002621062 001__ 2621062
002621062 003__ SzGeCERN
002621062 005__ 20191015171913.0
002621062 0247_ $$2DOI$$9IOP$$a10.1088/1757-899X/278/1/012115
002621062 0248_ $$aoai:inspirehep.net:1675383$$pcerncds:CERN:FULLTEXT$$pcerncds:FULLTEXT$$pcerncds:CERN$$qINSPIRE:HEP$$qForCDS
002621062 035__ $$9http://inspirehep.net/oai2d$$aoai:inspirehep.net:1675383$$d2018-05-31T09:19:00Z$$h2018-06-01T04:00:05Z$$mmarcxml
002621062 035__ $$9Inspire$$a1675383
002621062 041__ $$aeng
002621062 100__ $$aSerio, [email protected]$$uCERN
002621062 245__ $$9IOP$$aOutsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities
002621062 260__ $$c2017
002621062 300__ $$a8 p
002621062 520__ $$9IOP$$aCERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
002621062 540__ $$3publication$$9IOP$$aCC-BY-3.0$$uhttp://creativecommons.org/licenses/by/3.0
002621062 65017 $$2SzGeCERN$$aAccelerators and Storage Rings
002621062 690C_ $$aCERN
002621062 700__ $$aBremer, J$$uCERN
002621062 700__ $$aClaudet, S$$uCERN
002621062 700__ $$aDelikaris, D$$uCERN
002621062 700__ $$aFerlin, G$$uCERN
002621062 700__ $$aFerrand, F$$uCERN
002621062 700__ $$aPezzetti, M$$uCERN
002621062 700__ $$aPirotte, O$$uCERN
002621062 773__ $$c012115$$n1$$pIOP Conf. Ser. Mater. Sci. Eng.$$v278$$wC17-07-09$$y2017
002621062 8564_ $$81407221$$s583871$$uhttps://cds.cern.ch/record/2621062/files/pdf.pdf$$yFulltext
002621062 960__ $$a13
002621062 962__ $$b2253739$$k012115$$nmadison20170709
002621062 980__ $$aARTICLE
002621062 980__ $$aConferencePaper
002621062 999C5 $$9CURATOR$$9refextract$$hLebrun Ph$$min Frontiers of Accelerator Technology p.681$$m681$$o1$$tCryogenic Systems for Accelerators$$x[1] Lebrun Ph 1996 Cryogenic Systems for Accelerators, in Frontiers of Accelerator Technology World Scientific 681$$y1996
002621062 999C5 $$9refextract$$9CURATOR$$hDelikaris D et al.$$mProc. ICEC 22 Seoul Korea 33-38$$o2$$tCryogenic operation methodology and cryogen management at CERN over the last 15 years$$x[2] Delikaris D et al 2008 Cryogenic operation methodology and cryogen management at CERN over the last 15 years Proc. ICEC 22 Seoul Korea 33-38$$y2008
002621062 999C5 $$9refextract$$9CURATOR$$hSerio L et al.$$mIOP Conf. Series: Materials Science and Engineering 101$$o3$$tCERN experience and strategy for the maintenance of cryogenic plants and distribution systems$$x[3] Serio L et al 2015 CERN experience and strategy for the maintenance of cryogenic plants and distribution systems IOP Conf. Series: Materials Science and Engineering 101$$y2015
002621062 999C5 $$9CURATOR$$9refextract$$hMallon Amerigo S, Martel P, Petit S and Widegren D$$mProc. ICALEPCS Kobe Japan 72$$o4$$tCERN’s global equipment data repository$$x[4] Mallon Amerigo S, Martel P, Petit S and Widegren D 2009 CERN’s global equipment data repository Proc. ICALEPCS Kobe Japan 72$$y2009
002621062 999C5 $$9refextract$$9CURATOR$$hPerin A, Dhalla F, Gayet Ph and Serio L$$mthis conference$$o5$$tUpgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities$$x[5] Perin A, Dhalla F, Gayet Ph and Serio L 2017 Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities this conference$$y2017
002621062 999C5 $$9refextract$$9CURATOR$$hImam S F, Raza J and Chandima Rathnayake R M$$mInternational Conference on Industrial Engineering and Engineering Management 1479-1483$$o6$$tWorld Class Maintenance (WCM): Measurable Indicators creating opportunities for the Norwegian Oil and Gas industry$$x[6] Imam S F, Raza J and Chandima Rathnayake R M 2013 World Class Maintenance (WCM): Measurable Indicators creating opportunities for the Norwegian Oil and Gas industry IEEE International Conference on Industrial Engineering and Engineering Management 1479-1483$$y2013