000928278 001__ 928278
000928278 003__ SzGeCERN
000928278 005__ 20240223163345.0
000928278 041__ $$aeng
000928278 100__ $$aToyama, Takeshi
000928278 245__ $$aBeam Diagnostics for the J-PARC Main Ring Synchrotron
000928278 260__ $$c2005
000928278 520__ $$aBeam diagnostics: beam intensity monitors (DCCT, SCT, FCT, WCM), beam position monitors (ESM), beam loss monitors (proportional chamber, air ion chamber), beam profile monitors (secondary electron emission, gas-sheet) have been designed, tested, and will be installed for the Main Ring synchrotron of J-PARC (Japan Proton Accelerator Research Complex). This paper describes the basic design principle and specification of each monitor, with a stress on how to cope with high power beam (average circulation current of ~12 A) and low beam loss operation (less than 1 W/m except a collimator region). Some results of preliminary performance test using present beams and a radiation source will be reported.
000928278 595__ $$aSIS PAC05-2006
000928278 65017 $$2SzGeCERN$$aAccelerators and Storage Rings
000928278 690C_ $$aARTICLE
000928278 700__ $$aArakawa, Dai
000928278 700__ $$aHashimoto, Yoshinori
000928278 700__ $$aHayashi, Naoki
000928278 700__ $$aKishiro, Junichi
000928278 700__ $$aLee, Seishu
000928278 700__ $$aMiura, Takako
000928278 700__ $$aMuto, Suguru
000928278 700__ $$aToyokawa, Ryoji
000928278 8564_ $$uhttps://accelconf.web.cern.ch/p05/PAPERS/RPAT005.PDF$$yPublished version from JACoW
000928278 901__ $$uJAERI/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
000928278 901__ $$uKEK, Ibaraki
000928278 916__ $$sn$$w200606
000928278 960__ $$a13
000928278 961__ $$c20060717$$h1702$$lCER01$$x20060208
000928278 963__ $$aPUBLIC
000928278 962__ $$b719664$$k958$$nknoxville20050516
000928278 970__ $$a002596125CER
000928278 980__ $$aARTICLE