CERN Accélérateur de science

CERN Document Server 2,047 notices trouvées  1 - 10suivantfin  aller vers la notice: La recherche a duré 0.88 secondes. 
1.
Identification and Removal of SPS Aperture Limitations / Kain, Verena (CERN) ; Alemany-Fernández, Reyes (CERN) ; Bartosik, Hannes (CERN) ; Cettour Cave, Stephane (CERN) ; Cornelis, Karel (CERN) ; Cruikshank, Paul (CERN) ; Ferreira Somoza, Jose (CERN) ; Goddard, Brennan (CERN) ; Pasquino, Chiara (CERN)
The CERN SPS (Super Proton Synchrotron) serves as LHC injector and provides beam for the North Area fixed target experiments. Since the 2016 run automated local aperture scans have been performed with the main focus on the vertical plane where limitations typically arise due to the flat vacuum chambers in most SPS elements. [...]
CERN-ACC-2018-102.- 2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF021 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF021
2.
Lifetime and Beam Losses Studies of Partially Strip Ions in the SPS ($^{129}$Xe$^{39+}$) / Hirlaender, Simon (CERN) ; Alemany-Fernández, Reyes (CERN) ; Bartosik, Hannes (CERN) ; Biancacci, Nicolo (CERN) ; Bohl, Thomas (CERN) ; Cettour Cave, Stephane (CERN) ; Cornellis, Karel (CERN) ; Goddard, Brennan (CERN) ; Kain, Verena (CERN) ; Krasny, Mieczyslaw (Paris U., VI-VII ; Paris, IN2P3 ; CERN) et al.
The CERN multipurpose Gamma Factory proposal relies on using Partially Stripped Ion (PSI) beams, instead of electron beams, as the drivers of its light source. If such beams could be successfully stored in the LHC ring, fluxes of the order of $10^{17}$ photons/s, in the $\gamma$-ray energy domain of $1 \leq \rm{E}_{\gamma} \leq 400$ MeV could be achieved. [...]
CERN-ACC-2018-155; CERN-PBC-CONF-2021-016.- 2018 - 3 p. - Published in : 10.18429/JACoW-IPAC2018-THPMF015 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.THPMF015
3.
Automatic Local Aperture Measurements in the SPS / Kain, Verena (CERN) ; Bartosik, Hannes (CERN) ; Cettour Cave, Stephane (CERN) ; Cornelis, Karel (CERN) ; Velotti, Francesco (CERN)
The CERN SPS (Super Proton Synchrotron) serves as LHC injector and provides beam for the North Area fixed target experiments. It is equipped with flat vacuum chambers to accommodate the large horizontal beam size required during transition crossing and slow extraction. [...]
CERN-ACC-2017-113.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-THPAB147 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.THPAB147
4.
Performance of the CERN Low Energy Ion Ring (LEIR) with Xenon beams / Alemany-Fernández, Reyes (CERN) ; Albright, Simon (CERN) ; Andujar, Oscar (CERN) ; Angoletta, Maria Elena (CERN) ; Axensalva, Jerome (CERN) ; Bartosik, Hannes (CERN) ; Baud, Guillaume (CERN) ; Biancacci, Nicolo (CERN) ; Bozzolan, Michele (CERN) ; Cettour Cave, Stephane (CERN) et al.
In 2017 the CERN Low Energy Ion Ring demonstrated once more the feasibility of injecting, accumulating, cooling and accelerating a new nuclei, $^{129}$Xe${39+}$. The operation of this new ion species started at the beginning of March with the start up of the xenon ion source and the Linac3. [...]
CERN-ACC-2018-144.- 2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-TUPAF020 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.TUPAF020
5.
Amorphous Carbon Coating in SPS / Vollenberg, Wil (CERN) ; Chiggiato, Paolo (CERN) ; Costa Pinto, Pedro (CERN) ; Cruikshank, Paul (CERN) ; Moreno, Harold (CERN) ; Pasquino, Chiara (CERN) ; Perez Espinos, Jaime (CERN) ; Taborelli, Mauro (CERN)
Within the LHC Injector Upgrade (LIU) project, the Super Proton Synchrotron (SPS) needs to be upgraded to inject into the LHC higher intensity and brighter 25-ns bunch spaced beams. To mitigate the Electron Multipacting (E.M.) phenomenon, a well-known limiting factor for high-intensity positively charged beams, CERN developed carbon coatings with a low Secondary Electron Yield (SEY). [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IPAC 2021 (2021) 3475-3478 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.3475-3478
6.
Amorphous Carbon Thin Film Coating of the SPS Beamline: Evaluation of the First Coating Implementation / Van Gompel, Matthias (CERN) ; Chiggiato, Paolo (CERN) ; Costa Pinto, Pedro (CERN) ; Cruikshank, Paul (CERN) ; Pasquino, Chiara (CERN) ; Perez Espinos, Jaime (CERN) ; Sapountzis, Antonios (CERN) ; Taborelli, Mauro (CERN) ; Vollenberg, Wilhelmus (CERN)
As part of the LHC Injector Upgrade (LIU) project, the Super Proton Synchrotron (SPS) must be upgraded in order to inject in the LHC 25 ns bunch spaced beams of higher intensity. To mitigate the Electron Multipacting (EM) phenomenon in the SPS, CERN developed thin film carbon coatings with a low Secondary Electron Yield (SEY). [...]
