First measurement of the nuclear-recoil ionization yield in silicon at 100 eV
Authors:
M. F. Albakry,
I. Alkhatib,
D. Alonso,
D. W. P. Amaral,
P. An,
T. Aralis,
T. Aramaki,
I. J. Arnquist,
I. Ataee Langroudy,
E. Azadbakht,
S. Banik,
P. S. Barbeau,
C. Bathurst,
R. Bhattacharyya,
P. L. Brink,
R. Bunker,
B. Cabrera,
R. Calkins,
R. A. Cameron,
C. Cartaro,
D. G. CerdeƱo,
Y. -Y. Chang,
M. Chaudhuri,
R. Chen,
N. Chott
, et al. (115 additional authors not shown)
Abstract:
We measured the nuclear--recoil ionization yield in silicon with a cryogenic phonon-sensitive gram-scale detector. Neutrons from a mono-energetic beam scatter off of the silicon nuclei at angles corresponding to energy depositions from 4\,keV down to 100\,eV, the lowest energy probed so far. The results show no sign of an ionization production threshold above 100\,eV. These results call for furthe…
▽ More
We measured the nuclear--recoil ionization yield in silicon with a cryogenic phonon-sensitive gram-scale detector. Neutrons from a mono-energetic beam scatter off of the silicon nuclei at angles corresponding to energy depositions from 4\,keV down to 100\,eV, the lowest energy probed so far. The results show no sign of an ionization production threshold above 100\,eV. These results call for further investigation of the ionization yield theory and a comprehensive determination of the detector response function at energies below the keV scale.
△ Less
Submitted 3 March, 2023;
originally announced March 2023.
A Strategy for Low-Mass Dark Matter Searches with Cryogenic Detectors in the SuperCDMS SNOLAB Facility
Authors:
SuperCDMS Collaboration,
M. F. Albakry,
I. Alkhatib,
D. W. P. Amaral,
T. Aralis,
T. Aramaki,
I. J. Arnquist,
I. Ataee Langroudy,
E. Azadbakht,
S. Banik,
C. Bathurst,
D. A. Bauer,
R. Bhattacharyya,
P. L. Brink,
R. Bunker,
B. Cabrera,
R. Calkins,
R. A. Cameron,
C. Cartaro,
D. G. Cerdeno,
Y. -Y. Chang,
M. Chaudhuri,
R. Chen,
N. Chott,
J. Cooley
, et al. (103 additional authors not shown)
Abstract:
The SuperCDMS Collaboration is currently building SuperCDMS SNOLAB, a dark matter search focused on nucleon-coupled dark matter in the 1-5 GeV/c$^2$ mass range. Looking to the future, the Collaboration has developed a set of experience-based upgrade scenarios, as well as novel directions, to extend the search for dark matter using the SuperCDMS technology in the SNOLAB facility. The experienced-ba…
▽ More
The SuperCDMS Collaboration is currently building SuperCDMS SNOLAB, a dark matter search focused on nucleon-coupled dark matter in the 1-5 GeV/c$^2$ mass range. Looking to the future, the Collaboration has developed a set of experience-based upgrade scenarios, as well as novel directions, to extend the search for dark matter using the SuperCDMS technology in the SNOLAB facility. The experienced-based scenarios are forecasted to probe many square decades of unexplored dark matter parameter space below 5 GeV/c$^2$, covering over 6 decades in mass: 1-100 eV/c$^2$ for dark photons and axion-like particles, 1-100 MeV/c$^2$ for dark-photon-coupled light dark matter, and 0.05-5 GeV/c$^2$ for nucleon-coupled dark matter. They will reach the neutrino fog in the 0.5-5 GeV/c$^2$ mass range and test a variety of benchmark models and sharp targets. The novel directions involve greater departures from current SuperCDMS technology but promise even greater reach in the long run, and their development must begin now for them to be available in a timely fashion.
The experienced-based upgrade scenarios rely mainly on dramatic improvements in detector performance based on demonstrated scaling laws and reasonable extrapolations of current performance. Importantly, these improvements in detector performance obviate significant reductions in background levels beyond current expectations for the SuperCDMS SNOLAB experiment. Given that the dominant limiting backgrounds for SuperCDMS SNOLAB are cosmogenically created radioisotopes in the detectors, likely amenable only to isotopic purification and an underground detector life-cycle from before crystal growth to detector testing, the potential cost and time savings are enormous and the necessary improvements much easier to prototype.
△ Less
Submitted 1 April, 2023; v1 submitted 16 March, 2022;
originally announced March 2022.