000928098 245__ $$a5 MW 805 MHz SNS RF System Experience
000928098 260__ $$c2005
000928098 520__ $$aThe RF system for the 805 MHz normal conducting linac of the Spallation Nuetron Source (SNS) accelerator was designed, procured and tested at Los Alamos National Laboratory(LANL) and then installed and commissioned at Oak Ridge National Laboratory (ORNL). The RF power for this room temperature coupled cavity linac (CCL) of SNS accelerator is generated by four pulsed 5 MW peak power klystrons operating with a pulse width of 1.25 mSec and a 60 Hz repetition frequency. The RF power from each klystron is divided and delivered to the CCL through two separate RF windows. The 5 MW RF system advanced the state of the art for simultaneous peak and average power. This paper summarizes the problems encountered, lessons learned and results of the high power testing at LANL of the 5 MW klystrons, 5 MW circulators, 5 MW loads, and 2.5 MW windows.*
000928098 595__ $$aSIS PAC05-2006
000928098 65017 $$2SzGeCERN$$aAccelerators and Storage Rings
000928098 690C_ $$aARTICLE
000928098 700__ $$aAnthony Torrez, Phillip
000928098 700__ $$aHardek, Thomas
000928098 700__ $$aLynch, Michael
000928098 700__ $$aRees, Daniel
000928098 700__ $$aRoybal, William
000928098 700__ $$aTallerico, Paul J
000928098 700__ $$aThomas Bradley, Joseph
000928098 8564_ $$uhttps://accelconf.web.cern.ch/p05/PAPERS/WPAT054.PDF$$yPublished version from JACoW
000928098 901__ $$uLANL, Los Alamos, New Mexico
000928098 901__ $$uLANL/LANSCE, Los Alamos, New Mexico
000928098 916__ $$sn$$w200606
000928098 960__ $$a13
000928098 961__ $$c20060717$$h1639$$lCER01$$x20060208
000928098 963__ $$aPUBLIC
000928098 962__ $$b719664$$k3280$$nknoxville20050516
000928098 970__ $$a002595945CER
000928098 980__ $$aARTICLE