CERN Accelerating science

CERN Document Server 27 records found  1 - 10nextend  jump to record: Search took 0.59 seconds. 
1.
Achievements of KEKB / Abe, Tetsuo (KEK, Tsukuba) ; Akai, Kazunori (KEK, Tsukuba) ; Akasaka, Norimasa (KEK, Tsukuba) ; Akemoto, Mitsuo (KEK, Tsukuba) ; Akiyama, Atsuyoshi (KEK, Tsukuba) ; Arinaga, Mitsuhiro (KEK, Tsukuba) ; Cai, Yunhai (SLAC) ; Ebihara, Kiyokazu (KEK, Tsukuba) ; Egawa, Kazumi (KEK, Tsukuba) ; Enomoto, Atsushi (KEK, Tsukuba) et al.
The machine commissioning of KEKB started in December 1998 and its operation was terminated at the end of June 2010 to upgrade KEKB to SuperKEKB. In this paper, we summarize the history of KEKB and show the achievements made there..
2013 - Published in : Prog. Theor. Exp. Phys. 2013 (2013) 03A001
2.
Performance of KEKB with crab cavities / Funakoshi, Y (KEK, Tsukuba) ; Abe, T (KEK, Tsukuba) ; Akai, K (KEK, Tsukuba) ; Akemoto, M (KEK, Tsukuba) ; Akiyama, A (KEK, Tsukuba) ; Arinaga, M (KEK, Tsukuba) ; Ebihara, K (KEK, Tsukuba) ; Egawa, K (KEK, Tsukuba) ; Enomoto, A (KEK, Tsukuba) ; Flanagan, J (KEK, Tsukuba) et al.
2008 - 5 p. External link: Published version from JACoW
In : 11th European Particle Accelerator Conference, Genoa, Italy, 23 - 27 Jun 2008, pp.WEXG01
3.
Solidification and Melting of $^{4}He$ in Aerogel Observed by Ultrasound Propagation / Matsumoto, Koichi ; Yoshino, Keiichi ; Abe, Satoshi ; Suzuki, Haruhiko ; Tajiri, Koji
2006 - Published in : AIP Conf. Proc.: 850 (2006) , pp. 347-348 External link: Published version from AIP
In : 24th International Conference on Low Temperature Physics, Orlando, FL, USA, 10 - 17 Aug 2005, pp.347-348
4.
An Alignment of J-PARC Linac / Morishita, Takatoshi ; Ao, Hiroyuki ; Hasegawa, Kazuo ; Ikegami, Masanori ; Ito, Takashi ; Kubota, Chikashi ; Naito, Fujio ; Takasaki, Eiichi ; Tanaka, Hirokazu ; Ueno, Akira et al.
J-PARC linear accelerator components are now being installed in the accelerator tunnel, whose total length is more than 400 m including the beam transport line to RCS (Rapid Cycling Synchrotron). A precise alignment of accelerator components is essential for a high quality beam acceleration. [...]
2005 External link: Published version from JACoW
In : 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.2851
5.
Technologies of The Peripheral Equipments of The J-PARC DTL1 for the Beam Test / Yoshino, K ; Fukui, Y ; Kadokura, E ; Kato, T ; Kubota, C ; Naito, F ; Takasaki, E ; Tanaka, H
First beam test of the DTL1 was performed in November of 2003 at KEK site. A 30 mA H-
2004 External link: Published version from JACoW
In : 22nd International Linear Accelerator Conference, Lubeck, Germany, 16 - 20 Aug 2004, pp.480
6.
Results of the Magnetic Field Measurements of the DTL Quadrupole Magnets for the J-PARC / Takasaki, E ; Naito, F ; Tanaka, H ; Yoshino, K
A quadrupole electromagnet is installed in the drift tube, which has an outer diameter of 140 mm and its minimum length of 53 mm. Hence, a coil of this magnet was made by the advanced periodic reverse copper electroforming method instead of the conventional hollow conductor. [...]
2004 External link: Published version from JACoW
In : 22nd International Linear Accelerator Conference, Lubeck, Germany, 16 - 20 Aug 2004, pp.468
7.
Results of the High-Power Conditioning and the First Beam Acceleration of the DTL-1 for J-PARC / Naito, F ; Anami, S ; Chiba, J ; Fukui, Y ; Furukawa, K ; Igarashi, Z ; Ikegami, K ; Ikegami, M ; Kadokura, E ; Kamikubota, N et al.
The first tank of the DTL for Japan Proton Accelerator Research Complex (J-PARC) was installed in the test facility at KEK. The DTL tank is 9.9 m in length and consists of the 76 cells. [...]
2004 External link: Published version from JACoW
In : 22nd International Linear Accelerator Conference, Lubeck, Germany, 16 - 20 Aug 2004, pp.300
8.
J-PARC Linac Alignment / Ikegami, M ; Kubota, C ; Naito, F ; Takasaki, E ; Tanaka, H ; Yoshino, K
J-PARC linac consists of a 3 MeV RFQ linac, a 50 MeV DTL (Drift Tube Linac), a 190 MeV SDTL (Separate-type DTL), and a 400 MeV ACS (Annular-Coupled Structure) linac, and its total length is more than 400 m including the beam transport line to the succeeding RCS (Rapid Cycling Synchrotron). In high-current proton accelerators, precise alignment of accelerator components is indispensable to reduce uncontrolled beam loss and beam quality deterioration. [...]
2004 External link: Published version from JACoW
In : 22nd International Linear Accelerator Conference, Lubeck, Germany, 16 - 20 Aug 2004, pp.474
9.
JKJ 60 MeV DTL / Naito, F ; Ikegami, M ; Ino, H ; Ito, T ; Kabeya, Zenzaburo ; Kato, T ; Kawasumi, T ; Kobayashi, S ; Kubota, C ; Nakamura, T et al.
2000
In : 15th Meeting of the International Collaboration on Advanced Neutron Sources, v.1, Tsukuba, Japan, 6 - 9 Nov 2000, pp.191-196
10.
Laser-Based Alignment System for the J-PARC Linac / Ikegami, M ; Higashi, Y ; Kato, T ; Yoshino, K
2003 - 3 p. External link: Published version from JACoW
In : 20th IEEE Particle Accelerator Conference, Portland, OR, USA, 12 - 16 May 2003, pp.2393

CERN Document Server : 27 records found   1 - 10nextend  jump to record:
See also: similar author names
2 Yoshino, Kazuo
1 Yoshino, Kazuyoshi
1 Yoshino, Keiichi
1 Yoshino, Ken-ichiro
1 Yoshino, Kouichi
Interested in being notified about new results for this query?
Set up a personal email alert or subscribe to the RSS feed.
Haven't found what you were looking for? Try your search on other servers:
Yoshino, K in Amazon
Yoshino, K in CERN EDMS
Yoshino, K in CERN Intranet
Yoshino, K in CiteSeer
Yoshino, K in Google Books
Yoshino, K in Google Scholar
Yoshino, K in Google Web
Yoshino, K in IEC
Yoshino, K in IHS
Yoshino, K in INSPIRE
Yoshino, K in ISO
Yoshino, K in KISS Books/Journals
Yoshino, K in KISS Preprints
Yoshino, K in NEBIS
Yoshino, K in SLAC Library Catalog
Yoshino, K in Scirus