CERN Accelerating science

Published Articles
Report number CERN-ACC-2015-009
Title LHC Injectors Upgrade (LIU) Project at CERN
Author(s) Meddahi, Malika (CERN) ; Coupard, Julie (CERN) ; Damerau, Heiko (CERN) ; Funken, Anne (CERN) ; Gilardoni, Simone (CERN) ; Goddard, Brennan (CERN) ; Hanke, Klaus (CERN) ; Kobzeva, Lelyzaveta (CERN) ; Lombardi, Alessandra (CERN) ; Manglunki, Django (CERN) ; Mataguez, Simon (CERN) ; Mikulec, Bettina (CERN) ; Rumolo, Giovanni (CERN) ; Shaposhnikova, Elena (CERN) ; Vretenar, Maurizio (CERN)
Publication 2015
Number of pages 4
In: 6th International Particle Accelerator Conference, Richmond, VA, USA, 3 - 8 May 2015, pp.THPF093
Subject category Accelerators and Storage Rings
Abstract CERN is currently carrying out an ambitious improvement programme of the full LHC Injectors chain in order to enable the delivery of beams with the challenging HL-LHC parameters. The LHC Injectors Upgrade project coordinates this massive upgrade program, and covers a new linac (Linac4 project) as well as upgrades to the Proton Synchrotron Booster, the Proton Synchrotron and Super Proton Synchrotron. The heavy ion injector chain is also included, adding the Linac3 and Low Energy Ion Ring to the list of accelerators concerned. The performance objectives and roadmap of the main upgrades will be presented, including the work status and outlook. The machine studies and milestones during LHC Run 2 will be discussed and a preliminary Long Shutdown 2 installation planning given. Finally, for the LHC Run 3, the beam performance across the full injector chain after all the upgrades will be estimated and the required commissioning stages outlined.
Copyright/License publication: © 2015-2025 The Author(s) (License: CC-BY-3.0)

Corresponding record in: Inspire


 Record created 2016-03-27, last modified 2024-02-23


Published version from JACoW:
Download fulltextPDF
External link:
Download fulltextJACOW