CERN-ACC-2017-304.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-MOOCA3 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.MOOCA3
7.
LHC Injectors Upgrade Project: Outlook of the Modifications to the Super Proton Synchrotron (SPS) Vacuum System and Impact on the Operation of the Carbon-Coated Vacuum Chambers / Pasquino, Chiara (CERN) ; Bregliozzi, Giuseppe (CERN) ; Chiggiato, Paolo (CERN) ; Cruikshank, Paul (CERN) ; Farricker, Aaron (CERN) ; Harrison, Anthony (CERN) ; Perez Espinos, Jaime (CERN) ; Somoza, Jose (CERN) ; Taborelli, Mauro (CERN) ; Vollinger, Christine (CERN) et al.
Aiming at doubling the beam intensity and reducing the beam emittance [1], significant modifications of the LHC injector chain will take place during Long Shutdown 2 (LS2), starting from 2019. The LIU project (LHC Injector Upgrade) [2], in the specific, touches Linac4, the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS), the Super Proton Synchrotron (SPS). [...]
2018 - 3 p. - Published in : 10.18429/JACoW-IPAC2018-WEPMF087 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPMF087
8.
AWAKE Proton Beam Commissioning / Schmidt, Janet (CERN) ; Barrientos, Diego (CERN) ; Barros Marin, Manoel (CERN) ; Biskup, Bartolomej (CERN) ; Boccardi, Andrea (CERN) ; Bogey, Thierry (CERN) ; Bohl, Thomas (CERN) ; Bracco, Chiara (CERN) ; Cettour Cave, Stephane (CERN) ; Damerau, Heiko (CERN) et al.
AWAKE will be the first proton driven plasma wakefield acceleration experiment worldwide. The facility is located in the former CNGS area at CERN and includes a proton, laser and electron beam line merging in a 10 m long plasma cell, which is followed by the experimental diagnostics. [...]
2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-TUPIK032 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.TUPIK032
9.
Removing Known SPS Intensity Limitations for High Luminosity LHC Goals / Shaposhnikova, Elena (CERN) ; Argyropoulos, Theodoros (CERN) ; Bohl, Thomas (CERN) ; Cruikshank, Paul (CERN) ; Goddard, Brennan (CERN) ; Kaltenbacher, Thomas (CERN) ; Lasheen, Alexandre (CERN) ; Perez Espinos, Jaime (CERN) ; Repond, Joël (CERN) ; Salvant, Benoit (CERN) et al.
In preparation of the SPS as an LHC injector its impedance was significantly reduced in 1999 - 2000. A new SPS impedance reduction campaign is planned now for the High Luminosity (HL)-LHC project, which requires bunch intensities twice as high as the nominal one. [...]
CERN-ACC-2016-289.- 2016 - 3 p. - Published in : 10.18429/JACoW-IPAC2016-MOPOY058 Published version from JACoW: PDF;
In : 7th International Particle Accelerator Conference, Busan, Korea, 8 - 13 May 2016, pp.MOPOY058
10.
Design of a Magnetic Bump Tail Scraping System for the CERN SPS / Mete, Öznur (CERN) ; Bauche, Jeremie (CERN) ; Cerutti, Francesco (CERN) ; Cettour Cave, Stephane (CERN) ; Cornelis, Karel (CERN) ; Drøsdal, Lene (CERN) ; Galleazzi, Frederic (CERN) ; Goddard, Brennan (CERN) ; Jensen, Lars (CERN) ; Kain, Verena (CERN) et al.
The LHC injectors are being upgraded to meet the demanding beam specification required for High Luminosity LHC (HL-LHC) operation. In order to reduce the beam losses which can trigger the sensitive LHC beam loss interlocks during the SPS-to-LHC beam injection process, it is important that the beam tails are properly scraped away in the SPS. [...]
2013 - 3 p. - Published in : (2013) , pp. THPEA040 Fulltext: PDF; External link: Published version from JACoW
In : 4th International Particle Accelerator Conference, Shanghai, China, 12 - 17 May 2013, pp.3228

Vous n'avez pas trouvé ce que vous avez cherché? Essayez votre requête sur d'autres serveurs:
recid:2649950 dans Amazon
recid:2649950 dans CERN EDMS
recid:2649950 dans CERN Intranet
recid:2649950 dans CiteSeer
recid:2649950 dans Google Books
recid:2649950 dans Google Scholar
recid:2649950 dans Google Web
recid:2649950 dans IEC
recid:2649950 dans IHS
recid:2649950 dans INSPIRE
recid:2649950 dans ISO
recid:2649950 dans KISS Books/Journals
recid:2649950 dans KISS Preprints
recid:2649950 dans NEBIS
recid:2649950 dans SLAC Library Catalog