcerncds:FULLTEXT$$pcerncds:CERN:FULLTEXT$$pcerncds:CERN
002813525 035__ $$9https://inspirehep.net/api/oai2d$$aoai:inspirehep.net:2073943$$d2022-06-24T14:17:19Z$$h2022-06-26T04:00:04Z$$mmarcxml
002813525 035__ $$9Inspire$$a2073943
002813525 041__ $$aeng
002813525 100__ $$aFerlin, G$$uCERN
002813525 245__ $$aCryogenics Experience with High Luminosity Running & Feedforward Controls
002813525 260__ $$c2019
002813525 300__ $$a5 p
002813525 520__ $$9Grobid$$aThe first part of the presentation will summarize the overall cryogenic
performance and availability for 2017 and the expected performance for 2018
taking into account the beam induced heat loads in the inner triplets magnets
and the beam screen circuits. The second part will focus on the update of the
expected cryogenic limitations as well as on the available cryogenic power
studies and associated tuning in order to deliver the required cooling power
with respect to the 2018 beams operational conditions. The feedforward controls
and refrigeration capacity improvements on the inner triplets and beam screen
circuits will be discussed.
002813525 65017 $$2SzGeCERN$$aAccelerators and Storage Rings
002813525 690C_ $$aARTICLE
002813525 690C_ $$aCERN
002813525 700__ $$aBradu, B$$uCERN
002813525 700__ $$aBrodzinski, K$$uCERN
002813525 700__ $$aDelprat, L$$uCERN
002813525 773__ $$01776837$$c113-117$$wC17-12-12.1$$y2019
002813525 8564_ $$82374550$$s953330$$uhttps://cds.cern.ch/record/2813525/files/document.pdf$$yFulltext
002813525 960__ $$a13
002813525 962__ $$b2790777$$k113-117$$nevianlesbains20171212
002813525 980__ $$aARTICLE
002813525 980__ $$aConferencePaper